← Back to opportunities

Roofing Services - including Planned Preventative Maintenance, Roof installations and replacements and Reactive Maintenance Works

NEUPC Ltd

Buyer Contact Info

Buyer Name: NEUPC Ltd

Buyer Address: Phoenix House, 3 South Parade, Leeds, UKE42, LS1 5QX, United Kingdom

Contact Name: Jon Lisle

Contact Email: j.lisle@neupc.ac.uk

Contact Telephone: +44 1134871764

Status
active
Procedure
open
Value
32000000.0 GBP
Gross: 38400000.0 GBP
Published
30 Jan 2026, 19:05
Deadline
02 Mar 2026, 23:59
Contract Start
n/a
Contract End
n/a
Category
works
CPV
44112400 - Roof
Region
n/a
Awarded To
n/a
Official Source
Open Find a Tender

Description

This invitation to tender is issued by North Eastern Universities Purchasing Consortium ("NEUPC") for the establishment of a framework agreement for the provision of a range of Roofing Services that will be available to all members of NEUPC, NWUPC and SUPC, where their buildings are situated within the serviced regions. To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=989496995

Linked Documents

No linked documents found for this notice.

Opportunity Context

More Information Links

External Link: https://www.find-tender.service.gov.uk/Notice/008688-2026

Link Description: Tender notice on Find a Tender

Lots

Lot Title: Planned, Preventative Maintenance Services (North East)

Lot Description: NORTH EAST The Planned Preventative Maintenance core services will include, but are not limited to: •Installing roof coverings •Repairing and maintaining roof coverings – these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market. •Treating roofs with spray paint, industrial coating and asphalt •Applying roof sealer compounds and cleaning existing roofing materials •Installing spouts, duct work, capping and drainage on roofs •Gutter repairs, maintenance and cleaning •Fascias and Soffit repairs, maintenance, cleaning and replacement •Chimney repointing and repairs •Pointing/Re-pointing •Insulation works •Concrete works and repairs •Leadwork and flashing •Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc. Non-mandatory (Supplementary) Services Bidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission. Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 1. •Condition Surveys •Installation of new roofs or full/part replacement of existing roofs and associated works) For New/Replacement Roofs only, bidders will be required to satisfy NEUPC’s minimum requirements by submitting case study evidence. This evidence will be reviewed by NEUPC but will not be subject to a scored assessment. Any Lot 1 PPM successful supplier that satisfies the minimum requirements will be approved by NEUPC to offer clients these services, however it will be at the discretion of the client whether to approach the supplier for these services based on their own assessment of the minimum evidence submitted and any other minimum requirements they may request. •Principal Contractor A principal roofing contractor will oversee and manage the construction phase of a project, coordinating all roofing work and ensuring CDM regulations and health and safety standards are met. They are responsible for planning, managing, and coordinating the project, and they appoint and oversee subcontractors to complete various parts of the work. There is typically only one principal contractor for a project at any given time. •Solar PV Panel Cleaning •Roof glazing installation and maintenance •Roof cleaning •Ice/snow removal Solar PV panel installation and maintenance is out of scope.

Lot 1a Status: active

Lot 1a Value: GBP 4,200,000.00

Lot 1a Value (Gross): GBP 5,040,000.00

Lot 1a Contract Start: 2026-05-04T00:00:00+01:00

Lot 1a Contract End: 2029-05-03T23:59:59+01:00

Lot 1a SME Suitable: Yes

Lot 1a Award Criterion (quality): Criterion 1 (60%)

Lot 1a Award Criterion (price): Criterion 2 (40%)

Lot Title: Planned Preventative Maintenance Services (Yorkshire & Humber)

Lot Description: YORKSHIRE & HUMBER The Planned Preventative Maintenance core services will include, but are not limited to: •Installing roof coverings •Repairing and maintaining roof coverings – these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market. •Treating roofs with spray paint, industrial coating and asphalt •Applying roof sealer compounds and cleaning existing roofing materials •Installing spouts, duct work, capping and drainage on roofs •Gutter repairs, maintenance and cleaning •Fascias and Soffit repairs, maintenance, cleaning and replacement •Chimney repointing and repairs •Pointing/Re-pointing •Insulation works •Concrete works and repairs •Leadwork and flashing •Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc. Non-mandatory (Supplementary) Services Bidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission. Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 1. •Condition Surveys •Installation of new roofs or full/part replacement of existing roofs and associated works) For New/Replacement Roofs only, bidders will be required to satisfy NEUPC’s minimum requirements by submitting case study evidence. This evidence will be reviewed by NEUPC but will not be subject to a scored assessment. Any Lot 1 PPM successful supplier that satisfies the minimum requirements will be approved by NEUPC to offer clients these services, however it will be at the discretion of the client whether to approach the supplier for these services based on their own assessment of the minimum evidence submitted and any other minimum requirements they may request. •Principal Contractor A principal roofing contractor will oversee and manage the construction phase of a project, coordinating all roofing work and ensuring CDM regulations and health and safety standards are met. They are responsible for planning, managing, and coordinating the project, and they appoint and oversee subcontractors to complete various parts of the work. There is typically only one principal contractor for a project at any given time. •Solar PV Panel Cleaning •Roof glazing installation and maintenance •Roof cleaning •Ice/snow removal Solar PV panel installation and maintenance is out of scope.

Lot 1b Status: active

Lot 1b Value: GBP 4,200,000.00

Lot 1b Value (Gross): GBP 5,040,000.00

Lot 1b Contract Start: 2026-05-04T00:00:00+01:00

Lot 1b Contract End: 2029-05-03T23:59:59+01:00

Lot 1b SME Suitable: Yes

Lot 1b Award Criterion (quality): Criterion 1 (60%)

Lot 1b Award Criterion (price): Criterion 2 (40%)

Lot Title: Planned, Preventative Maintenance Services (East)

Lot Description: EAST The Planned Preventative Maintenance core services will include, but are not limited to: •Installing roof coverings •Repairing and maintaining roof coverings – these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market. •Treating roofs with spray paint, industrial coating and asphalt •Applying roof sealer compounds and cleaning existing roofing materials •Installing spouts, duct work, capping and drainage on roofs •Gutter repairs, maintenance and cleaning •Fascias and Soffit repairs, maintenance, cleaning and replacement •Chimney repointing and repairs •Pointing/Re-pointing •Insulation works •Concrete works and repairs •Leadwork and flashing •Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc. Non-mandatory (Supplementary) Services Bidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission. Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 1. •Condition Surveys •Installation of new roofs or full/part replacement of existing roofs and associated works) For New/Replacement Roofs only, bidders will be required to satisfy NEUPC’s minimum requirements by submitting case study evidence. This evidence will be reviewed by NEUPC but will not be subject to a scored assessment. Any Lot 1 PPM successful supplier that satisfies the minimum requirements will be approved by NEUPC to offer clients these services, however it will be at the discretion of the client whether to approach the supplier for these services based on their own assessment of the minimum evidence submitted and any other minimum requirements they may request. •Principal Contractor A principal roofing contractor will oversee and manage the construction phase of a project, coordinating all roofing work and ensuring CDM regulations and health and safety standards are met. They are responsible for planning, managing, and coordinating the project, and they appoint and oversee subcontractors to complete various parts of the work. There is typically only one principal contractor for a project at any given time. •Solar PV Panel Cleaning •Roof glazing installation and maintenance •Roof cleaning •Ice/snow removal Solar PV panel installation and maintenance is out of scope.

Lot 1c Status: active

Lot 1c Value: GBP 4,200,000.00

Lot 1c Value (Gross): GBP 5,040,000.00

Lot 1c Contract Start: 2026-05-04T00:00:00+01:00

Lot 1c Contract End: 2029-05-03T23:59:59+01:00

Lot 1c SME Suitable: Yes

Lot 1c Award Criterion (quality): Criterion 1 (60%)

Lot 1c Award Criterion (price): Criterion 2 (40%)

Lot Title: Planned, Preventative Maintenance Services (Northern Ireland)

Lot Description: NORTHERN IRELAND The Planned Preventative Maintenance core services will include, but are not limited to: •Installing roof coverings •Repairing and maintaining roof coverings – these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market. •Treating roofs with spray paint, industrial coating and asphalt •Applying roof sealer compounds and cleaning existing roofing materials •Installing spouts, duct work, capping and drainage on roofs •Gutter repairs, maintenance and cleaning •Fascias and Soffit repairs, maintenance, cleaning and replacement •Chimney repointing and repairs •Pointing/Re-pointing •Insulation works •Concrete works and repairs •Leadwork and flashing •Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc. Non-mandatory (Supplementary) Services Bidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission. Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 1. •Condition Surveys •Installation of new roofs or full/part replacement of existing roofs and associated works) For New/Replacement Roofs only, bidders will be required to satisfy NEUPC’s minimum requirements by submitting case study evidence. This evidence will be reviewed by NEUPC but will not be subject to a scored assessment. Any Lot 1 PPM successful supplier that satisfies the minimum requirements will be approved by NEUPC to offer clients these services, however it will be at the discretion of the client whether to approach the supplier for these services based on their own assessment of the minimum evidence submitted and any other minimum requirements they may request. •Principal Contractor A principal roofing contractor will oversee and manage the construction phase of a project, coordinating all roofing work and ensuring CDM regulations and health and safety standards are met. They are responsible for planning, managing, and coordinating the project, and they appoint and oversee subcontractors to complete various parts of the work. There is typically only one principal contractor for a project at any given time. •Solar PV Panel Cleaning •Roof glazing installation and maintenance •Roof cleaning •Ice/snow removal Solar PV panel installation and maintenance is out of scope.

