Project: The refurbishment of the main hipped roof NB: All roofing work to be carried out by an NFRC accredited contractor & must be able to self-certify via the competent roofing scheme. As part of contractor pre-survey, contractor should identity any soffit and live extractor fan vents which will need to be disconnected and reconnected during works All flats must be checked to see if there are any live gas appliances, wood burning/multi fuel stoves or open fires still in use prior to the removal of any chimney stacks. Evidence shall be provided to the Aster Surveyor who will be able to authorise this phase of work if necessary. Isolation of flues (priced separately) in line with gas protocols, removals (priced separately) to be discussed and review with client. Aster Surveyor to advise with any blocking up and venting work as the scope of work will need to be agreed with the leaseholder/s or resident/s in advance. Erect tubular steel scaffolding with required lifts to such elevations, including suitable access for removing the shared chimney and dismantle on completion. All scaffolding to be measured against the face of the building and to include the lift heights for a specific work type and trade. Allow for repositioning of existing satellite dishes & T.V. aerials, including re-instating them and testing the signal both inside and outside of a property. NB: The existing T.V. aerials if live will need to be reinstated inside the loft space Remove existing tiles, battens, felt, safely lower to ground level and remove from site. Allow for clearing all debris from the eaves and behind the skeiling/sloping ceiling detail, then insulate using a 50-75mm thick PIR insulation board with a foil backing ensuring that an adequate air gap's left for ventilation. Allow for the supply and install new structural timber to rafters and ridge sections including noggins to fill in any collapsed verge ladder or rotten rafter (Provisional sum included in pricing document but only to be spent with the agreement of Aster surveyor) The contractor must allow for accessing the loft spaces in top floor flats to see if the gable ends have been strapped to provide lateral stability. Allow for supplying and installing Simpson Strong-Tie retrofit restraint straps. (To be installed as per the manufacturers instructions). Supply and fix new Permavent Apex breathable membrane to the entire roof area and fix new 38 x 25 mm treated and Bs coded timber battens to rafters. Supply and install new Redland Duoplain Concrete Interlocking roof tiles including new dry fixed Redland Universal Angle Ridge. Colour to match existing, to be agreed with the contract surveyor prior to ordering. All materials to be installed as per manufacturer’s instructions. Supply and fix eaves support trays G1281 by Manthorpe, including rafter roll fitted as per manufacturer’s instructions. To all roofs in contract. Check the condition of the existing aluminium Ogee guttering and if serviceable clean and check the existing fixtures and fittings are secure and that it doesn’t leak. (The RWGs can remain insitu if found to be in good working order). Allow for supplying and fitting new deep flow guttering including downpipes, connections and associated fixtures & fittings to flat block. Test guttering for leaks and adequate falls. Deliver free of dirt or imperfections. All waste material and debris will be removed from site. The contractor is to leave the properties and surrounding areas etc clean and clear to original condition. Wash down windows, doors, and existing/new PVCu Fascia's/soffits on completion to remove dirt & debris caused by roofing works.
No linked documents found for this notice.
Lot 1 Status: complete
Contract Title: CAS-01177-F4S4Z9 - MAIN BLOCK 4-7 Hawkins Road, Marlborough, SN8 2BX - Roof Renewal
{
"awards": [
{
"id": "1",
"items": [
{
"additionalClassifications": [
{
"description": "Roof maintenance work",
"id": "45261920",
"scheme": "CPV"
},
{
"description": "Roof",
"id": "44112400",
"scheme": "CPV"
}
],
"id": "1",
"relatedLot": "1"
}
],
"mainProcurementCategory": "works",
"relatedLots": [
"1"
],
"status": "active",
"suppliers": [
{
"id": "GB-COH-SC114142",
"name": "Bell Group Ltd"
}
]
}
],
"buyer": {
"id": "GB-COH-IP29573R",
"name": "ASTER GROUP LIMITED"
},
"contracts": [
{
"aboveThreshold": false,
"awardID": "1",
"dateSigned": "2026-01-28T00:00:00+00:00",
"documents": [
{
"datePublished": "2026-01-29T12:18:10Z",
"description": "Contract details notice on Find a Tender",
"documentType": "contractNotice",
"format": "text/html",
"id": "007996-2026",
"noticeType": "UK7",
"url": "https://www.find-tender.service.gov.uk/Notice/007996-2026"
}
],
"id": "1",
"period": {
"endDate": "2026-04-30T23:59:59+01:00",
"startDate": "2026-03-01T00:00:00+00:00"
},
"status": "active",
"title": "CAS-01177-F4S4Z9 - MAIN BLOCK 4-7 Hawkins Road, Marlborough, SN8 2BX - Roof Renewal",
"value": {
"amount": 55925.14,
"amountGross": 67110.17,
"currency": "GBP"
}
}
],
"date": "2026-01-29T12:18:10Z",
"id": "007996-2026",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-h6vhtk-0611ea",
"parties": [
{
