Buyer Name: NATIONAL GRID UK LIMITED
Buyer Address: 1-3 Strand, London, UKI32, WC2N 5EH, United Kingdom
Contact Name: Donald Offor
Contact Email: Donald.Offor@nationalgrid.com
Buyer Name: NATIONAL GRID UK LIMITED
Buyer Address: 1-3 Strand, London, UKI32, WC2N 5EH, United Kingdom
Contact Name: Donald Offor
Contact Email: Donald.Offor@nationalgrid.com
This QUDM is for substation construction, mechanical and electrical installation and major civil works. To effectively and efficiently deliver the capital works required to meet our Electricity License obligations, manage the risk on our electricity transmission network and to connect new customers,
No linked documents found for this notice.
External Link: https://forms.office.com/Pages/ResponsePage.aspx?id=U2qK-fMlEkKQHMd4f800lR6N7XkEjipHol2q4gB3asNUOFpWWFY4RUtRTTROMzQ5Nk1QVjhSQVBGTy4u
Link Description: Registration form for National Grid eSourcing platform Please complete details to begin registration process
External Link: https://www.find-tender.service.gov.uk/Notice/015074-2026
Link Description: Dynamic market intention notice on Find a Tender
Lot Title: EPC Substation Construction
Lot Description: Scope for Lot 1: EPC Substation Construction Suppliers in lot 1 shall compete for stand-alone contracts and/or frameworks and shall be responsible for delivering capabilities from the following illustrative list, specific to working within a live high-voltage (up to 400kV) transmission network substation environment: · Detailed electrical and civil design · Construction Design Management (CDM) · Programme management · Project management · Site management, including acting as Principal Contractor under the CDM Regulations · Procurement and supply chain management · Subcontractor management · Civil engineering · Protection and control systems installation, configuration and commissioning · Mechanical and electrical installation, testing and commissioning An illustrative list of work types included within this lot is as follows (this list is subject to change due to changing or emerging requirements throughout the QUDM period) · New Build AIS/GIS · AIS/GIS Substation Extension · Major AIS/GIS Substation Asset Replacement Operators that are successful in securing a position on lot 1 of the QUDM may be required to procure products that are to be selected from a list of suppliers that has been pre-approved by National Grid, to accept free-issue equipment and services supplied from contracts that National Grid has placed, or to accept the novation of such a contract after it has been placed by National Grid, for example: · Power transformers · Protection and Control · Gas Insulated Switchgear (GIS) · Air Insulated Switchgear (AIS) · Consumables This lot is designed for larger, more complex works requiring a traditional full EPC turnkey approach to delivery of the scope, with typical project estimates being >£20million.
Lot 1 Status: active
Lot Title: Mechanical & Electrical Installations
Lot Description: Scope for Lot 2: Mechanical & Electrical Installation Suppliers in lot 2 shall compete for stand-alone contracts and shall be responsible for delivering capabilities from the following illustrative list, specific to working within a live high-voltage (132kV~400kV) transmission network substation environment: · Detailed engineering and civil design, including primary and protection and control design · Construction Design Management (CDM) · Programme management · Project management · Site management, including acting as Principal Contractor under the CDM Regulations and temporary works management · Procurement and supply chain management · Subcontractor management · Civil engineering · Protection and control systems installation, configuration and commissioning An illustrative list of work types included within this lot is as follows (this list is subject to change due to changing or emerging requirements throughout the QUDM period) · Substation Upgrades / Smaller Extensions · AIS/GIS Substation Extensions · AIS/GIS Substation Asset Replacement Operators that are successful in securing a position on lot 2 of the QUDM may be required to procure products that are to be selected from a list of suppliers that has been pre-approved by National Grid , to accept free-issue equipment and services supplied from contracts that National Grid has placed, or to accept the novation of such a contract after it has been placed by National Grid, for example: · Power transformers · Protection and Control · Gas Insulated Switchgear (GIS) · Air Insulated Switchgear (AIS) · Consumables This Lot is designed for relatively smaller and less complex works than Lot 1 whereby a competent installer or medium sized construction supplier would have the ability to deliver the scope of work, and typical project estimates would be less than
Lot 2 Status: active
Lot Title: Major Civils (>£5m)
