Buyer Name: LONDONENERGY LTD
Buyer Address: Ecopark, Advent Way, London, UKI54, N18 3AG, United Kingdom
Contact Email: Procurement@londonenergyltd.com
Buyer Name: LONDONENERGY LTD
Buyer Address: Ecopark, Advent Way, London, UKI54, N18 3AG, United Kingdom
Contact Email: Procurement@londonenergyltd.com
The Contractor shall provide the following service to the Client for the duration of the service period: The contract term shall be for three (3) years with the option to extend for a further two (2) years. [1 x Volvo L90H] Loading Bucket Tip of lip bucket 4.5m capacity with trash guard RUBBER BLADE 48" - Medium 911M 1" Lock Washers - Medium Blade (qty: 13) PLOUGH BOLT 1 x 4 (qty:13) PLOUGH NUT 1 " (qty: 13) Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility. Roll Over Protective Structures (ROPS) & Falling Object Protective Structure (FOPS) sound insulated safety care cab with environmental controls. All Cabs to be fitted with Air Conditioning. Air Pre-Cleaner to deal with dusty environment. Reversing Camera Amber warning beacon, audible reversing warning and standard reversing lights, red seat belts. Guarantee that plant supplied will be able to run on solid TY cushion tyres and without detriment to the plant or operator. Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points. Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes. Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste. Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines Fire Suppression System Plant Tracking System Load weighing systems to be installed on loading bucket to weigh material being loaded into hoppers or vehicles/containers. Hydraulic isolator switch to ensure complete shut down of plant in an emergency. Additional brush attachment option included required. 1 x Volvo L70 H Loading Bucket Tip of lip bucket 4.5m capacity with trash guard RUBBER BLADE 48" - Medium 911M 1" Lock Washers - Medium Blade (qty: 13) PLOUGH BOLT 1 x 4 (qty:13) PLOUGH NUT 1 " (qty: 13) Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility. Roll Over Protective Structures (ROPS) & Falling Object Protective Structure (FOPS) sound insulated safety care cab with environmental controls. All Cabs to be fitted with Air Conditioning Air Pre-Cleaner to deal with dusty environment. Reversing Camera Amber warning beacon, audible reversing warning and standard reversing lights, red seat belts. Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes. Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste. Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines Guarantee that plant supplied will be able to run on solid TY cushion tyres and without detriment to the plant or operator. Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points. Fire Suppression System Plant Tracking System Load weighing systems to be installed on loading bucket to weigh material being loaded into hoppers or vehicles/containers. Hydraulic isolator switch to ensure complete shut down of plant in an emergency. 1 x JCB 3CX/JCB 4CX/JCB 5CX Amber warning beacon, audible reversing warning and standard reversing lights. Front mounted bucket - 1 piece 50mm wear edge Front solid tyres Fire Suppression System Plant Tracking System Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility. Isolator or emergency stop switch to ensure complete shut down of plant in an emergency. Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes. All Cabs to be fitted with Air Conditioning Air Pre-Cleaner to deal with dusty environment. Reversing Camera Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste. All Cabs to be fitted with Air Conditioning. Rear Selector Grab Attachment required for sorting recyclable materials such as metal, wood, mattresses. The Collection Point/Affected Property/Treatment Site The Affected Property operates 7 x days a week. Operating hours are: Mon 07:00am-00:00 Tues-Sat 07:00am-23:30 Sunday 08:00am-17:00 Closed only Christmas Day & New Years Day Frequency of Collection/Service/Testing The Contractor shall provide a fully inclusive repairs and maintenance package within the base price to include collection charges and costs. The Contractor shall guarantee that in the event of plant and equipment failure not caused by the Operator or their agents or in excess of 24 hours, the Contractor shall undertake to supply an equivalent plant at their own cost. In the event that the Contractor is not able to supply a replacement within the agreed timeframe the Company may seek to replace with another hired plant. The contractor shall reimburse the Company the full cost of replacement and shall include any transportation costs incurred as a result of this. All plant and equipment shall hold a minimum of 12-month warranty. The Contractor is to ensure that in the event of any breakdowns (within the company's operating hours) a qualified engineer shall be sent out to site to rectify within 2 hours from notification, to investigate and or remedy the fault and or supply replacement plant. All parts failing due to general and expected wear and tear are to be replaced the Contractor at their cost. The Contractor will produce a list of parts and components which will fall within this category and are exempt within 1 month of the contract commencing. All servicing is to be carried out in accordance with manufacturer's guidance and to the manufacturer's minimum recommended specifications. Copies of all service records and annual inspections will be supplied to the company within 7 working days of all works being completed and retained by the Contractor for a period of 3 years from the expiry of agreement. Upon completion of any and all servicing, maintenance and or repair works the Contractors engineer must supply a signed handover document which states what work has been undertaken and that the plant is now safe, fit for use, fully serviceable and meets all Health & Safety requirements e.g. LOLER or PUWER certification has been issued. Costs for all part, labour and travel through wear and tear are to be included. Solid tyres are to be supplied to begin with as a one of and thereafter will be replaced/repaired by the Company.
