Buyer Name: THE UNIVERSITY OF BIRMINGHAM
Buyer Address: Edgbaston, Birmingham, UKG31, B15 2TT, United Kingdom
Contact Name: Lee Lynch
Contact Email: procurement@bham.ac.uk
Buyer Name: THE UNIVERSITY OF BIRMINGHAM
Buyer Address: Edgbaston, Birmingham, UKG31, B15 2TT, United Kingdom
Contact Name: Lee Lynch
Contact Email: procurement@bham.ac.uk
The University of Birmingham invites tenders for the Replacement of Waste Heat Recovery Boiler Panel with Integrated Duct Burner and Gas Turbine Interface. The current Waste Heat Boiler panel was built in 1990/91 and controls the operation of a water tube boiler that utilizes the exhaust from a Solar Mercury 50 gas turbine. The exhaust heat enables the university to generate 3500Kg/hr of saturated steam @ 17barG although the boiler is rated at 25barG. There is a supplementary burner within the boiler that can fire from 0.2barG natural gas to 3.5barG which allows the flexibility of the boiler range between 3500Kg to 18000Kg an hour, therefore providing a base load during the winter months. Please refer to Appendix A and associated appendices for the full specification of requirments available via www.intendhost.com/universityofbirmingham The works are to be completed by September 2025. Site visits are essential. These will be arranged via the correspondence feature on the InTend e-procurement portal.
No linked documents found for this notice.
External Link: https://www.find-tender.service.gov.uk/Notice/012804-2025
Link Description: Tender notice on Find a Tender
Lot LOT-0001 Status: active
Lot LOT-0001 Value: AED 260,000
Lot LOT-0001 Value (Gross): AED 312,000
Lot LOT-0001 Contract Start: 2025-06-01T00:00:00+00:00
Lot LOT-0001 Contract End: 2025-09-30T23:59:59+00:00
Lot LOT-0001 Award Criterion (price): Simple description
Document Description: Not published
Document Description: Tender notice on Find a Tender
{
"buyer": {
"id": "GB-COH-RC000645",
"name": "THE UNIVERSITY OF BIRMINGHAM"
},
"date": "2025-04-03T13:21:38+01:00",
"id": "012804-2025",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-h6vhtk-04fcab",
"parties": [
{
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "Birmingham",
"postalCode": "B15 2TT",
"region": "UKG31",
"streetAddress": "Edgbaston"
},
"contactPoint": {
"email": "procurement@bham.ac.uk",
"name": "Lee Lynch"
},
"details": {
"classifications": [
{
"description": "Public undertaking",
"id": "publicUndertaking",
"scheme": "UK_CA_TYPE"
}
],
"url": "http://www.bham.ac.uk"
},
"id": "GB-COH-RC000645",
"identifier": {
"id": "RC000645",
"scheme": "GB-COH"
},
"name": "THE UNIVERSITY OF BIRMINGHAM",
"roles": [
"buyer"
]
}
],
"planning": {
"noEngagementNoticeRationale": "Preliminary market engagement considered not required for this tender opportunity."
},
"tag": [
"tender"
],
"tender": {
"aboveThreshold": true,
"awardPeriod": {
"endDate": "2025-05-09T23:59:59+00:00"
},
"description": "The University of Birmingham invites tenders for the Replacement of Waste Heat Recovery Boiler Panel with Integrated Duct Burner and Gas Turbine Interface. \nThe current Waste Heat Boiler panel was built in 1990/91 and controls the operation of a water tube boiler that utilizes the exhaust from a Solar Mercury 50 gas turbine. The exhaust heat enables the university to generate 3500Kg/hr of saturated steam @ 17barG although the boiler is rated at 25barG. There is a supplementary burner within the boiler that can fire from 0.2barG natural gas to 3.5barG which allows the flexibility of the boiler range between 3500Kg to 18000Kg an hour, therefore providing a base load during the winter months.\nPlease refer to Appendix A and associated appendices for the full specification of requirments available via www.intendhost.com/universityofbirmingham \nThe works are to be completed by September 2025.\nSite visits are essential. These will be arranged via the correspondence feature on the InTend e-procurement portal.",
"documents": [
{
"description": "Not published",
"documentType": "conflictOfInterest",
"id": "conflictOfInterest"
},
{
"datePublished": "2025-04-03T13:21:38+01:00",
"description": "Tender notice on Find a Tender",
"documentType": "tenderNotice",
"format": "text/html",
"id": "012804-2025",
"noticeType": "UK4",
"url": "https://www.find-tender.service.gov.uk/Notice/012804-2025"
}
],
"enquiryPeriod": {
"endDate": "2025-04-23T17:00:00+00:00"
},
"id": "SC13723/25",
"items": [
{
"additionalClassifications": [
{
"description": "Installation services of steam generators, turbines, compressors and burners",
"id": "51130000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKG31"
}
],
"id": "LOT-0001",
"relatedLot": "LOT-0001"
}
],
"legalBasis": {
"id": "2023/54",
"scheme": "UKPGA",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
},
"lots": [
{
"awardCriteria": {
"criteria": [
{
"description": "Tender submissions will be evaluated against the award criteria published within the tender documents and uploaded to the e-procurement portal:\nProcurement Specific Questionnaire: 10%\nCompliance to Specification: 15%\nTechnical Skills and Ability: 10%\nQuality: 15%\nPrice: 50%",
"name": "Simple description",
"type": "price"
}
],
"weightingDescription": "Tender submissions will be evaluated against the award criteria published within the tender documents and uploaded to the e-procurement portal:\nProcurement Specific Questionnaire: 10%\nCompliance to Specification: 15%\nTechnical Skills and Ability: 10%\nQuality: 15%\nPrice: 50%"
},
"contractPeriod": {
"endDate": "2025-09-30T23:59:59+00:00",
"startDate": "2025-06-01T00:00:00+00:00"
},
"id": "LOT-0001",
"status": "active",
"value": {
"amount": 260000,
"amountGross": 312000,
"currency": "AED"
}
}
],
"mainProcurementCategory": "services",
"procurementMethod": "open",
"procurementMethodDetails": "Open procedure",
"status": "active",
"submissionMethodDetails": "https://in-tendhost.co.uk/universityofbirmingham/aspx/Home",
"submissionTerms": {
"electronicSubmissionPolicy": "allowed",
"languages": [
"en"
]
},
"tenderPeriod": {
"endDate": "2025-04-28T12:00:00Z"
},
"title": "Replacement of the Waste Heat Recovery Boiler Panel with Integrated Duct Burner and Gas Turbine Interface",
"value": {
"amount": 260000,
"amountGross": 312000,
"currency": "GBP"
}
}
}