Lot 1d Status: active

Lot 1d Value: GBP 500,000.00

Lot 1d Value (Gross): GBP 600,000.00

Lot 1d Contract Start: 2026-05-04T00:00:00+01:00

Lot 1d Contract End: 2029-05-03T23:59:59+01:00

Lot 1d SME Suitable: Yes

Lot 1d Award Criterion (quality): Criterion 1 (60%)

Lot 1d Award Criterion (price): Criterion 2 (40%)

Lot Title: Planned, Preventative Maintenance Services (North West)

Lot Description: NORTH WEST The Planned Preventative Maintenance core services will include, but are not limited to: •Installing roof coverings •Repairing and maintaining roof coverings – these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market. •Treating roofs with spray paint, industrial coating and asphalt •Applying roof sealer compounds and cleaning existing roofing materials •Installing spouts, duct work, capping and drainage on roofs •Gutter repairs, maintenance and cleaning •Fascias and Soffit repairs, maintenance, cleaning and replacement •Chimney repointing and repairs •Pointing/Re-pointing •Insulation works •Concrete works and repairs •Leadwork and flashing •Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc. Non-mandatory (Supplementary) Services Bidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission. Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 1. •Condition Surveys •Installation of new roofs or full/part replacement of existing roofs and associated works) For New/Replacement Roofs only, bidders will be required to satisfy NEUPC’s minimum requirements by submitting case study evidence. This evidence will be reviewed by NEUPC but will not be subject to a scored assessment. Any Lot 1 PPM successful supplier that satisfies the minimum requirements will be approved by NEUPC to offer clients these services, however it will be at the discretion of the client whether to approach the supplier for these services based on their own assessment of the minimum evidence submitted and any other minimum requirements they may request. •Principal Contractor A principal roofing contractor will oversee and manage the construction phase of a project, coordinating all roofing work and ensuring CDM regulations and health and safety standards are met. They are responsible for planning, managing, and coordinating the project, and they appoint and oversee subcontractors to complete various parts of the work. There is typically only one principal contractor for a project at any given time. •Solar PV Panel Cleaning •Roof glazing installation and maintenance •Roof cleaning •Ice/snow removal Solar PV panel installation and maintenance is out of scope.

Lot 1e Status: active

Lot 1e Value: GBP 500,000.00

Lot 1e Value (Gross): GBP 600,000.00

Lot 1e Contract Start: 2026-05-04T00:00:00+01:00

Lot 1e Contract End: 2029-05-03T23:59:59+01:00

Lot 1e SME Suitable: Yes

Lot 1e Award Criterion (quality): Criterion 1 (60%)

Lot 1e Award Criterion (price): Criterion 2 (40%)

Lot Title: Planned, Preventative Maintenance Services (West)

Lot Description: WEST The Planned Preventative Maintenance core services will include, but are not limited to: •Installing roof coverings •Repairing and maintaining roof coverings – these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market. •Treating roofs with spray paint, industrial coating and asphalt •Applying roof sealer compounds and cleaning existing roofing materials •Installing spouts, duct work, capping and drainage on roofs •Gutter repairs, maintenance and cleaning •Fascias and Soffit repairs, maintenance, cleaning and replacement •Chimney repointing and repairs •Pointing/Re-pointing •Insulation works •Concrete works and repairs •Leadwork and flashing •Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc. Non-mandatory (Supplementary) Services Bidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission. Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 1. •Condition Surveys •Installation of new roofs or full/part replacement of existing roofs and associated works) For New/Replacement Roofs only, bidders will be required to satisfy NEUPC’s minimum requirements by submitting case study evidence. This evidence will be reviewed by NEUPC but will not be subject to a scored assessment. Any Lot 1 PPM successful supplier that satisfies the minimum requirements will be approved by NEUPC to offer clients these services, however it will be at the discretion of the client whether to approach the supplier for these services based on their own assessment of the minimum evidence submitted and any other minimum requirements they may request. •Principal Contractor A principal roofing contractor will oversee and manage the construction phase of a project, coordinating all roofing work and ensuring CDM regulations and health and safety standards are met. They are responsible for planning, managing, and coordinating the project, and they appoint and oversee subcontractors to complete various parts of the work. There is typically only one principal contractor for a project at any given time. •Solar PV Panel Cleaning •Roof glazing installation and maintenance •Roof cleaning •Ice/snow removal Solar PV panel installation and maintenance is out of scope.

Lot 1f Status: active

Lot 1f Value: GBP 4,200,000.00

Lot 1f Value (Gross): GBP 5,040,000.00

Lot 1f Contract Start: 2026-05-04T00:00:00+01:00

Lot 1f Contract End: 2029-05-03T23:59:59+01:00

Lot 1f SME Suitable: Yes

Lot 1f Award Criterion (quality): Criterion 1 (60%)

Lot 1f Award Criterion (price): Criterion 2 (40%)

Lot Title: Planned, Preventative Maintenance Services (West Midlands)

Lot Description: WEST MIDLANDS The Planned Preventative Maintenance core services will include, but are not limited to: •Installing roof coverings •Repairing and maintaining roof coverings – these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market. •Treating roofs with spray paint, industrial coating and asphalt •Applying roof sealer compounds and cleaning existing roofing materials •Installing spouts, duct work, capping and drainage on roofs •Gutter repairs, maintenance and cleaning •Fascias and Soffit repairs, maintenance, cleaning and replacement •Chimney repointing and repairs •Pointing/Re-pointing •Insulation works •Concrete works and repairs •Leadwork and flashing •Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc. Non-mandatory (Supplementary) Services Bidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission. Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 1. •Condition Surveys •Installation of new roofs or full/part replacement of existing roofs and associated works) For New/Replacement Roofs only, bidders will be required to satisfy NEUPC’s minimum requirements by submitting case study evidence. This evidence will be reviewed by NEUPC but will not be subject to a scored assessment. Any Lot 1 PPM successful supplier that satisfies the minimum requirements will be approved by NEUPC to offer clients these services, however it will be at the discretion of the client whether to approach the supplier for these services based on their own assessment of the minimum evidence submitted and any other minimum requirements they may request. •Principal Contractor A principal roofing contractor will oversee and manage the construction phase of a project, coordinating all roofing work and ensuring CDM regulations and health and safety standards are met. They are responsible for planning, managing, and coordinating the project, and they appoint and oversee subcontractors to complete various parts of the work. There is typically only one principal contractor for a project at any given time. •Solar PV Panel Cleaning •Roof glazing installation and maintenance •Roof cleaning •Ice/snow removal Solar PV panel installation and maintenance is out of scope.

Lot 1g Status: active

Lot 1g Value: GBP 4,200,000.00

Lot 1g Value (Gross): GBP 5,040,000.00

Lot 1g Contract Start: 2026-05-04T00:00:00+01:00

Lot 1g Contract End: 2029-05-03T23:59:59+01:00

Lot 1g SME Suitable: Yes

Lot 1g Award Criterion (quality): Criterion 1 (60%)

Lot 1g Award Criterion (price): Criterion 2 (40%)

Lot Title: Reactive Maintenance Services (North East)

Lot Description: NORTH EAST Responsive Repair Services will include reactive/emergency services such as, but not limited to: •Repairing roof coverings – these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market. •Treating roofs with spray paint, industrial coating and asphalt to make good/safe •Applying roof sealer compounds and cleaning existing roofing materials to make good/safe •Gutter cleaning or repair to return to full function and/or make good/safe •Fascias and Soffit replacement or repair to return to full function and/or make good/safe •Chimney repointing and repairs to make good/safe •Pointing to make good/safe •Concrete repairs to make good/safe •Insulation works to make good/safe •Leadwork and flashing to make good/safe •Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc. Non-mandatory (Supplementary) Services Bidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission. Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 2. •Solar PV Panel Cleaning •Roof glazing repairs to make good/safe •Emergency Roof cleaning to make safe •Emergency Ice/snow removal to make safe Solar PV panel installation and maintenance is out of scope.

Lot 2a Status: active

Lot 2a Value: GBP 1,940,000.00

Lot 2a Value (Gross): GBP 2,328,000.00

Lot 2a Contract Start: 2026-05-04T00:00:00+01:00

Lot 2a Contract End: 2029-05-03T23:59:59+01:00

Lot 2a SME Suitable: Yes

Lot 2a Award Criterion (quality): Criterion 1 (60%)

Lot 2a Award Criterion (price): Criterion 2 (40%)

Lot Title: Reactive Maintenance Services (Yorkshire & Humber)

Lot Description: YORKSHIRE & HUMBER Responsive Repair Services will include reactive/emergency services such as, but not limited to: •Repairing roof coverings – these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market. •Treating roofs with spray paint, industrial coating and asphalt to make good/safe •Applying roof sealer compounds and cleaning existing roofing materials to make good/safe •Gutter cleaning or repair to return to full function and/or make good/safe •Fascias and Soffit replacement or repair to return to full function and/or make good/safe •Chimney repointing and repairs to make good/safe •Pointing to make good/safe •Concrete repairs to make good/safe •Insulation works to make good/safe •Leadwork and flashing to make good/safe •Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc. Non-mandatory (Supplementary) Services Bidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission. Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 2. •Solar PV Panel Cleaning •Roof glazing repairs to make good/safe •Emergency Roof cleaning to make safe •Emergency Ice/snow removal to make safe Solar PV panel installation and maintenance is out of scope.

Lot 2b Status: active

Lot 2b Value: GBP 1,940,000.00

Lot 2b Value (Gross): GBP 2,328,000.00

Lot 2b Contract Start: 2026-05-04T00:00:00+01:00

Lot 2b Contract End: 2029-05-03T23:59:59+01:00

Lot 2b SME Suitable: Yes

Lot 2b Award Criterion (quality): Criterion 1 (60%)

Lot 2b Award Criterion (price): Criterion 2 (40%)

Lot Title: Reactive Maintenance Services (East)

Lot Description: EAST Responsive Repair Services will include reactive/emergency services such as, but not limited to: •Repairing roof coverings – these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market. •Treating roofs with spray paint, industrial coating and asphalt to make good/safe •Applying roof sealer compounds and cleaning existing roofing materials to make good/safe •Gutter cleaning or repair to return to full function and/or make good/safe •Fascias and Soffit replacement or repair to return to full function and/or make good/safe •Chimney repointing and repairs to make good/safe •Pointing to make good/safe •Concrete repairs to make good/safe •Insulation works to make good/safe •Leadwork and flashing to make good/safe •Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc. Non-mandatory (Supplementary) Services Bidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission. Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 2. •Solar PV Panel Cleaning •Roof glazing repairs to make good/safe •Emergency Roof cleaning to make safe •Emergency Ice/snow removal to make safe Solar PV panel installation and maintenance is out of scope.