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "Devizes",
"postalCode": "SN10 2AZ",
"region": "UKK15",
"streetAddress": "Sarsen Court"
},
"contactPoint": {
"email": "aster.procurement@aster.co.uk"
},
"details": {
"classifications": [
{
"description": "Public authority - sub-central government",
"id": "publicAuthoritySubCentralGovernment",
"scheme": "UK_CA_TYPE"
}
]
},
"id": "GB-COH-IP29573R",
"identifier": {
"id": "IP29573R",
"scheme": "GB-COH"
},
"name": "ASTER GROUP LIMITED",
"roles": [
"buyer"
]
},
{
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "Airdrie",
"postalCode": "ML6 9BG",
"region": "UKM84",
"streetAddress": "Bell Business Park, Rochsolloch Road"
},
"contactPoint": {
"email": "submissions@bellgroup.co.uk"
},
"details": {
"scale": "large",
"url": "https://www.bellgroup.co.uk/",
"vcse": false
},
"id": "GB-COH-SC114142",
"identifier": {
"id": "SC114142",
"scheme": "GB-COH"
},
"name": "Bell Group Ltd",
"roles": [
"supplier"
]
}
],
"tag": [
"award",
"contract"
],
"tender": {
"description": "Project: The refurbishment of the main hipped roof \nNB: All roofing work to be carried out by an NFRC accredited contractor \u0026 must be able to self-certify via the competent roofing scheme. \nAs part of contractor pre-survey, contractor should identity any soffit and live extractor fan vents which will need to be disconnected and reconnected during works \nAll flats must be checked to see if there are any live gas appliances, wood burning/multi fuel stoves or open fires still in use prior to the removal of any chimney stacks. Evidence shall be provided to the Aster Surveyor who will be able to authorise this phase of work if necessary. Isolation of flues (priced separately) in line with gas protocols, removals (priced separately) to be discussed and review with client. \nAster Surveyor to advise with any blocking up and venting work as the scope of work will need to be agreed with the leaseholder/s or resident/s in advance. \nErect tubular steel scaffolding with required lifts to such elevations, including suitable access for removing the shared chimney and dismantle on completion. All scaffolding to be measured against the face of the building and to include the lift heights for a specific work type and trade. \nAllow for repositioning of existing satellite dishes \u0026 T.V. aerials, including re-instating them and testing the signal both inside and outside of a property. NB: The existing T.V. aerials if live will need to be reinstated inside the loft space \nRemove existing tiles, battens, felt, safely lower to ground level and remove from site. \nAllow for clearing all debris from the eaves and behind the skeiling/sloping ceiling detail, then insulate using a 50-75mm thick PIR insulation board with a foil backing ensuring that an adequate air gap\u0027s left for ventilation. \nAllow for the supply and install new structural timber to rafters and ridge sections including noggins to fill in any collapsed verge ladder or rotten rafter (Provisional sum included in pricing document but only to be spent with the agreement of Aster surveyor) \nThe contractor must allow for accessing the loft spaces in top floor flats to see if the gable ends have been strapped to provide lateral stability. \nAllow for supplying and installing Simpson Strong-Tie retrofit restraint straps. (To be installed as per the manufacturers instructions). \nSupply and fix new Permavent Apex breathable membrane to the entire roof area and fix new 38 x 25 mm treated and Bs coded timber battens to rafters. Supply and install new Redland Duoplain Concrete Interlocking roof tiles including new dry fixed Redland Universal Angle Ridge. Colour to match existing, to be agreed with the contract surveyor prior to ordering. All materials to be installed as per manufacturer\u2019s instructions. \nSupply and fix eaves support trays G1281 by Manthorpe, including rafter roll fitted as per manufacturer\u2019s instructions. To all roofs in contract. \nCheck the condition of the existing aluminium Ogee guttering and if serviceable clean and check the existing fixtures and fittings are secure and that it doesn\u2019t leak. (The RWGs can remain insitu if found to be in good working order). \nAllow for supplying and fitting new deep flow guttering including downpipes, connections and associated fixtures \u0026 fittings to flat block. \nTest guttering for leaks and adequate falls. Deliver free of dirt or imperfections. All waste material and debris will be removed from site. \nThe contractor is to leave the properties and surrounding areas etc clean and clear to original condition. Wash down windows, doors, and existing/new PVCu Fascia\u0027s/soffits on completion to remove dirt \u0026 debris caused by roofing works.",
"id": "ocds-h6vhtk-0611ea",
"legalBasis": {
"id": "2023/54",
"scheme": "UKPGA",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
},
"lots": [
{
"id": "1",
"status": "complete"
}
],
"procurementMethod": "limited",
"procurementMethodDetails": "Below threshold - limited competition",
"status": "complete",
"title": "MAIN BLOCK 4-7 Hawkins Road - 2025-2026 Planned roof programme - Pitched Roof"
}
}