Lot Description: Scope for Lot 3: Major Civil Suppliers in lot 3 shall compete for stand-alone contracts and/or frameworks and shall be responsible for delivering capabilities from the following illustrative list for Substation major civil works with typical project estimated greater than >£5million. Scope shall include but is not limited to, the following illustrative types of works: · Project & Programme Management: · Ensure sufficient and competent resources are deployed on the project to deliver the project in accordance with all National Grid standards and specifications. · Liaison with and management of the interface with any affected landowner, statutory body or undertaker during the delivery of the works (e.g., Local Highways Authority, Network Rail, Environment Agency, Distribution Network Operators). · Consultation & Engagement: · Support the Client in the development of consultation materials as required · Attend and present at consultation events and support the preparation of consultation responses · Support the Client at any technical stakeholder meetings · Input into Consultation Report, liaise with Consents Integrator and engage with consultees as required · Coordinate with Lands Team for survey access · Assist with S172 evidence compilation and other requirements. · Surveys: · Planning, management, delivery and reporting of all surveys required to support the project at all stages of its lifecycle, including: · Site walkover surveys to verify desktop work · Borehole surveys · Perform soil surveys · Intrusive surveys (e.g., foundation inspections). · Existing asset surveys. · Earthing surveys. · Utility surveys · Traffic surveys including vehicle volume and speed surveys. · Design: · Development of outline design, associated drawings and technical reporting required for inclusion within the planning and/or consent application and the construction works information · Production of design, which is in accordance with the Client's requirements, eliminates hazards as far as reasonably practicable for the whole life of the assets, facilitates a safe and efficient construction phase and gives due regard to Client's environmental and sustainability requirements. · Support the Client at any technical stakeholder meetings · Enact the role of Principal Designer in accordance with the CDM regulations 2015 for the development and/or delivery phase and formerly appoint the Principal Designer Representative as required · Review the System Design Specification for completeness and identify any gaps · Review any design works prior to engagement to understand any limitations and restrictions to be carried forward into the subsequent design stage, · Discharge relevant conditions associated with any approved planning permission and/or consent to ensure these are factored into the detailed design · Proactively engage and share design information with other design disciplines involved in the project(s) to ensure that all requirements are considered such that a robust, holistic design can be achieved. · Effectively manage design change ensuring that appropriate communication channels are maintained and document/drawing version control well established. · Responsible with others at the point of known design interfaces (i.e., HV Substation, HV OHL, HV Cables, etc.) and/or with other parties (i.e., Bulk Purchase Equipment (static wound equipment), Generators, DNO, etc.) to ensure that their project design is the most cost-effective solution which does not compromise any other party's programme and objectives in compliance with the duties and responsibilities identified by current CDM Regulations. · Design management and coordination to reduce interface risk. · Building Permanent Structures: The design and construction of new permanent buildings including but not limited to: · Switch Halls for Gas Insulated Switchgear and other equipment contained therein. · Ancillary Plant Room Buildings. · Office & Amenities Blocks. · Storage and Workshop Units · Building Services: Building services required for any new build or refurbishment work (e.g., heating / cooling, ventilation, plumbing and sanitation). · Cable Jointing: · Provision of jointing resources for cable system installation using client-issued materials. · Jointing resources and equipment for non-client-issued jointing tasks. · Temporary works design for jointing techniques. · Cable Pulling: Delivery of all required cable pulling installations including supply (as required) access, cable trenches, duct installation, jointing, testing, backfilling and cable installation elements. · Cable Removal: Removal of existing buried HV cable equipment and any associated above ground equipment such as terminations, oil tanks or kiosks including their foundations · Enabling Works: Pre-construction activities required before commencing the construction of main works including highway and service diversions, ground preparation and remediation, flood mitigation works, demolition of structures, soil stripping and removal, bridge construction, obtaining (including submission and payments of fees) of relevant permits and licences and environmental mitigation works. · Foundations & Structures: Design and supply of civil works for overhead line, underground cables, substation or other required works and structures including ground preparation; excavation and disposal of or stock piling for re-use of arisings; creating safe working platforms for piling rigs; installation of any piling and construction of pile caps; supply and installation of all form work, reinforcement, and concrete. · Flood