Lot 2c Status: active

Lot 2c Value: GBP 1,940,000.00

Lot 2c Value (Gross): GBP 2,328,000.00

Lot 2c Contract Start: 2026-05-04T00:00:00+01:00

Lot 2c Contract End: 2029-05-03T23:59:59+01:00

Lot 2c SME Suitable: Yes

Lot 2c Award Criterion (quality): Criterion 1 (60%)

Lot 2c Award Criterion (price): Criterion 2 (40%)

Lot Title: Reactive Maintenance Services (Northern Ireland)

Lot Description: NORTHERN IRELAND Responsive Repair Services will include reactive/emergency services such as, but not limited to: •Repairing roof coverings – these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market. •Treating roofs with spray paint, industrial coating and asphalt to make good/safe •Applying roof sealer compounds and cleaning existing roofing materials to make good/safe •Gutter cleaning or repair to return to full function and/or make good/safe •Fascias and Soffit replacement or repair to return to full function and/or make good/safe •Chimney repointing and repairs to make good/safe •Pointing to make good/safe •Concrete repairs to make good/safe •Insulation works to make good/safe •Leadwork and flashing to make good/safe •Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc. Non-mandatory (Supplementary) Services Bidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission. Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 2. •Solar PV Panel Cleaning •Roof glazing repairs to make good/safe •Emergency Roof cleaning to make safe •Emergency Ice/snow removal to make safe Solar PV panel installation and maintenance is out of scope.

Lot 2d Status: active

Lot 2d Value: GBP 150,000.00

Lot 2d Value (Gross): GBP 180,000.00

Lot 2d Contract Start: 2026-05-04T00:00:00+01:00

Lot 2d Contract End: 2029-05-03T23:59:59+01:00

Lot 2d SME Suitable: Yes

Lot 2d Award Criterion (quality): Criterion 1 (60%)

Lot 2d Award Criterion (price): Criterion 2 (40%)

Lot Title: Reactive Maintenance Services (North West)

Lot Description: Responsive Repair Services will include reactive/emergency services such as, but not limited to: •Repairing roof coverings – these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market. •Treating roofs with spray paint, industrial coating and asphalt to make good/safe •Applying roof sealer compounds and cleaning existing roofing materials to make good/safe •Gutter cleaning or repair to return to full function and/or make good/safe •Fascias and Soffit replacement or repair to return to full function and/or make good/safe •Chimney repointing and repairs to make good/safe •Pointing to make good/safe •Concrete repairs to make good/safe •Insulation works to make good/safe •Leadwork and flashing to make good/safe •Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc. Non-mandatory (Supplementary) Services Bidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission. Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 2. •Solar PV Panel Cleaning •Roof glazing repairs to make good/safe •Emergency Roof cleaning to make safe •Emergency Ice/snow removal to make safe Solar PV panel installation and maintenance is out of scope.

Lot 2e Status: active

Lot 2e Value: GBP 150,000.00

Lot 2e Value (Gross): GBP 180,000.00

Lot 2e Contract Start: 2026-05-04T00:00:00+01:00

Lot 2e Contract End: 2029-05-03T23:59:59+01:00

Lot 2e SME Suitable: Yes

Lot 2e Award Criterion (quality): Criterion 1 (60%)

Lot 2e Award Criterion (price): Criterion 2 (40%)

Lot Title: Reactive Maintenance Services (West)

Lot Description: WEST Responsive Repair Services will include reactive/emergency services such as, but not limited to: •Repairing roof coverings – these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market. •Treating roofs with spray paint, industrial coating and asphalt to make good/safe •Applying roof sealer compounds and cleaning existing roofing materials to make good/safe •Gutter cleaning or repair to return to full function and/or make good/safe •Fascias and Soffit replacement or repair to return to full function and/or make good/safe •Chimney repointing and repairs to make good/safe •Pointing to make good/safe •Concrete repairs to make good/safe •Insulation works to make good/safe •Leadwork and flashing to make good/safe •Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc. Non-mandatory (Supplementary) Services Bidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission. Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 2. •Solar PV Panel Cleaning •Roof glazing repairs to make good/safe •Emergency Roof cleaning to make safe •Emergency Ice/snow removal to make safe Solar PV panel installation and maintenance is out of scope.

Lot 2f Status: active

Lot 2f Value: GBP 1,940,000.00

Lot 2f Value (Gross): GBP 2,328,000.00

Lot 2f Contract Start: 2026-05-04T00:00:00+01:00

Lot 2f Contract End: 2029-05-03T23:59:59+01:00

Lot 2f SME Suitable: Yes

Lot 2f Award Criterion (quality): Criterion 1 (60%)

Lot 2f Award Criterion (price): Criterion 2 (40%)

Lot Title: Reactive Maintenance Services (West Midlands)

Lot Description: WEST MIDLANDS Responsive Repair Services will include reactive/emergency services such as, but not limited to: •Repairing roof coverings – these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market. •Treating roofs with spray paint, industrial coating and asphalt to make good/safe •Applying roof sealer compounds and cleaning existing roofing materials to make good/safe •Gutter cleaning or repair to return to full function and/or make good/safe •Fascias and Soffit replacement or repair to return to full function and/or make good/safe •Chimney repointing and repairs to make good/safe •Pointing to make good/safe •Concrete repairs to make good/safe •Insulation works to make good/safe •Leadwork and flashing to make good/safe •Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc. Non-mandatory (Supplementary) Services Bidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission. Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 2. •Solar PV Panel Cleaning •Roof glazing repairs to make good/safe •Emergency Roof cleaning to make safe •Emergency Ice/snow removal to make safe Solar PV panel installation and maintenance is out of scope.

Lot 2g Status: active

Lot 2g Value: GBP 1,940,000.00

Lot 2g Value (Gross): GBP 2,328,000.00

Lot 2g Contract Start: 2026-05-04T00:00:00+01:00

Lot 2g Contract End: 2029-05-03T23:59:59+01:00

Lot 2g SME Suitable: Yes

Lot 2g Award Criterion (quality): Criterion 1 (60%)

Lot 2g Award Criterion (price): Criterion 2 (40%)