External Link: https://www.find-tender.service.gov.uk/Notice/014557-2025
Link Description: Tender notice on Find a Tender
Lot 1 Status: active
Lot 1 Value (Gross): GBP 700,000
Lot 1 Contract Start: 2025-06-03T00:00:00+01:00
Lot 1 Contract End: 2028-06-03T23:59:59+01:00
Lot 1 SME Suitable: Yes
Lot 1 Award Criterion (quality): Technical or Quality (60%)
Lot 1 Award Criterion (cost): Cost (40%)
Document Description: Not published
Document Description: Access Code : 55S7M66RV7
Document Description: Tender notice on Find a Tender
{
"buyer": {
"id": "GB-COH-02732548",
"name": "LONDONENERGY LTD"
},
"date": "2025-04-11T12:15:02+01:00",
"id": "014557-2025",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-h6vhtk-04fc73",
"parties": [
{
"additionalIdentifiers": [
{
"id": "PXMX-9411-QDZJ",
"scheme": "GB-PPON"
}
],
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "London",
"postalCode": "N18 3AG",
"region": "UKI54",
"streetAddress": "Ecopark, Advent Way"
},
"contactPoint": {
"email": "Procurement@londonenergyltd.com"
},
"details": {
"classifications": [
{
"description": "Private utility",
"id": "privateUtility",
"scheme": "UK_CA_TYPE"
}
]
},
"id": "GB-COH-02732548",
"identifier": {
"id": "02732548",
"scheme": "GB-COH"
},
"name": "LONDONENERGY LTD",
"roles": [
"buyer"
]
}
],
"tag": [
"tender"
],
"tender": {
"aboveThreshold": true,
"awardPeriod": {
"endDate": "2025-05-21T23:59:59+01:00"
},
"description": "The Contractor shall provide the following service to the Client for the duration of the service period:\nThe contract term shall be for three (3) years with the option to extend for a further two (2) years.\n[1 x Volvo L90H]\nLoading Bucket\nTip of lip bucket 4.5m capacity with trash guard\nRUBBER BLADE 48\" - Medium 911M\n1\" Lock Washers - Medium Blade (qty: 13)\nPLOUGH BOLT 1 x 4 (qty:13)\nPLOUGH NUT 1 \" (qty: 13)\nWindscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility.\nRoll Over Protective Structures (ROPS) \u0026 Falling Object Protective Structure (FOPS) sound insulated safety care cab with environmental controls.\nAll Cabs to be fitted with Air Conditioning.\nAir Pre-Cleaner to deal with dusty environment.\nReversing Camera\nAmber warning beacon, audible reversing warning and standard reversing lights, red seat belts.\nGuarantee that plant supplied will be able to run on solid TY cushion tyres and without detriment to the plant or operator.\nAuto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points.\nAutomated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes.\nAdditional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste.\nReduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines\nFire Suppression System\nPlant Tracking System\nLoad weighing systems to be installed on loading bucket to weigh material being loaded into hoppers or vehicles/containers.\nHydraulic isolator switch to ensure complete shut down of plant in an emergency.\nAdditional brush attachment option included required.\n1 x Volvo L70 H\nLoading Bucket\nTip of lip bucket 4.5m capacity with trash guard\nRUBBER BLADE 48\" - Medium 911M\n1\" Lock Washers - Medium Blade (qty: 13)\nPLOUGH BOLT 1 x 4 (qty:13)\nPLOUGH NUT 1 \" (qty: 13)\nWindscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility.\nRoll Over Protective Structures (ROPS) \u0026 Falling Object Protective Structure (FOPS) sound insulated safety care cab with environmental controls.\nAll Cabs to be fitted with Air Conditioning\nAir Pre-Cleaner to deal with dusty environment.\nReversing Camera\nAmber warning beacon, audible reversing warning and standard reversing lights, red seat belts.