Defence Design & Build: The design and build of flood defences to reduce the risk of flooding to new and existing infrastructure including hydraulic modelling, flood risk assessment, detailed design, drainage, flood defence walls, floodgates, pumping stations. · Haul Roads and Access Roads: · Design and build of permanent drainage, roadworks and surfacing to satisfy highway specifications. · Traffic management. · Temporary construction haul roads and drainage. · Landscaping: · Delivery of all landscaping requirements including stockpiling and management of construction spoil/arisings; Supply and spreading of appropriate materials where insufficient area is generated from the construction activities; bulk muck shift and creation of screen mounding; tree planting and maintenance and Pond or other habitat creation. · Maintenance for agreed period of time within the planning permission and/or consent specification or as agreed with the relevant stakeholder and/or in line with Biodiversity Net Gain obligations. · Site Establishment: Establishment of construction welfare compounds for the delivery of the whole or parts of the project including supply and installation of site welfare facilities, fencing and site security, temporary connections for water, drainage, and electricity, and removal of site establishment upon project completion with reinstatement of disturbed ground. · Site Management · Enact the role of Principal Contractor in line with the requirements of the CDM regulations. · Deliver the works in accordance with all National Grid Management of Works procedures. · Proactively manage, in line with industry best practise, all aspects of the works in terms of safety, quality, security and environmental compliance. · Liaise with all affected Landowners/Grantors affected by the works. · Liaise with Client site staff including operational and project delivery teams. · Ensure that all site records are maintained, and that site document control is properly managed. · Site Security: · Provision of all requirements to maintain a safe and secure site in line with National Grid policies and procedures. · Construction and installation of permanent security fencing and associated works · Temporary Works: Design, management and provision of all temporary works required for the delivery of the scope
Lot 3 Status: active
Document Description: Not published
Document Description: Registration form for National Grid eSourcing platform Please complete details to begin registration process
Document Description: Dynamic market intention notice on Find a Tender
{
"buyer": {
"id": "GB-COH-04508773",
"name": "NATIONAL GRID UK LIMITED"
},
"date": "2026-02-19T09:55:16Z",
"id": "015074-2026",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-h6vhtk-0657bc",
"parties": [
{
"additionalIdentifiers": [
{
"id": "PGTR-4481-CJPQ",
"scheme": "GB-PPON"
}
],
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "London",
"postalCode": "WC2N 5EH",
"region": "UKI32",
"streetAddress": "1-3 Strand"
},
"contactPoint": {
"email": "Donald.Offor@nationalgrid.com",
"name": "Donald Offor"
},
"details": {
"classifications": [
{
"description": "Private utility",
"id": "privateUtility",
"scheme": "UK_CA_TYPE"
}
]
},
"id": "GB-COH-04508773",
"identifier": {
"id": "04508773",
"scheme": "GB-COH"
},
"name": "NATIONAL GRID UK LIMITED",
"roles": [
"buyer"
]
}
],
"tag": [
"tender"
],
"tender": {
"communication": {
"futureNoticeRecipients": "Members only"
},
"description": "This QUDM is for substation construction, mechanical and electrical installation and major civil works.\nTo effectively and efficiently deliver the capital works required to meet our Electricity License obligations, manage the risk on our electricity transmission network and to connect new customers,",
"documents": [
{
"description": "Not published",
"documentType": "conflictOfInterest",
"id": "conflictOfInterest"
},
{
"description": "Registration form for National Grid eSourcing platform\nPlease complete details to begin registration process",
"documentType": "biddingDocuments",
"id": "L-1",
"url": "https://forms.office.com/Pages/ResponsePage.aspx?id=U2qK-fMlEkKQHMd4f800lR6N7XkEjipHol2q4gB3asNUOFpWWFY4RUtRTTROMzQ5Nk1QVjhSQVBGTy4u"
},
{
"datePublished": "2026-02-19T09:55:16Z",
"description": "Dynamic market intention notice on Find a Tender",
"documentType": "tenderNotice",
"format": "text/html",
"id": "015074-2026",
"noticeType": "UK13",
"url": "https://www.find-tender.service.gov.uk/Notice/015074-2026"
}
],
"id": "ocds-h6vhtk-0657bc",
"items": [
{
"additionalClassifications": [
{
"description": "Substation construction work",
"id": "45232220",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKC"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKD"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKE"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKF"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKG"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKH"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKI"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKJ"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKK"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL"
}
],
"id": "1",
"relatedLot": "1"
},
{