Documents

Document Description: Not published

Document Description: Tender notice on Find a Tender

Raw Notice JSON

Expand raw payload
{
  "buyer": {
    "id": "GB-PPON-PVTM-8818-LTHQ",
    "name": "NEUPC Ltd"
  },
  "date": "2026-01-30T19:05:04Z",
  "id": "008688-2026",
  "initiationType": "tender",
  "language": "en",
  "ocid": "ocds-h6vhtk-061394",
  "parties": [
    {
      "address": {
        "country": "GB",
        "countryName": "United Kingdom",
        "locality": "Leeds",
        "postalCode": "LS1 5QX",
        "region": "UKE42",
        "streetAddress": "Phoenix House, 3 South Parade"
      },
      "contactPoint": {
        "email": "j.lisle@neupc.ac.uk",
        "name": "Jon Lisle",
        "telephone": "+44 1134871764"
      },
      "details": {
        "classifications": [
          {
            "description": "Public authority - sub-central government",
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE"
          }
        ]
      },
      "id": "GB-PPON-PVTM-8818-LTHQ",
      "identifier": {
        "id": "PVTM-8818-LTHQ",
        "scheme": "GB-PPON"
      },
      "name": "NEUPC Ltd",
      "roles": [
        "buyer"
      ]
    }
  ],
  "tag": [
    "tender"
  ],
  "tender": {
    "aboveThreshold": true,
    "awardPeriod": {
      "endDate": "2026-04-10T23:59:59+01:00"
    },
    "coveredBy": [
      "GPA"
    ],
    "description": "This invitation to tender is issued by North Eastern Universities Purchasing Consortium (\"NEUPC\") for the establishment of a framework agreement for the provision of a range of Roofing Services that will be available to all members of NEUPC, NWUPC and SUPC, where their buildings are situated within the serviced regions.\nTo view this notice, please click here: \nhttps://www.delta-esourcing.com/delta/viewNotice.html?noticeId=989496995",
    "documents": [
      {
        "description": "Not published",
        "documentType": "conflictOfInterest",
        "id": "conflictOfInterest"
      },
      {
        "datePublished": "2026-01-30T19:05:04Z",
        "description": "Tender notice on Find a Tender",
        "documentType": "tenderNotice",
        "format": "text/html",
        "id": "008688-2026",
        "noticeType": "UK4",
        "url": "https://www.find-tender.service.gov.uk/Notice/008688-2026"
      }
    ],
    "enquiryPeriod": {
      "endDate": "2026-02-20T12:00:00+00:00"
    },
    "id": "EFM2055NE",
    "items": [
      {
        "additionalClassifications": [
          {
            "description": "Roof",
            "id": "44112400",
            "scheme": "CPV"
          },
          {
            "description": "Roofing materials",
            "id": "44112500",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering and roof-painting work",
            "id": "45261200",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering work",
            "id": "45261210",
            "scheme": "CPV"
          },
          {
            "description": "Roof-slating work",
            "id": "45261212",
            "scheme": "CPV"
          },
          {
            "description": "Metal roof-covering work",
            "id": "45261213",
            "scheme": "CPV"
          },
          {
            "description": "Bituminous roof-covering work",
            "id": "45261214",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting and other coating work",
            "id": "45261220",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting work",
            "id": "45261221",
            "scheme": "CPV"
          },
          {
            "description": "Cement roof-coating work",
            "id": "45261222",
            "scheme": "CPV"
          },
          {
            "description": "Roof insulation work",
            "id": "45261410",
            "scheme": "CPV"
          },
          {
            "description": "Waterproofing work",
            "id": "45261420",
            "scheme": "CPV"
          },
          {
            "description": "Roof repair and maintenance work",
            "id": "45261900",
            "scheme": "CPV"
          },
          {
            "description": "Roof repair",
            "id": "45261910",
            "scheme": "CPV"
          },
          {
            "description": "Roof maintenance work",
            "id": "45261920",
            "scheme": "CPV"
          }
        ],
        "deliveryAddresses": [
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKC"
          }
        ],
        "id": "1a",
        "relatedLot": "1a"
      },
      {
        "additionalClassifications": [
          {
            "description": "Roof",
            "id": "44112400",
            "scheme": "CPV"
          },
          {
            "description": "Roofing materials",
            "id": "44112500",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering and roof-painting work",
            "id": "45261200",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering work",
            "id": "45261210",
            "scheme": "CPV"
          },
          {
            "description": "Roof-tiling work",
            "id": "45261211",
            "scheme": "CPV"
          },
          {
            "description": "Roof-slating work",
            "id": "45261212",
            "scheme": "CPV"
          },
          {
            "description": "Metal roof-covering work",
            "id": "45261213",
            "scheme": "CPV"
          },
          {
            "description": "Bituminous roof-covering work",
            "id": "45261214",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting and other coating work",
            "id": "45261220",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting work",
            "id": "45261221",
            "scheme": "CPV"
          },
          {
            "description": "Cement roof-coating work",
            "id": "45261222",
            "scheme": "CPV"
          },
          {
            "description": "Roof insulation work",
            "id": "45261410",
            "scheme": "CPV"
          },
          {
            "description": "Waterproofing work",
            "id": "45261420",
            "scheme": "CPV"
          },
          {
            "description": "Roof repair and maintenance work",
            "id": "45261900",
            "scheme": "CPV"
          },
          {
            "description": "Roof repair",
            "id": "45261910",
            "scheme": "CPV"
          },
          {
            "description": "Roof maintenance work",
            "id": "45261920",
            "scheme": "CPV"
          }
        ],
        "deliveryAddresses": [
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKE"
          }
        ],
        "id": "1b",
        "relatedLot": "1b"
      },
      {
        "additionalClassifications": [
          {
            "description": "Roof",
            "id": "44112400",
            "scheme": "CPV"
          },
          {
            "description": "Roofing materials",
            "id": "44112500",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering and roof-painting work",
            "id": "45261200",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering work",
            "id": "45261210",
            "scheme": "CPV"
          },
          {
            "description": "Roof-slating work",
            "id": "45261212",
            "scheme": "CPV"
          },
          {
            "description": "Metal roof-covering work",
            "id": "45261213",
            "scheme": "CPV"
          },
          {
            "description": "Bituminous roof-covering work",
            "id": "45261214",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting and other coating work",
            "id": "45261220",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting work",
            "id": "45261221",
            "scheme": "CPV"
          }
        ],
        "deliveryAddresses": [
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKF"
          },
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKH"
          },
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKE1"
          }
        ],
        "id": "1c",
        "relatedLot": "1c"
      },
      {
        "additionalClassifications": [
          {
            "description": "Roof",
            "id": "44112400",
            "scheme": "CPV"
          },
          {
            "description": "Roofing materials",
            "id": "44112500",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering and roof-painting work",
            "id": "45261200",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering work",
            "id": "45261210",
            "scheme": "CPV"
          },
          {
            "description": "Roof-slating work",
            "id": "45261212",
            "scheme": "CPV"
          },
          {
            "description": "Metal roof-covering work",
            "id": "45261213",
            "scheme": "CPV"
          },
          {
            "description": "Bituminous roof-covering work",
            "id": "45261214",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting and other coating work",
            "id": "45261220",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting work",
            "id": "45261221",
            "scheme": "CPV"
          }
        ],
        "deliveryAddresses": [
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKN"
          }
        ],
        "id": "1d",
        "relatedLot": "1d"
      },
      {
        "additionalClassifications": [
          {
            "description": "Roof",
            "id": "44112400",
            "scheme": "CPV"
          },
          {
            "description": "Roofing materials",
            "id": "44112500",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering and roof-painting work",
            "id": "45261200",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering work",
            "id": "45261210",
            "scheme": "CPV"
          },
          {
            "description": "Roof-slating work",
            "id": "45261212",
            "scheme": "CPV"
          },
          {
            "description": "Metal roof-covering work",
            "id": "45261213",
            "scheme": "CPV"
          },
          {
            "description": "Bituminous roof-covering work",
            "id": "45261214",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting and other coating work",
            "id": "45261220",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting work",
            "id": "45261221",
            "scheme": "CPV"
          }
        ],
        "deliveryAddresses": [
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKD11"
          },
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKD44"
          }
        ],
        "id": "1e",
        "relatedLot": "1e"
      },
      {
        "additionalClassifications": [
          {
            "description": "Roof",
            "id": "44112400",
            "scheme": "CPV"
          },
          {
            "description": "Roofing materials",
            "id": "44112500",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering and roof-painting work",
            "id": "45261200",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering work",
            "id": "45261210",
            "scheme": "CPV"
          },
          {
            "description": "Roof-slating work",
            "id": "45261212",
            "scheme": "CPV"
          },
          {
            "description": "Metal roof-covering work",
            "id": "45261213",
            "scheme": "CPV"
          },
          {
            "description": "Bituminous roof-covering work",
            "id": "45261214",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting and other coating work",
            "id": "45261220",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting work",
            "id": "45261221",
            "scheme": "CPV"
          }
        ],
        "deliveryAddresses": [
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKD4"
          },
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKD3"
          },
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKL13"
          },
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKD7"
          },
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKD6"
          }
        ],
        "id": "1f",
        "relatedLot": "1f"
      },
      {
        "additionalClassifications": [
          {
            "description": "Roof",
            "id": "44112400",
            "scheme": "CPV"
          },
          {
            "description": "Roofing materials",
            "id": "44112500",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering and roof-painting work",
            "id": "45261200",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering work",
            "id": "45261210",
            "scheme": "CPV"
          },
          {
            "description": "Roof-slating work",
            "id": "45261212",
            "scheme": "CPV"
          },
          {
            "description": "Metal roof-covering work",
            "id": "45261213",
            "scheme": "CPV"
          },
          {
            "description": "Bituminous roof-covering work",
            "id": "45261214",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting and other coating work",
            "id": "45261220",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting work",
            "id": "45261221",
            "scheme": "CPV"
          }
        ],
        "deliveryAddresses": [
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKG"
          }
        ],
        "id": "1g",
        "relatedLot": "1g"
      },
      {
        "additionalClassifications": [
          {
            "description": "Roof",
            "id": "44112400",
            "scheme": "CPV"
          },
          {
            "description": "Roofing materials",