\nAutomated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes.\nAdditional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste.\nReduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines\nGuarantee that plant supplied will be able to run on solid TY cushion tyres and without detriment to the plant or operator.\nAuto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points.\nFire Suppression System\nPlant Tracking System\nLoad weighing systems to be installed on loading bucket to weigh material being loaded into hoppers or vehicles/containers.\nHydraulic isolator switch to ensure complete shut down of plant in an emergency.\n1 x JCB 3CX/JCB 4CX/JCB 5CX\nAmber warning beacon, audible reversing warning and standard reversing lights.\nFront mounted bucket - 1 piece 50mm wear edge\nFront solid tyres\nFire Suppression System\nPlant Tracking System\nWindscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility.\nIsolator or emergency stop switch to ensure complete shut down of plant in an emergency.\nReduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines\nAutomated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes.\nAll Cabs to be fitted with Air Conditioning\nAir Pre-Cleaner to deal with dusty environment.\nReversing Camera\nAdditional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste.\nAll Cabs to be fitted with Air Conditioning.\nRear Selector Grab Attachment required for sorting recyclable materials such as metal, wood, mattresses.\nThe Collection Point/Affected Property/Treatment Site\nThe Affected Property operates 7 x days a week. Operating hours are:\nMon 07:00am-00:00\nTues-Sat 07:00am-23:30\nSunday 08:00am-17:00\nClosed only Christmas Day \u0026 New Years Day\nFrequency of Collection/Service/Testing\nThe Contractor shall provide a fully inclusive repairs and maintenance package within the base price to include collection charges and costs.\nThe Contractor shall guarantee that in the event of plant and equipment failure not caused by the Operator or their agents or in excess of 24 hours, the Contractor shall undertake to supply an equivalent plant at their own cost.\nIn the event that the Contractor is not able to supply a replacement within the agreed timeframe the Company may seek to replace with another hired plant.\nThe contractor shall reimburse the Company the full cost of replacement and shall include any transportation costs incurred as a result of this.\nAll plant and equipment shall hold a minimum of 12-month warranty.\nThe Contractor is to ensure that in the event of any breakdowns (within the company\u0027s operating hours) a qualified engineer shall be sent out to site to rectify within 2 hours from notification, to investigate and or remedy the fault and or supply replacement plant.\nAll parts failing due to general and expected wear and tear are to be replaced the Contractor at their cost. The Contractor will produce a list of parts and components which will fall within this category and are exempt within 1 month of the contract commencing.\nAll servicing is to be carried out in accordance with manufacturer\u0027s guidance and to the manufacturer\u0027s minimum recommended specifications.\nCopies of all service records and annual inspections will be supplied to the company within 7 working days of all works being completed and retained by the Contractor for a period of 3 years from the expiry of agreement.\nUpon completion of any and all servicing, maintenance and or repair works the Contractors engineer must supply a signed handover document which states what work has been undertaken and that the plant is now safe, fit for use, fully serviceable and meets all Health \u0026 Safety requirements e.g. LOLER or PUWER certification has been issued.\nCosts for all part, labour and travel through wear and tear are to be included.\nSolid tyres are to be supplied to begin with as a one of and thereafter will be replaced/repaired by the Company.",