"additionalClassifications": [
{
"description": "Substation construction work",
"id": "45232220",
"scheme": "CPV"
},
{
"description": "Electrical installation work of transformers",
"id": "45317200",
"scheme": "CPV"
},
{
"description": "Electrical installation work of electrical distribution apparatus",
"id": "45317300",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKC"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKD"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKE"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKF"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKG"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKH"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKI"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKJ"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKK"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL"
}
],
"id": "2",
"relatedLot": "2"
},
{
"additionalClassifications": [
{
"description": "Substation construction work",
"id": "45232220",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKC"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKD"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKE"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKF"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKG"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKH"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKI"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKJ"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKK"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL"
}
],
"id": "3",
"relatedLot": "3"
}
],
"legalBasis": {
"id": "2023/54",
"scheme": "UKPGA",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
},
"lots": [
{
"description": "Scope for Lot 1: EPC Substation Construction\nSuppliers in lot 1 shall compete for stand-alone contracts and/or frameworks and shall be responsible for delivering capabilities from the following illustrative list, specific to working within a live high-voltage (up to 400kV) transmission network substation environment:\n\u00b7 Detailed electrical and civil design\n\u00b7 Construction Design Management (CDM)\n\u00b7 Programme management\n\u00b7 Project management\n\u00b7 Site management, including acting as Principal Contractor under the CDM Regulations\n\u00b7 Procurement and supply chain management\n\u00b7 Subcontractor management\n\u00b7 Civil engineering\n\u00b7 Protection and control systems installation, configuration and commissioning\n\u00b7 Mechanical and electrical installation, testing and commissioning\nAn illustrative list of work types included within this lot is as follows (this list is subject to change due to changing or emerging requirements throughout the QUDM period)\n\u00b7 New Build AIS/GIS\n\u00b7 AIS/GIS Substation Extension\n\u00b7 Major AIS/GIS Substation Asset Replacement Operators that are successful in securing a position on lot 1 of the QUDM may be required to procure products that are to be selected from a list of suppliers that has been pre-approved by National Grid, to accept free-issue equipment and services supplied from contracts that National Grid has placed, or to accept the novation of such a contract after it has been placed by National Grid, for example:\n\u00b7 Power transformers\n\u00b7 Protection and Control\n\u00b7 Gas Insulated Switchgear (GIS)\n\u00b7 Air Insulated Switchgear (AIS)\n\u00b7 Consumables This lot is designed for larger, more complex works requiring a traditional full EPC turnkey approach to delivery of the scope, with typical project estimates being \u003e\u00a320million.",
"id": "1",
"status": "active",
"title": "EPC Substation Construction"
},
{
"description": "Scope for Lot 2: Mechanical \u0026 Electrical Installation\nSuppliers in lot 2 shall compete for stand-alone contracts and shall be responsible for delivering capabilities from the following illustrative list, specific to working within a live high-voltage (132kV~400kV) transmission network substation environment:\n\u00b7 Detailed engineering and civil design, including primary and protection and control design\n\u00b7 Construction Design Management (CDM)\n\u00b7 Programme management\n\u00b7 Project management\n\u00b7 Site management, including acting as Principal Contractor under the CDM Regulations and temporary works management\n\u00b7 Procurement and supply chain management\n\u00b7 Subcontractor management\n\u00b7 Civil engineering\n\u00b7 Protection and control systems installation, configuration and commissioning\nAn illustrative list of work types included within this lot is as follows (this list is subject to change due to changing or emerging requirements throughout the QUDM period)\n\u00b7 Substation Upgrades / Smaller Extensions\n\u00b7 AIS/GIS Substation Extensions\n\u00b7 AIS/GIS Substation Asset Replacement\nOperators that are successful in securing a position on lot 2 of the QUDM may be required to procure products that are to be selected from a list of suppliers that has been pre-approved by National Grid , to accept free-issue equipment and services supplied from contracts that National Grid has placed, or to accept the novation of such a contract after it has been placed by National Grid, for example:\n\u00b7 Power transformers\n\u00b7 Protection and Control\n\u00b7 Gas Insulated Switchgear (GIS)\n\u00b7 Air Insulated Switchgear (AIS)\n\u00b7 Consumables\nThis Lot is designed for relatively smaller and less complex works than Lot 1 whereby a competent installer or medium sized construction supplier would have the ability to deliver the scope of work, and typical project estimates would be less than",