            "id": "44112500",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering and roof-painting work",
            "id": "45261200",
            "scheme": "CPV"
          },
          {
            "description": "Roof-slating work",
            "id": "45261212",
            "scheme": "CPV"
          },
          {
            "description": "Metal roof-covering work",
            "id": "45261213",
            "scheme": "CPV"
          },
          {
            "description": "Bituminous roof-covering work",
            "id": "45261214",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting and other coating work",
            "id": "45261220",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting work",
            "id": "45261221",
            "scheme": "CPV"
          }
        ],
        "deliveryAddresses": [
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKC"
          }
        ],
        "id": "2a",
        "relatedLot": "2a"
      },
      {
        "additionalClassifications": [
          {
            "description": "Roof",
            "id": "44112400",
            "scheme": "CPV"
          },
          {
            "description": "Roofing materials",
            "id": "44112500",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering and roof-painting work",
            "id": "45261200",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering work",
            "id": "45261210",
            "scheme": "CPV"
          },
          {
            "description": "Roof-slating work",
            "id": "45261212",
            "scheme": "CPV"
          },
          {
            "description": "Metal roof-covering work",
            "id": "45261213",
            "scheme": "CPV"
          },
          {
            "description": "Bituminous roof-covering work",
            "id": "45261214",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting and other coating work",
            "id": "45261220",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting work",
            "id": "45261221",
            "scheme": "CPV"
          }
        ],
        "deliveryAddresses": [
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKE"
          }
        ],
        "id": "2b",
        "relatedLot": "2b"
      },
      {
        "additionalClassifications": [
          {
            "description": "Roof",
            "id": "44112400",
            "scheme": "CPV"
          },
          {
            "description": "Roofing materials",
            "id": "44112500",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering and roof-painting work",
            "id": "45261200",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering work",
            "id": "45261210",
            "scheme": "CPV"
          },
          {
            "description": "Roof-slating work",
            "id": "45261212",
            "scheme": "CPV"
          },
          {
            "description": "Metal roof-covering work",
            "id": "45261213",
            "scheme": "CPV"
          },
          {
            "description": "Bituminous roof-covering work",
            "id": "45261214",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting and other coating work",
            "id": "45261220",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting work",
            "id": "45261221",
            "scheme": "CPV"
          }
        ],
        "deliveryAddresses": [
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKF"
          },
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKH"
          },
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKE1"
          }
        ],
        "id": "2c",
        "relatedLot": "2c"
      },
      {
        "additionalClassifications": [
          {
            "description": "Roof",
            "id": "44112400",
            "scheme": "CPV"
          },
          {
            "description": "Roofing materials",
            "id": "44112500",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering and roof-painting work",
            "id": "45261200",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering work",
            "id": "45261210",
            "scheme": "CPV"
          },
          {
            "description": "Roof-slating work",
            "id": "45261212",
            "scheme": "CPV"
          },
          {
            "description": "Metal roof-covering work",
            "id": "45261213",
            "scheme": "CPV"
          },
          {
            "description": "Bituminous roof-covering work",
            "id": "45261214",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting and other coating work",
            "id": "45261220",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting work",
            "id": "45261221",
            "scheme": "CPV"
          }
        ],
        "deliveryAddresses": [
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKN"
          }
        ],
        "id": "2d",
        "relatedLot": "2d"
      },
      {
        "additionalClassifications": [
          {
            "description": "Roof",
            "id": "44112400",
            "scheme": "CPV"
          },
          {
            "description": "Roofing materials",
            "id": "44112500",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering and roof-painting work",
            "id": "45261200",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering work",
            "id": "45261210",
            "scheme": "CPV"
          },
          {
            "description": "Roof-slating work",
            "id": "45261212",
            "scheme": "CPV"
          },
          {
            "description": "Metal roof-covering work",
            "id": "45261213",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting and other coating work",
            "id": "45261220",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting work",
            "id": "45261221",
            "scheme": "CPV"
          }
        ],
        "deliveryAddresses": [
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKD11"
          },
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKD44"
          }
        ],
        "id": "2e",
        "relatedLot": "2e"
      },
      {
        "additionalClassifications": [
          {
            "description": "Roof",
            "id": "44112400",
            "scheme": "CPV"
          },
          {
            "description": "Roofing materials",
            "id": "44112500",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering and roof-painting work",
            "id": "45261200",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering work",
            "id": "45261210",
            "scheme": "CPV"
          },
          {
            "description": "Metal roof-covering work",
            "id": "45261213",
            "scheme": "CPV"
          },
          {
            "description": "Bituminous roof-covering work",
            "id": "45261214",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting and other coating work",
            "id": "45261220",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting work",
            "id": "45261221",
            "scheme": "CPV"
          }
        ],
        "deliveryAddresses": [
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKD4"
          },
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKD3"
          },
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKL13"
          },
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKD7"
          },
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKD6"
          }
        ],
        "id": "2f",
        "relatedLot": "2f"
      },
      {
        "additionalClassifications": [
          {
            "description": "Roof",
            "id": "44112400",
            "scheme": "CPV"
          },
          {
            "description": "Roofing materials",
            "id": "44112500",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering and roof-painting work",
            "id": "45261200",
            "scheme": "CPV"
          },
          {
            "description": "Roof-covering work",
            "id": "45261210",
            "scheme": "CPV"
          },
          {
            "description": "Roof-slating work",
            "id": "45261212",
            "scheme": "CPV"
          },
          {
            "description": "Metal roof-covering work",
            "id": "45261213",
            "scheme": "CPV"
          },
          {
            "description": "Bituminous roof-covering work",
            "id": "45261214",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting and other coating work",
            "id": "45261220",
            "scheme": "CPV"
          },
          {
            "description": "Roof-painting work",
            "id": "45261221",
            "scheme": "CPV"
          }
        ],
        "deliveryAddresses": [
          {
            "country": "GB",
            "countryName": "United Kingdom",
            "region": "UKG"
          }
        ],
        "id": "2g",
        "relatedLot": "2g"
      }
    ],
    "legalBasis": {
      "id": "2023/54",
      "scheme": "UKPGA",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
    },
    "lots": [
      {
        "awardCriteria": {
          "criteria": [
            {
              "name": "Criterion 1",
              "numbers": [
                {
                  "number": 60,
                  "weight": "percentageExact"
                }
              ],
              "type": "quality"
            },
            {
              "name": "Criterion 2",
              "numbers": [
                {
                  "number": 40,
                  "weight": "percentageExact"
                }
              ],
              "type": "price"
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-05-03T23:59:59+01:00",
          "maxExtentDate": "2030-05-03T23:59:59+01:00",
          "startDate": "2026-05-04T00:00:00+01:00"
        },
        "description": "NORTH EAST\nThe Planned Preventative Maintenance core services will include, but are not limited to:\n\u2022Installing roof coverings\n\u2022Repairing and maintaining roof coverings\n\u2013 these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market.\n\u2022Treating roofs with spray paint, industrial coating and asphalt\n\u2022Applying roof sealer compounds and cleaning existing roofing materials\n\u2022Installing spouts, duct work, capping and drainage on roofs\n\u2022Gutter repairs, maintenance and cleaning\n\u2022Fascias and Soffit repairs, maintenance, cleaning and replacement\n\u2022Chimney repointing and repairs\n\u2022Pointing/Re-pointing\n\u2022Insulation works\n\u2022Concrete works and repairs\n\u2022Leadwork and flashing\n\u2022Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc.\nNon-mandatory (Supplementary) Services\nBidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission.  Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 1.\n\u2022Condition Surveys\n\u2022Installation of new roofs or full/part replacement of existing roofs and associated works)\nFor New/Replacement Roofs only, bidders will be required to satisfy NEUPC\u2019s minimum requirements by submitting case study evidence.  This evidence will be reviewed by NEUPC but will not be subject to a scored assessment. \nAny Lot 1 PPM successful supplier that satisfies the minimum requirements will be approved by NEUPC to offer clients these services, however it will be at the discretion of the client whether to approach the supplier for these services based on their own assessment of the minimum evidence submitted and any other minimum requirements they may request.\n\u2022Principal Contractor\nA principal roofing contractor will oversee and manage the construction phase of a project, coordinating all roofing work and ensuring CDM regulations and health and safety standards are met. They are responsible for planning, managing, and coordinating the project, and they appoint and oversee subcontractors to complete various parts of the work. There is typically only one principal contractor for a project at any given time.\n\u2022Solar PV Panel Cleaning\n\u2022Roof glazing installation and maintenance\n\u2022Roof cleaning\n\u2022Ice/snow removal\nSolar PV panel installation and maintenance is out of scope.",
        "hasRenewal": true,
        "id": "1a",
        "renewal": {
          "description": "The framework will be awarded for a fixed period of three years with a possible 12 month extension available subject to demand and performance, making a maximum four year arrangement."
        },
        "status": "active",
        "suitability": {
          "sme": true
        },
        "title": "Planned, Preventative Maintenance Services (North East)",
        "value": {
          "amount": 4200000.0,
          "amountGross": 5040000.0,
          "currency": "GBP"
        }
      },
      {
        "awardCriteria": {
          "criteria": [
            {
              "name": "Criterion 1",
              "numbers": [
                {
                  "number": 60,
                  "weight": "percentageExact"
                }
              ],
              "type": "quality"
            },
            {
              "name": "Criterion 2",
              "numbers": [
                {
                  "number": 40,
                  "weight": "percentageExact"
                }
              ],
              "type": "price"
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-05-03T23:59:59+01:00",
          "maxExtentDate": "2030-05-03T23:59:59+01:00",
          "startDate": "2026-05-04T00:00:00+01:00"
        },