"documents": [
{
"description": "Not published",
"documentType": "conflictOfInterest",
"id": "conflictOfInterest"
},
{
"description": "Access Code : 55S7M66RV7",
"documentType": "biddingDocuments",
"format": "application/pdf",
"id": "A-622",
"url": "https://www.find-tender.service.gov.uk/Notice/Attachment/A-622"
},
{
"datePublished": "2025-04-11T12:15:02+01:00",
"description": "Tender notice on Find a Tender",
"documentType": "tenderNotice",
"format": "text/html",
"id": "014557-2025",
"noticeType": "UK4",
"url": "https://www.find-tender.service.gov.uk/Notice/014557-2025"
}
],
"hasRecurrence": true,
"id": "ocds-h6vhtk-04fc73",
"items": [
{
"additionalClassifications": [
{
"description": "Industrial machinery",
"id": "42000000",
"scheme": "CPV"
},
{
"description": "Front-end shovel loaders",
"id": "43250000",
"scheme": "CPV"
},
{
"description": "Hire of construction and civil engineering machinery and equipment with operator",
"id": "45500000",
"scheme": "CPV"
},
{
"description": "Repair, maintenance and associated services of vehicles and related equipment",
"id": "50100000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKI5"
}
],
"id": "1",
"relatedLot": "1"
}
],
"legalBasis": {
"id": "2023/54",
"scheme": "UKPGA",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
},
"lots": [
{
"awardCriteria": {
"criteria": [
{
"name": "Technical or Quality",
"numbers": [
{
"number": 60,
"weight": "percentageExact"
}
],
"type": "quality"
},
{
"name": "Cost",
"numbers": [
{
"number": 40,
"weight": "percentageExact"
}
],
"type": "cost"
}
]
},
"contractPeriod": {
"endDate": "2028-06-03T23:59:59+01:00",
"maxExtentDate": "2030-06-03T23:59:59+01:00",
"startDate": "2025-06-03T00:00:00+01:00"
},
"hasRenewal": true,
"id": "1",
"renewal": {
"description": "3 year contract with option to extend for a further 1 year with a further additional one year thereafter."
},
"status": "active",
"suitability": {
"sme": true
},
"value": {
"amountGross": 700000,
"currency": "GBP"
}
}
],
"mainProcurementCategory": "services",
"procurementMethod": "open",
"procurementMethodDetails": "Open procedure",
"recurrence": {
"dates": [
{
"startDate": "2030-04-02T23:59:59+01:00"
}
]
},
"status": "active",
"submissionMethodDetails": "https://www.delta-esourcing.com/respond/55S7M66RV7",
"submissionTerms": {
"electronicSubmissionPolicy": "allowed",
"languages": [
"en"
]
},
"techniques": {
"frameworkAgreement": {
"description": "The Contractor shall provide a fully inclusive repairs and maintenance package within the base price to include collection charges and costs. \nThis is an open procedure process and is a one-stage procurement process which covers exclusion grounds, selection criteria and award criteria. An Open procedure means that any organisation can respond to the advertised Contract Notice, request/download the procurement documents and submit a tender.",
"isOpenFrameworkScheme": true,
"method": "withReopeningCompetition",
"openFrameworkSchemeEndDate": "2030-06-03T23:59:59+01:00",
"type": "closed"
},
"hasFrameworkAgreement": true
},
"tenderPeriod": {
"endDate": "2025-05-06T17:00:00+01:00"
},
"title": "Mobile Plant Equipment Hire \u0026 Maintenance for Hornsey Street Transfer Station",
"value": {
"amountGross": 700000,
"currency": "GBP"
}
}
}