"id": "2",
"status": "active",
"title": "Mechanical \u0026 Electrical Installations"
},
{
"description": "Scope for Lot 3: Major Civil\nSuppliers in lot 3 shall compete for stand-alone contracts and/or frameworks and shall be responsible for delivering capabilities from the following illustrative list for Substation major civil works with typical project estimated greater than \u003e\u00a35million. Scope shall include but is not limited to, the following illustrative types of works:\n\u00b7 Project \u0026 Programme Management:\n\u00b7 Ensure sufficient and competent resources are deployed on the project to deliver the project in accordance with all National Grid standards and specifications.\n\u00b7 Liaison with and management of the interface with any affected landowner, statutory body or undertaker during the delivery of the works (e.g., Local Highways Authority, Network Rail, Environment Agency, Distribution Network Operators).\n\u00b7 Consultation \u0026 Engagement:\n\u00b7 Support the Client in the development of consultation materials as required\n\u00b7 Attend and present at consultation events and support the preparation of consultation responses\n\u00b7 Support the Client at any technical stakeholder meetings\n\u00b7 Input into Consultation Report, liaise with Consents Integrator and engage with consultees as required\n\u00b7 Coordinate with Lands Team for survey access\n\u00b7 Assist with S172 evidence compilation and other requirements.\n\u00b7 Surveys:\n\u00b7 Planning, management, delivery and reporting of all surveys required to support the project at all stages of its lifecycle, including:\n\u00b7 Site walkover surveys to verify desktop work\n\u00b7 Borehole surveys\n\u00b7 Perform soil surveys\n\u00b7 Intrusive surveys (e.g., foundation inspections).\n\u00b7 Existing asset surveys.\n\u00b7 Earthing surveys.\n\u00b7 Utility surveys\n\u00b7 Traffic surveys including vehicle volume and speed surveys.\n\u00b7 Design:\n\u00b7 Development of outline design, associated drawings and technical reporting required for inclusion within the planning and/or consent application and the construction works information\n\u00b7 Production of design, which is in accordance with the Client\u0027s requirements, eliminates hazards as far as reasonably practicable for the whole life of the assets, facilitates a safe and efficient construction phase and gives due regard to Client\u0027s environmental and sustainability requirements.\n\u00b7 Support the Client at any technical stakeholder meetings\n\u00b7 Enact the role of Principal Designer in accordance with the CDM regulations 2015 for the development and/or delivery phase and formerly appoint the Principal Designer Representative as required\n\u00b7 Review the System Design Specification for completeness and identify any gaps\n\u00b7 Review any design works prior to engagement to understand any limitations and restrictions to be carried forward into the subsequent design stage,\n\u00b7 Discharge relevant conditions associated with any approved planning permission and/or consent to ensure these are factored into the detailed design\n\u00b7 Proactively engage and share design information with other design disciplines involved in the project(s) to ensure that all requirements are considered such that a robust, holistic design can be achieved.\n\u00b7 Effectively manage design change ensuring that appropriate communication channels are maintained and document/drawing version control well established.\n\u00b7 Responsible with others at the point of known design interfaces (i.e., HV Substation, HV OHL, HV Cables, etc.) and/or with other parties (i.e., Bulk Purchase Equipment (static wound equipment), Generators, DNO, etc.) to ensure that their project design is the most cost-effective solution which does not compromise any other party\u0027s programme and objectives in compliance with the duties and responsibilities identified by current CDM Regulations.\n\u00b7 Design management and coordination to reduce interface risk.\n\u00b7 Building Permanent Structures: The design and construction of new permanent buildings including but not limited to:\n\u00b7 Switch Halls for Gas Insulated Switchgear and other equipment contained therein.\n\u00b7 Ancillary Plant Room Buildings.\n\u00b7 Office \u0026 Amenities Blocks.\n\u00b7 Storage and Workshop Units\n\u00b7 Building Services: Building services required for any new build or refurbishment work (e.g., heating / cooling, ventilation, plumbing and sanitation).\n\u00b7 Cable Jointing:\n\u00b7 Provision of jointing resources for cable system installation using client-issued materials.\n\u00b7 Jointing resources and equipment for non-client-issued jointing tasks.\n\u00b7 Temporary works design for jointing techniques.