        "description": "YORKSHIRE \u0026 HUMBER\nThe Planned Preventative Maintenance core services will include, but are not limited to:\n\u2022Installing roof coverings\n\u2022Repairing and maintaining roof coverings\n\u2013 these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market.\n\u2022Treating roofs with spray paint, industrial coating and asphalt\n\u2022Applying roof sealer compounds and cleaning existing roofing materials\n\u2022Installing spouts, duct work, capping and drainage on roofs\n\u2022Gutter repairs, maintenance and cleaning\n\u2022Fascias and Soffit repairs, maintenance, cleaning and replacement\n\u2022Chimney repointing and repairs\n\u2022Pointing/Re-pointing\n\u2022Insulation works\n\u2022Concrete works and repairs\n\u2022Leadwork and flashing\n\u2022Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc.\nNon-mandatory (Supplementary) Services\nBidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission.  Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 1.\n\u2022Condition Surveys\n\u2022Installation of new roofs or full/part replacement of existing roofs and associated works)\nFor New/Replacement Roofs only, bidders will be required to satisfy NEUPC\u2019s minimum requirements by submitting case study evidence.  This evidence will be reviewed by NEUPC but will not be subject to a scored assessment. \nAny Lot 1 PPM successful supplier that satisfies the minimum requirements will be approved by NEUPC to offer clients these services, however it will be at the discretion of the client whether to approach the supplier for these services based on their own assessment of the minimum evidence submitted and any other minimum requirements they may request.\n\u2022Principal Contractor\nA principal roofing contractor will oversee and manage the construction phase of a project, coordinating all roofing work and ensuring CDM regulations and health and safety standards are met. They are responsible for planning, managing, and coordinating the project, and they appoint and oversee subcontractors to complete various parts of the work. There is typically only one principal contractor for a project at any given time.\n\u2022Solar PV Panel Cleaning\n\u2022Roof glazing installation and maintenance\n\u2022Roof cleaning\n\u2022Ice/snow removal\nSolar PV panel installation and maintenance is out of scope.",
        "hasRenewal": true,
        "id": "1b",
        "renewal": {
          "description": "The framework will be awarded for a fixed period of three years with an optional 12 month extension period available subject to demand and performance, making a maximum four year arrangement possible."
        },
        "status": "active",
        "suitability": {
          "sme": true
        },
        "title": "Planned Preventative Maintenance Services (Yorkshire \u0026 Humber)",
        "value": {
          "amount": 4200000.0,
          "amountGross": 5040000.0,
          "currency": "GBP"
        }
      },
      {
        "awardCriteria": {
          "criteria": [
            {
              "name": "Criterion 1",
              "numbers": [
                {
                  "number": 60,
                  "weight": "percentageExact"
                }
              ],
              "type": "quality"
            },
            {
              "name": "Criterion 2",
              "numbers": [
                {
                  "number": 40,
                  "weight": "percentageExact"
                }
              ],
              "type": "price"
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-05-03T23:59:59+01:00",
          "maxExtentDate": "2030-05-03T23:59:59+01:00",
          "startDate": "2026-05-04T00:00:00+01:00"
        },
        "description": "EAST\nThe Planned Preventative Maintenance core services will include, but are not limited to:\n\u2022Installing roof coverings\n\u2022Repairing and maintaining roof coverings\n\u2013 these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market.\n\u2022Treating roofs with spray paint, industrial coating and asphalt\n\u2022Applying roof sealer compounds and cleaning existing roofing materials\n\u2022Installing spouts, duct work, capping and drainage on roofs\n\u2022Gutter repairs, maintenance and cleaning\n\u2022Fascias and Soffit repairs, maintenance, cleaning and replacement\n\u2022Chimney repointing and repairs\n\u2022Pointing/Re-pointing\n\u2022Insulation works\n\u2022Concrete works and repairs\n\u2022Leadwork and flashing\n\u2022Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc.\nNon-mandatory (Supplementary) Services\nBidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission.  Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 1.\n\u2022Condition Surveys\n\u2022Installation of new roofs or full/part replacement of existing roofs and associated works)\nFor New/Replacement Roofs only, bidders will be required to satisfy NEUPC\u2019s minimum requirements by submitting case study evidence.  This evidence will be reviewed by NEUPC but will not be subject to a scored assessment. \nAny Lot 1 PPM successful supplier that satisfies the minimum requirements will be approved by NEUPC to offer clients these services, however it will be at the discretion of the client whether to approach the supplier for these services based on their own assessment of the minimum evidence submitted and any other minimum requirements they may request.\n\u2022Principal Contractor\nA principal roofing contractor will oversee and manage the construction phase of a project, coordinating all roofing work and ensuring CDM regulations and health and safety standards are met. They are responsible for planning, managing, and coordinating the project, and they appoint and oversee subcontractors to complete various parts of the work. There is typically only one principal contractor for a project at any given time.\n\u2022Solar PV Panel Cleaning\n\u2022Roof glazing installation and maintenance\n\u2022Roof cleaning\n\u2022Ice/snow removal\nSolar PV panel installation and maintenance is out of scope.",
        "hasRenewal": true,
        "id": "1c",
        "renewal": {
          "description": "The framework will be awarded for a fixed period of three years with a possible 12 month extension available subject to demand and performance, making a maximum four year arrangement."
        },
        "status": "active",
        "suitability": {
          "sme": true
        },
        "title": "Planned, Preventative Maintenance Services (East)",
        "value": {
          "amount": 4200000.0,
          "amountGross": 5040000.0,
          "currency": "GBP"
        }
      },
      {
        "awardCriteria": {
          "criteria": [
            {
              "name": "Criterion 1",
              "numbers": [
                {
                  "number": 60,
                  "weight": "percentageExact"
                }
              ],
              "type": "quality"
            },
            {
              "name": "Criterion 2",
              "numbers": [
                {
                  "number": 40,
                  "weight": "percentageExact"
                }
              ],
              "type": "price"
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-05-03T23:59:59+01:00",
          "maxExtentDate": "2030-05-03T23:59:59+01:00",
          "startDate": "2026-05-04T00:00:00+01:00"
        },
        "description": "NORTHERN IRELAND\nThe Planned Preventative Maintenance core services will include, but are not limited to:\n\u2022Installing roof coverings\n\u2022Repairing and maintaining roof coverings\n\u2013 these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market.\n\u2022Treating roofs with spray paint, industrial coating and asphalt\n\u2022Applying roof sealer compounds and cleaning existing roofing materials\n\u2022Installing spouts, duct work, capping and drainage on roofs\n\u2022Gutter repairs, maintenance and cleaning\n\u2022Fascias and Soffit repairs, maintenance, cleaning and replacement\n\u2022Chimney repointing and repairs\n\u2022Pointing/Re-pointing\n\u2022Insulation works\n\u2022Concrete works and repairs\n\u2022Leadwork and flashing\n\u2022Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc.\nNon-mandatory (Supplementary) Services\nBidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission.  Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 1.\n\u2022Condition Surveys\n\u2022Installation of new roofs or full/part replacement of existing roofs and associated works)\nFor New/Replacement Roofs only, bidders will be required to satisfy NEUPC\u2019s minimum requirements by submitting case study evidence.  This evidence will be reviewed by NEUPC but will not be subject to a scored assessment. \nAny Lot 1 PPM successful supplier that satisfies the minimum requirements will be approved by NEUPC to offer clients these services, however it will be at the discretion of the client whether to approach the supplier for these services based on their own assessment of the minimum evidence submitted and any other minimum requirements they may request.\n\u2022Principal Contractor\nA principal roofing contractor will oversee and manage the construction phase of a project, coordinating all roofing work and ensuring CDM regulations and health and safety standards are met. They are responsible for planning, managing, and coordinating the project, and they appoint and oversee subcontractors to complete various parts of the work. There is typically only one principal contractor for a project at any given time.\n\u2022Solar PV Panel Cleaning\n\u2022Roof glazing installation and maintenance\n\u2022Roof cleaning\n\u2022Ice/snow removal\nSolar PV panel installation and maintenance is out of scope.",
        "hasRenewal": true,
        "id": "1d",
        "renewal": {
          "description": "The framework will be awarded for a fixed period of three years with a possible 12 month extension available subject to demand and performance, making a maximum four year arrangement."
        },
        "status": "active",
        "suitability": {
          "sme": true
        },
        "title": "Planned, Preventative Maintenance Services (Northern Ireland)",
        "value": {
          "amount": 500000.0,
          "amountGross": 600000.0,
          "currency": "GBP"
        }
      },
      {
        "awardCriteria": {
          "criteria": [
            {
              "name": "Criterion 1",
              "numbers": [
                {
                  "number": 60,
                  "weight": "percentageExact"
                }
              ],
              "type": "quality"
            },
            {
              "name": "Criterion 2",
              "numbers": [
                {
                  "number": 40,
                  "weight": "percentageExact"
                }
              ],
              "type": "price"
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-05-03T23:59:59+01:00",
          "maxExtentDate": "2030-05-03T23:59:59+01:00",
          "startDate": "2026-05-04T00:00:00+01:00"
        },
        "description": "NORTH WEST\nThe Planned Preventative Maintenance core services will include, but are not limited to:\n\u2022Installing roof coverings\n\u2022Repairing and maintaining roof coverings\n\u2013 these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market.\n\u2022Treating roofs with spray paint, industrial coating and asphalt\n\u2022Applying roof sealer compounds and cleaning existing roofing materials\n\u2022Installing spouts, duct work, capping and drainage on roofs\n\u2022Gutter repairs, maintenance and cleaning\n\u2022Fascias and Soffit repairs, maintenance, cleaning and replacement\n\u2022Chimney repointing and repairs\n\u2022Pointing/Re-pointing\n\u2022Insulation works\n\u2022Concrete works and repairs\n\u2022Leadwork and flashing\n\u2022Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc.\nNon-mandatory (Supplementary) Services\nBidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission.  Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 1.\n\u2022Condition Surveys\n\u2022Installation of new roofs or full/part replacement of existing roofs and associated works)\nFor New/Replacement Roofs only, bidders will be required to satisfy NEUPC\u2019s minimum requirements by submitting case study evidence.  This evidence will be reviewed by NEUPC but will not be subject to a scored assessment. \nAny Lot 1 PPM successful supplier that satisfies the minimum requirements will be approved by NEUPC to offer clients these services, however it will be at the discretion of the client whether to approach the supplier for these services based on their own assessment of the minimum evidence submitted and any other minimum requirements they may request.\n\u2022Principal Contractor\nA principal roofing contractor will oversee and manage the construction phase of a project, coordinating all roofing work and ensuring CDM regulations and health and safety standards are met. They are responsible for planning, managing, and coordinating the project, and they appoint and oversee subcontractors to complete various parts of the work. There is typically only one principal contractor for a project at any given time.\n\u2022Solar PV Panel Cleaning\n\u2022Roof glazing installation and maintenance\n\u2022Roof cleaning\n\u2022Ice/snow removal\nSolar PV panel installation and maintenance is out of scope.",
        "hasRenewal": true,
        "id": "1e",
        "renewal": {
          "description": "The framework will be awarded for a fixed period of three years with a possible 12 month extension available subject to demand and performance, making a maximum four year arrangement."
        },
        "status": "active",
        "suitability": {
          "sme": true
        },
        "title": "Planned, Preventative Maintenance Services (North West)",
        "value": {
          "amount": 500000.0,
          "amountGross": 600000.0,
          "currency": "GBP"
        }
      },
      {
        "awardCriteria": {
          "criteria": [
            {
              "name": "Criterion 1",
              "numbers": [
                {
                  "number": 60,
                  "weight": "percentageExact"
                }
