Buyer Name: Cairngorms National Park Authority
Buyer Address: 14 The Square, Grantown-on-spey, UKM62, PH26 3HG, United Kingdom
Contact Name: Mikko Olavi Saari
Contact Email: mikkosaari@cairngorms.co.uk
Contact Telephone: +44 1479873535
Buyer Name: Cairngorms National Park Authority
Buyer Address: 14 The Square, Grantown-on-spey, UKM62, PH26 3HG, United Kingdom
Contact Name: Mikko Olavi Saari
Contact Email: mikkosaari@cairngorms.co.uk
Contact Telephone: +44 1479873535
The Cairngorms National Park Authority (the “Park Authority”) as client is inviting bids from design consultants to act as Principal Designer under CDM 2015 for Active Communities, currently covering Aviemore North and Boat of Garten, funded by National Lottery Heritage Fund as part of Cairngorms 2030 and by Transport Scotland via the Active Travel Infrastructure Fund. Cairngorms 2030 is a broad, multi-themed programme arising as part of the Cairngorms National Park Partnership Plan. The project scope is to complete RIBA Stage 3: Developed design and Stage 4: Technical design to the joint requirements of the Park Authority and The Highland Council. The bidder should note the ambition to construct by 2027/28. Stage 3 Developed design and Stage 4 Technical design will be delivered consecutively following a logical critical path, with several activities presented as “live” documents carried between stages. Within the programme, the consultant should allow ample time for client, stakeholder, and funder feedback to be compiled, reviewed, and amendments made as necessary. Some documents will benefit from a collaborative approach between the client and principal designer to ensure external funding requirements are met. The principal designer should propose a suitable means of sharing collaborative documents, such as a cloud-based sharing platform.
No linked documents found for this notice.
{
"buyer": {
"id": "GB-FTS-77310",
"name": "Cairngorms National Park Authority"
},
"date": "2025-03-27T15:22:22Z",
"id": "011602-2025",
"initiationType": "tender",
"language": "en",
"links": [
{
"href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000793685",
"rel": "canonical"
}
],
"ocid": "ocds-h6vhtk-04eea9",
"parties": [
{
"address": {
"countryName": "United Kingdom",
"locality": "Grantown-on-spey",
"postalCode": "PH26 3HG",
"region": "UKM62",
"streetAddress": "14 The Square"
},
"contactPoint": {
"email": "mikkosaari@cairngorms.co.uk",
"faxNumber": "+44 1479873527",
"name": "Mikko Olavi Saari",
"telephone": "+44 1479873535"
},
"details": {
"buyerProfile": "https://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA00429",
"url": "http://www.cairngorms.co.uk"
},
"id": "GB-FTS-77310",
"identifier": {
"legalName": "Cairngorms National Park Authority"
},
"name": "Cairngorms National Park Authority",
"roles": [
"buyer"
]
}
],
"tag": [
"tenderUpdate"
],
"tender": {
"amendments": [
{
"description": "Easter / spring School holidays",
"id": "2",
"unstructuredChanges": [
{
"newValue": {
"date": "2025-04-30T12:00:00+01:00"
},
"oldValue": {
"date": "2025-04-22T12:00:00+01:00"
},
"where": {
"label": "Time limit",
"section": "IV.2.2"
}
},
{
"newValue": {
"date": "2025-04-30T12:00:00+01:00"
},
"oldValue": {
"date": "2025-04-22T12:00:00+01:00"
},
"where": {
"label": "Conditions for opening of tenders",
"section": "IV.2.7"
}
}
]
}
],
"classification": {
"description": "Infrastructure works consultancy services",
"id": "71311300",
"scheme": "CPV"
},
"description": "The Cairngorms National Park Authority (the \u201cPark Authority\u201d) as client is inviting bids from design consultants to act as Principal Designer under CDM 2015 for Active Communities, currently covering Aviemore North and Boat of Garten, funded by National Lottery Heritage Fund as part of Cairngorms 2030 and by Transport Scotland via the Active Travel Infrastructure Fund.\nCairngorms 2030 is a broad, multi-themed programme arising as part of the Cairngorms National Park Partnership Plan.\nThe project scope is to complete RIBA Stage 3: Developed design and Stage 4: Technical design to the joint requirements of the Park Authority and The Highland Council. The bidder should note the ambition to construct by 2027/28.\nStage 3 Developed design and Stage 4 Technical design will be delivered consecutively following a logical critical path, with several activities presented as \u201clive\u201d documents carried between stages. Within the programme, the consultant should allow ample time for client, stakeholder, and funder feedback to be compiled, reviewed, and amendments made as necessary. Some documents will benefit from a collaborative approach between the client and principal designer to ensure external funding requirements are met. The principal designer should propose a suitable means of sharing collaborative documents, such as a cloud-based sharing platform.",
"id": "ocds-h6vhtk-04eea9",
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"mainProcurementCategory": "services",
"title": "Active Communities - Aviemore North and Boat of Garten (Cairngorms 2030)"
}
}