\n\u00b7 Cable Pulling: Delivery of all required cable pulling installations including supply (as required) access, cable trenches, duct installation, jointing, testing, backfilling and cable installation elements.\n\u00b7 Cable Removal: Removal of existing buried HV cable equipment and any associated above ground equipment such as terminations, oil tanks or kiosks including their foundations\n\u00b7 Enabling Works: Pre-construction activities required before commencing the construction of main works including highway and service diversions, ground preparation and remediation, flood mitigation works, demolition of structures, soil stripping and removal, bridge construction, obtaining (including submission and payments of fees) of relevant permits and licences and environmental mitigation works.\n\u00b7 Foundations \u0026 Structures: Design and supply of civil works for overhead line, underground cables, substation or other required works and structures including ground preparation; excavation and disposal of or stock piling for re-use of arisings; creating safe working platforms for piling rigs; installation of any piling and construction of pile caps; supply and installation of all form work, reinforcement, and concrete.\n\u00b7 Flood Defence Design \u0026 Build: The design and build of flood defences to reduce the risk of flooding to new and existing infrastructure including hydraulic modelling, flood risk assessment, detailed design, drainage, flood defence walls, floodgates, pumping stations.\n\u00b7 Haul Roads and Access Roads:\n\u00b7 Design and build of permanent drainage, roadworks and surfacing to satisfy highway specifications.\n\u00b7 Traffic management.\n\u00b7 Temporary construction haul roads and drainage.\n\u00b7 Landscaping:\n\u00b7 Delivery of all landscaping requirements including stockpiling and management of construction spoil/arisings; Supply and spreading of appropriate materials where insufficient area is generated from the construction activities; bulk muck shift and creation of screen mounding; tree planting and maintenance and Pond or other habitat creation.\n\u00b7 Maintenance for agreed period of time within the planning permission and/or consent specification or as agreed with the relevant stakeholder and/or in line with Biodiversity Net Gain obligations.\n\u00b7 Site Establishment: Establishment of construction welfare compounds for the delivery of the whole or parts of the project including supply and installation of site welfare facilities, fencing and site security, temporary connections for water, drainage, and electricity, and removal of site establishment upon project completion with reinstatement of disturbed ground.\n\u00b7 Site Management\n\u00b7 Enact the role of Principal Contractor in line with the requirements of the CDM regulations.\n\u00b7 Deliver the works in accordance with all National Grid Management of Works procedures.\n\u00b7 Proactively manage, in line with industry best practise, all aspects of the works in terms of safety, quality, security and environmental compliance.\n\u00b7 Liaise with all affected Landowners/Grantors affected by the works.\n\u00b7 Liaise with Client site staff including operational and project delivery teams.\n\u00b7 Ensure that all site records are maintained, and that site document control is properly managed.\n\u00b7 Site Security:\n\u00b7 Provision of all requirements to maintain a safe and secure site in line with National Grid policies and procedures.\n\u00b7 Construction and installation of permanent security fencing and associated works\n\u00b7 Temporary Works: Design, management and provision of all temporary works required for the delivery of the scope",
"id": "3",
"status": "active",
"title": "Major Civils (\u003e\u00a35m)"
}
],
"mainProcurementCategory": "works",
"participationFees": [
{
"description": "None",
"id": "ocds-h6vhtk-0657bc",
"type": [
"submission"
]
}
],
"procurementMethod": "open",
"procurementMethodDetails": "Dynamic market",
"specialRegime": [
"utilities"
],
"status": "active",
"submissionMethodDetails": "https://forms.office.com/Pages/ResponsePage.aspx?id=U2qK-fMlEkKQHMd4f800lR6N7XkEjipHol2q4gB3asNUOFpWWFY4RUtRTTROMzQ5Nk1QVjhSQVBGTy4u\nLink for registration form for National Grid eSourcing system\nPlease complete the form and select correct Dynamic Market to receive further registration details.",
"submissionTerms": {
"electronicSubmissionPolicy": "allowed"
},
"techniques": {
"dynamicPurchasingSystem": {
"status": "pending"
},
"frameworkAgreement": {
"buyerCategories": "Available for use by any member of the National Grid group (parent company National Grid plc) and references to National Grid shall be interpreted accordingly as covering the whole group (except where the context requires otherwise).\nSpecifically this will include:\nNational Grid Electricity Transmission\nNational Grid Electricity Distribution\nNational Grid Ventures\nother entities within the National Grid UK corporate structure as may require access",
"buyerClassificationRestrictions": [
{
"id": "utilities"
}
],
"period": {
"durationInDays": "1e9999",
"startDate": "2026-02-19T23:59:59Z"
},
"type": "open"
},
"hasDynamicPurchasingSystem": true
},
"tenderPeriod": {
"durationInDays": "1e9999"
},
"title": "National Grid Substation Construction"
}
}