              ],
              "type": "quality"
            },
            {
              "name": "Criterion 2",
              "numbers": [
                {
                  "number": 40,
                  "weight": "percentageExact"
                }
              ],
              "type": "price"
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-05-03T23:59:59+01:00",
          "maxExtentDate": "2030-05-03T23:59:59+01:00",
          "startDate": "2026-05-04T00:00:00+01:00"
        },
        "description": "WEST\nThe Planned Preventative Maintenance core services will include, but are not limited to:\n\u2022Installing roof coverings\n\u2022Repairing and maintaining roof coverings\n\u2013 these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market.\n\u2022Treating roofs with spray paint, industrial coating and asphalt\n\u2022Applying roof sealer compounds and cleaning existing roofing materials\n\u2022Installing spouts, duct work, capping and drainage on roofs\n\u2022Gutter repairs, maintenance and cleaning\n\u2022Fascias and Soffit repairs, maintenance, cleaning and replacement\n\u2022Chimney repointing and repairs\n\u2022Pointing/Re-pointing\n\u2022Insulation works\n\u2022Concrete works and repairs\n\u2022Leadwork and flashing\n\u2022Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc.\nNon-mandatory (Supplementary) Services\nBidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission.  Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 1.\n\u2022Condition Surveys\n\u2022Installation of new roofs or full/part replacement of existing roofs and associated works)\nFor New/Replacement Roofs only, bidders will be required to satisfy NEUPC\u2019s minimum requirements by submitting case study evidence.  This evidence will be reviewed by NEUPC but will not be subject to a scored assessment. \nAny Lot 1 PPM successful supplier that satisfies the minimum requirements will be approved by NEUPC to offer clients these services, however it will be at the discretion of the client whether to approach the supplier for these services based on their own assessment of the minimum evidence submitted and any other minimum requirements they may request.\n\u2022Principal Contractor\nA principal roofing contractor will oversee and manage the construction phase of a project, coordinating all roofing work and ensuring CDM regulations and health and safety standards are met. They are responsible for planning, managing, and coordinating the project, and they appoint and oversee subcontractors to complete various parts of the work. There is typically only one principal contractor for a project at any given time.\n\u2022Solar PV Panel Cleaning\n\u2022Roof glazing installation and maintenance\n\u2022Roof cleaning\n\u2022Ice/snow removal\nSolar PV panel installation and maintenance is out of scope.",
        "hasRenewal": true,
        "id": "1f",
        "renewal": {
          "description": "The framework will be awarded for a fixed period of three years with a possible 12 month extension available subject to demand and performance, making a maximum four year arrangement."
        },
        "status": "active",
        "suitability": {
          "sme": true
        },
        "title": "Planned, Preventative Maintenance Services (West)",
        "value": {
          "amount": 4200000.0,
          "amountGross": 5040000.0,
          "currency": "GBP"
        }
      },
      {
        "awardCriteria": {
          "criteria": [
            {
              "name": "Criterion 1",
              "numbers": [
                {
                  "number": 60,
                  "weight": "percentageExact"
                }
              ],
              "type": "quality"
            },
            {
              "name": "Criterion 2",
              "numbers": [
                {
                  "number": 40,
                  "weight": "percentageExact"
                }
              ],
              "type": "price"
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-05-03T23:59:59+01:00",
          "maxExtentDate": "2030-05-03T23:59:59+01:00",
          "startDate": "2026-05-04T00:00:00+01:00"
        },
        "description": "WEST MIDLANDS\nThe Planned Preventative Maintenance core services will include, but are not limited to:\n\u2022Installing roof coverings\n\u2022Repairing and maintaining roof coverings\n\u2013 these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market.\n\u2022Treating roofs with spray paint, industrial coating and asphalt\n\u2022Applying roof sealer compounds and cleaning existing roofing materials\n\u2022Installing spouts, duct work, capping and drainage on roofs\n\u2022Gutter repairs, maintenance and cleaning\n\u2022Fascias and Soffit repairs, maintenance, cleaning and replacement\n\u2022Chimney repointing and repairs\n\u2022Pointing/Re-pointing\n\u2022Insulation works\n\u2022Concrete works and repairs\n\u2022Leadwork and flashing\n\u2022Principal Contractor for any subcontracted services such as scaffolding, MEWPs, etc.\nNon-mandatory (Supplementary) Services\nBidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission.  Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 1.\n\u2022Condition Surveys\n\u2022Installation of new roofs or full/part replacement of existing roofs and associated works)\nFor New/Replacement Roofs only, bidders will be required to satisfy NEUPC\u2019s minimum requirements by submitting case study evidence.  This evidence will be reviewed by NEUPC but will not be subject to a scored assessment. \nAny Lot 1 PPM successful supplier that satisfies the minimum requirements will be approved by NEUPC to offer clients these services, however it will be at the discretion of the client whether to approach the supplier for these services based on their own assessment of the minimum evidence submitted and any other minimum requirements they may request.\n\u2022Principal Contractor\nA principal roofing contractor will oversee and manage the construction phase of a project, coordinating all roofing work and ensuring CDM regulations and health and safety standards are met. They are responsible for planning, managing, and coordinating the project, and they appoint and oversee subcontractors to complete various parts of the work. There is typically only one principal contractor for a project at any given time.\n\u2022Solar PV Panel Cleaning\n\u2022Roof glazing installation and maintenance\n\u2022Roof cleaning\n\u2022Ice/snow removal\nSolar PV panel installation and maintenance is out of scope.",
        "hasRenewal": true,
        "id": "1g",
        "renewal": {
          "description": "The framework will be awarded for a fixed period of three years with a possible 12 month extension available subject to demand and performance, making a maximum four year arrangement."
        },
        "status": "active",
        "suitability": {
          "sme": true
        },
        "title": "Planned, Preventative Maintenance Services (West Midlands)",
        "value": {
          "amount": 4200000.0,
          "amountGross": 5040000.0,
          "currency": "GBP"
        }
      },
      {
        "awardCriteria": {
          "criteria": [
            {
              "name": "Criterion 1",
              "numbers": [
                {
                  "number": 60,
                  "weight": "percentageExact"
                }
              ],
              "type": "quality"
            },
            {
              "name": "Criterion 2",
              "numbers": [
                {
                  "number": 40,
                  "weight": "percentageExact"
                }
              ],
              "type": "price"
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-05-03T23:59:59+01:00",
          "maxExtentDate": "2030-05-03T23:59:59+01:00",
          "startDate": "2026-05-04T00:00:00+01:00"
        },
        "description": "NORTH EAST\nResponsive Repair Services will include reactive/emergency services such as, but not limited to:\n\u2022Repairing roof coverings\n\u2013 these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market.\n\u2022Treating roofs with spray paint, industrial coating and asphalt to make good/safe\n\u2022Applying roof sealer compounds and cleaning existing roofing materials to make good/safe\n\u2022Gutter cleaning or repair to return to full function and/or make good/safe\n\u2022Fascias and Soffit replacement or repair to return to full function and/or make good/safe\n\u2022Chimney repointing and repairs to make good/safe\n\u2022Pointing to make good/safe\n\u2022Concrete repairs to make good/safe\n\u2022Insulation works to make good/safe\n\u2022Leadwork and flashing to make good/safe\n\u2022Principal Contractor for any subcontracted services such  as scaffolding, MEWPs, etc.\nNon-mandatory (Supplementary) Services\nBidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission.  Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 2.\n\u2022Solar PV Panel Cleaning\n\u2022Roof glazing repairs to make good/safe\n\u2022Emergency Roof cleaning to make safe\n\u2022Emergency Ice/snow removal to make safe\nSolar PV panel installation and maintenance is out of scope.",
        "hasRenewal": true,
        "id": "2a",
        "renewal": {
          "description": "The framework will be awarded for a fixed period of three years with a possible 12 month extension available subject to demand and performance, making a maximum four year arrangement."
        },
        "status": "active",
        "suitability": {
          "sme": true
        },
        "title": "Reactive Maintenance Services (North East)",
        "value": {
          "amount": 1940000.0,
          "amountGross": 2328000.0,
          "currency": "GBP"
        }
      },
      {
        "awardCriteria": {
          "criteria": [
            {
              "name": "Criterion 1",
              "numbers": [
                {
                  "number": 60,
                  "weight": "percentageExact"
                }
              ],
              "type": "quality"
            },
            {
              "name": "Criterion 2",
              "numbers": [
                {
                  "number": 40,
                  "weight": "percentageExact"
                }
              ],
              "type": "price"
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-05-03T23:59:59+01:00",
          "maxExtentDate": "2030-05-03T23:59:59+01:00",
          "startDate": "2026-05-04T00:00:00+01:00"
        },
        "description": "YORKSHIRE \u0026 HUMBER\nResponsive Repair Services will include reactive/emergency services such as, but not limited to:\n\u2022Repairing roof coverings\n\u2013 these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market.\n\u2022Treating roofs with spray paint, industrial coating and asphalt to make good/safe\n\u2022Applying roof sealer compounds and cleaning existing roofing materials to make good/safe\n\u2022Gutter cleaning or repair to return to full function and/or make good/safe\n\u2022Fascias and Soffit replacement or repair to return to full function and/or make good/safe\n\u2022Chimney repointing and repairs to make good/safe\n\u2022Pointing to make good/safe\n\u2022Concrete repairs to make good/safe\n\u2022Insulation works to make good/safe\n\u2022Leadwork and flashing to make good/safe\n\u2022Principal Contractor for any subcontracted services such  as scaffolding, MEWPs, etc.\nNon-mandatory (Supplementary) Services\nBidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission.  Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 2.\n\u2022Solar PV Panel Cleaning\n\u2022Roof glazing repairs to make good/safe\n\u2022Emergency Roof cleaning to make safe\n\u2022Emergency Ice/snow removal to make safe\nSolar PV panel installation and maintenance is out of scope.",
        "hasRenewal": true,
        "id": "2b",
        "renewal": {
          "description": "The framework will be awarded for a fixed period of three years with a possible 12 month extension available subject to demand and performance, making a maximum four year arrangement."
        },
        "status": "active",
        "suitability": {
          "sme": true
        },
        "title": "Reactive Maintenance Services (Yorkshire \u0026 Humber)",
        "value": {
          "amount": 1940000.0,
          "amountGross": 2328000.0,
          "currency": "GBP"
        }
      },
      {
        "awardCriteria": {
          "criteria": [
            {
              "name": "Criterion 1",
              "numbers": [
                {
                  "number": 60,
                  "weight": "percentageExact"
                }
              ],
              "type": "quality"
            },
            {
              "name": "Criterion 2",
              "numbers": [
                {
                  "number": 40,
                  "weight": "percentageExact"
                }
              ],
              "type": "price"
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-05-03T23:59:59+01:00",
          "maxExtentDate": "2030-05-03T23:59:59+01:00",
          "startDate": "2026-05-04T00:00:00+01:00"
        },
        "description": "EAST\nResponsive Repair Services will include reactive/emergency services such as, but not limited to:\n\u2022Repairing roof coverings\n\u2013 these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market.\n\u2022Treating roofs with spray paint, industrial coating and asphalt to make good/safe\n\u2022Applying roof sealer compounds and cleaning existing roofing materials to make good/safe\n\u2022Gutter cleaning or repair to return to full function and/or make good/safe\n\u2022Fascias and Soffit replacement or repair to return to full function and/or make good/safe\n\u2022Chimney repointing and repairs to make good/safe\n\u2022Pointing to make good/safe\n\u2022Concrete repairs to make good/safe\n\u2022Insulation works to make good/safe\n\u2022Leadwork and flashing to make good/safe\n\u2022Principal Contractor for any subcontracted services such  as scaffolding, MEWPs, etc.\nNon-mandatory (Supplementary) Services\nBidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission.  Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 2.\n\u2022Solar PV Panel Cleaning\n\u2022Roof glazing repairs to make good/safe\n\u2022Emergency Roof cleaning to make safe\n\u2022Emergency Ice/snow removal to make safe\nSolar PV panel installation and maintenance is out of scope.",
        "hasRenewal": true,
        "id": "2c",
        "renewal": {
          "description": "The framework will be awarded for a fixed period of three years with a possible 12 month extension available subject to demand and performance, making a maximum four year arrangement."
        },
        "status": "active",
        "suitability": {
          "sme": true
        },
        "title": "Reactive Maintenance Services (East)",
        "value": {
          "amount": 1940000.0,
          "amountGross": 2328000.0,
          "currency": "GBP"
        }
      },
      {
        "awardCriteria": {
          "criteria": [
            {
              "name": "Criterion 1",
              "numbers": [
                {
                  "number": 60,
                  "weight": "percentageExact"
                }
              ],
              "type": "quality"
            },
            {
              "name": "Criterion 2",
              "numbers": [
                {
                  "number": 40,
                  "weight": "percentageExact"
                }
              ],
              "type": "price"
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-05-03T23:59:59+01:00",
          "maxExtentDate": "2030-05-03T23:59:59+01:00",
          "startDate": "2026-05-04T00:00:00+01:00"
        },
        "description": "NORTHERN IRELAND\nResponsive Repair Services will include reactive/emergency services such as, but not limited to:\n\u2022Repairing roof coverings\n\u2013 these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market.\n\u2022Treating roofs with spray paint, industrial coating and asphalt to make good/safe\n\u2022Applying roof sealer compounds and cleaning existing roofing materials to make good/safe\n\u2022Gutter cleaning or repair to return to full function and/or make good/safe\n\u2022Fascias and Soffit replacement or repair to return to full function and/or make good/safe\n\u2022Chimney repointing and repairs to make good/safe\n\u2022Pointing to make good/safe\n\u2022Concrete repairs to make good/safe\n\u2022Insulation works to make good/safe\n\u2022Leadwork and flashing to make good/safe\n\u2022Principal Contractor for any subcontracted services such  as scaffolding, MEWPs, etc.\nNon-mandatory (Supplementary) Services\nBidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission.  Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 2.\n\u2022Solar PV Panel Cleaning\n\u2022Roof glazing repairs to make good/safe\n\u2022Emergency Roof cleaning to make safe\n\u2022Emergency Ice/snow removal to make safe\nSolar PV panel installation and maintenance is out of scope.",
        "hasRenewal": true,
        "id": "2d",
        "renewal": {
          "description": "The framework will be awarded for a fixed period of three years with a possible 12 month extension available subject to demand and performance, making a maximum four year arrangement."
        },
        "status": "active",
        "suitability": {
          "sme": true
        },
        "title": "Reactive Maintenance Services (Northern Ireland)",
        "value": {
          "amount": 150000.0,
          "amountGross": 180000.0,
          "currency": "GBP"
        }
      },
      {
        "awardCriteria": {
          "criteria": [
            {
              "name": "Criterion 1",
              "numbers": [
                {
                  "number": 60,
                  "weight": "percentageExact"
                }
              ],
              "type": "quality"
            },
            {
              "name": "Criterion 2",
              "numbers": [
                {
                  "number": 40,
                  "weight": "percentageExact"
                }
              ],
              "type": "price"
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-05-03T23:59:59+01:00",
          "maxExtentDate": "2030-05-03T23:59:59+01:00",
          "startDate": "2026-05-04T00:00:00+01:00"
        },
        "description": "Responsive Repair Services will include reactive/emergency services such as, but not limited to:\n\u2022Repairing roof coverings\n\u2013 these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market.\n\u2022Treating roofs with spray paint, industrial coating and asphalt to make good/safe\n\u2022Applying roof sealer compounds and cleaning existing roofing materials to make good/safe\n\u2022Gutter cleaning or repair to return to full function and/or make good/safe\n\u2022Fascias and Soffit replacement or repair to return to full function and/or make good/safe\n\u2022Chimney repointing and repairs to make good/safe\n\u2022Pointing to make good/safe\n\u2022Concrete repairs to make good/safe\n\u2022Insulation works to make good/safe\n\u2022Leadwork and flashing to make good/safe\n\u2022Principal Contractor for any subcontracted services such  as scaffolding, MEWPs, etc.\nNon-mandatory (Supplementary) Services\nBidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission.  Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 2.\n\u2022Solar PV Panel Cleaning\n\u2022Roof glazing repairs to make good/safe\n\u2022Emergency Roof cleaning to make safe\n\u2022Emergency Ice/snow removal to make safe\nSolar PV panel installation and maintenance is out of scope.",
        "hasRenewal": true,
        "id": "2e",
        "renewal": {
          "description": "The framework will be awarded for a fixed period of three years with a possible 12 month extension available subject to demand and performance, making a maximum four year arrangement."
        },
        "status": "active",
        "suitability": {
          "sme": true
        },
        "title": "Reactive Maintenance Services (North West)",
        "value": {
          "amount": 150000.0,
          "amountGross": 180000.0,
          "currency": "GBP"
        }
      },
      {
        "awardCriteria": {
          "criteria": [
            {
              "name": "Criterion 1",
              "numbers": [
                {
                  "number": 60,
                  "weight": "percentageExact"
                }
              ],
              "type": "quality"
            },
            {
              "name": "Criterion 2",
              "numbers": [
                {
                  "number": 40,
                  "weight": "percentageExact"
                }
              ],
              "type": "price"
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-05-03T23:59:59+01:00",
          "maxExtentDate": "2030-05-03T23:59:59+01:00",
          "startDate": "2026-05-04T00:00:00+01:00"
        },
        "description": "WEST\nResponsive Repair Services will include reactive/emergency services such as, but not limited to:\n\u2022Repairing roof coverings\n\u2013 these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market.\n\u2022Treating roofs with spray paint, industrial coating and asphalt to make good/safe\n\u2022Applying roof sealer compounds and cleaning existing roofing materials to make good/safe\n\u2022Gutter cleaning or repair to return to full function and/or make good/safe\n\u2022Fascias and Soffit replacement or repair to return to full function and/or make good/safe\n\u2022Chimney repointing and repairs to make good/safe\n\u2022Pointing to make good/safe\n\u2022Concrete repairs to make good/safe\n\u2022Insulation works to make good/safe\n\u2022Leadwork and flashing to make good/safe\n\u2022Principal Contractor for any subcontracted services such  as scaffolding, MEWPs, etc.\nNon-mandatory (Supplementary) Services\nBidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission.  Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 2.\n\u2022Solar PV Panel Cleaning\n\u2022Roof glazing repairs to make good/safe\n\u2022Emergency Roof cleaning to make safe\n\u2022Emergency Ice/snow removal to make safe\nSolar PV panel installation and maintenance is out of scope.",
        "hasRenewal": true,
        "id": "2f",
        "renewal": {
          "description": "The framework will be awarded for a fixed period of three years with a possible 12 month extension available subject to demand and performance, making a maximum four year arrangement."
        },
        "status": "active",
        "suitability": {
          "sme": true
        },
        "title": "Reactive Maintenance Services (West)",
        "value": {
          "amount": 1940000.0,
          "amountGross": 2328000.0,
          "currency": "GBP"
        }
      },
      {
        "awardCriteria": {
          "criteria": [
            {
              "name": "Criterion 1",
              "numbers": [
                {
                  "number": 60,
                  "weight": "percentageExact"
                }
              ],
              "type": "quality"
            },
            {
              "name": "Criterion 2",
              "numbers": [
                {
                  "number": 40,
                  "weight": "percentageExact"
                }
              ],
              "type": "price"
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-05-03T23:59:59+01:00",
          "maxExtentDate": "2030-05-03T23:59:59+01:00",
          "startDate": "2026-05-04T00:00:00+01:00"
        },
        "description": "WEST MIDLANDS\nResponsive Repair Services will include reactive/emergency services such as, but not limited to:\n\u2022Repairing roof coverings\n\u2013 these can consist of materials such as slate and clay tiles, felt and mastic asphalt, thermoset membrane, thermoplastic, fibreglass, bitumen, metallic and synthetic sheet and any other (new/sustainable) certified materials available in the market.\n\u2022Treating roofs with spray paint, industrial coating and asphalt to make good/safe\n\u2022Applying roof sealer compounds and cleaning existing roofing materials to make good/safe\n\u2022Gutter cleaning or repair to return to full function and/or make good/safe\n\u2022Fascias and Soffit replacement or repair to return to full function and/or make good/safe\n\u2022Chimney repointing and repairs to make good/safe\n\u2022Pointing to make good/safe\n\u2022Concrete repairs to make good/safe\n\u2022Insulation works to make good/safe\n\u2022Leadwork and flashing to make good/safe\n\u2022Principal Contractor for any subcontracted services such  as scaffolding, MEWPs, etc.\nNon-mandatory (Supplementary) Services\nBidders will be allowed to offer some or all of the following non-mandatory services to clients by declaring in their submission they are willing, able and resourced to do so within the region(s) they are bidding for without omission.  Failure to offer these non-mandatory services will not prejudice their ability to be successful for Lot 2.\n\u2022Solar PV Panel Cleaning\n\u2022Roof glazing repairs to make good/safe\n\u2022Emergency Roof cleaning to make safe\n\u2022Emergency Ice/snow removal to make safe\nSolar PV panel installation and maintenance is out of scope.",
        "hasRenewal": true,
        "id": "2g",
        "renewal": {
          "description": "The framework will be awarded for a fixed period of three years with a possible 12 month extension available subject to demand and performance, making a maximum four year arrangement."
        },
        "status": "active",
        "suitability": {
          "sme": true
        },
        "title": "Reactive Maintenance Services (West Midlands)",
        "value": {
          "amount": 1940000.0,
          "amountGross": 2328000.0,
          "currency": "GBP"
        }
      }
    ],
    "mainProcurementCategory": "works",
    "participationFees": [
      {
        "description": "The Framework Levy will be set at 1% of all the framework spend.",
        "id": "ocds-h6vhtk-061394",
        "relativeValue": {
          "monetaryValue": "award",
          "proportion": 0.01
        },
        "type": [
          "win"
        ]
      }
    ],
    "procurementMethod": "open",
    "procurementMethodDetails": "Open procedure",
    "status": "active",
    "submissionMethodDetails": "http://www.delta-esourcing.com",
    "submissionTerms": {
      "electronicSubmissionPolicy": "allowed",
      "languages": [
        "en"
      ]
    },
    "techniques": {
      "frameworkAgreement": {
        "buyerCategories": "NEUPC - North Eastern Universities Purchasing Consortium\nNWUPC - North Western Universities Purchasing Consortium\nSUPC - Southern Universities Procurement Consortium",
        "buyerLocationRestrictions": [
          {
            "gazetteer": {
              "identifiers": [
                "UK"
              ],
              "scheme": "GB-ITL"
            }
          }
        ],
        "description": "Framework call offs will be via either direct award, mini competition or direct award via business case. The selection stage and invitation to tender will include full details of the evaluation criteria which will determine the most advantageous tenders based on weighted quality and price elements.  The Invitation to tender will include full details of the evaluation structure and process.",
        "method": "withAndWithoutReopeningCompetition",
        "type": "open"
      },
      "hasFrameworkAgreement": true
    },
    "tenderPeriod": {
      "endDate": "2026-03-02T23:59:00+00:00"
    },
    "title": "Roofing Services - including Planned Preventative Maintenance, Roof installations and replacements and Reactive Maintenance Works",
    "value": {
      "amount": 32000000.0,
      "amountGross": 38400000.0,
      "currency": "GBP"
    }
  }
}