Buyer Name: THE PIRBRIGHT INSTITUTE
Buyer Address: Pirbright Laboratory Ash Road, Woking, UKJ25, GU24 0NF, United Kingdom
Contact Email: Procurement.department@pirbright.ac.uk
Buyer Name: THE PIRBRIGHT INSTITUTE
Buyer Address: Pirbright Laboratory Ash Road, Woking, UKJ25, GU24 0NF, United Kingdom
Contact Email: Procurement.department@pirbright.ac.uk
The CHP LTHW Heat Recovery Project is to enable heat generated from the CHP as low temperature hot water to offset steam production used for heating and hot water within the Plowright building. Utilising the available LTHW provides a significant energy saving and delivers maximum efficiency from the CHP that operates onsite. Existing controls and BMS operate on the Schneider Electric platform. For continuity and standardisation, it is required that the controls and BMS package to operate and monitor the heat recovery system is via the existing Schneider system.
No linked documents found for this notice.
Lot 1 Status: complete
{
"awards": [
{
"additionalProcurementCategories": [
"services"
],
"id": "1",
"items": [
{
"additionalClassifications": [
{
"description": "Electrical installation work",
"id": "45310000",
"scheme": "CPV"
},
{
"description": "Mechanical engineering installation works",
"id": "45351000",
"scheme": "CPV"
},
{
"description": "Engineering design services for mechanical and electrical installations for buildings",
"id": "71321000",
"scheme": "CPV"
},
{
"description": "Integrated engineering services",
"id": "71340000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKJ25"
}
],
"id": "1",
"relatedLot": "1"
}
],
"mainProcurementCategory": "works",
"relatedLots": [
"1"
],
"status": "active",
"suppliers": [
{
"id": "GB-COH-01407228",
"name": "SCHNEIDER ELECTRIC LIMITED"
}
]
}
],
"buyer": {
"id": "GB-COH-00559784",
"name": "THE PIRBRIGHT INSTITUTE"
},
"contracts": [
{
"aboveThreshold": false,
"awardID": "1",
"dateSigned": "2025-03-27T00:00:00Z",
"documents": [
{
"datePublished": "2025-06-17T10:43:26+01:00",
"description": "Contract details notice on Find a Tender",
"documentType": "contractNotice",
"format": "text/html",
"id": "032836-2025",
"noticeType": "UK7",
"url": "https://www.find-tender.service.gov.uk/Notice/032836-2025"
}
],
"id": "1",
"period": {
"endDate": "2025-10-31T23:59:59Z",
"startDate": "2025-04-07T00:00:00+01:00"
},
"status": "active",
"value": {
"amount": 41511,
"amountGross": 498132,
"currency": "GBP"
}
}
],
"date": "2025-06-17T10:43:26+01:00",
"id": "032836-2025",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-h6vhtk-054dfb",
"parties": [
{
"additionalIdentifiers": [
{
"id": "PDZM-9963-XHWG",
"scheme": "GB-PPON"
}
],
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "Woking",
"postalCode": "GU24 0NF",
"region": "UKJ25",
"streetAddress": "Pirbright Laboratory Ash Road"
},
"contactPoint": {
"email": "Procurement.department@pirbright.ac.uk"
},
"details": {
"classifications": [
{
"description": "Public authority - sub-central government",
"id": "publicAuthoritySubCentralGovernment",
"scheme": "UK_CA_TYPE"
}
]
},
"id": "GB-COH-00559784",
"identifier": {
"id": "00559784",
"scheme": "GB-COH"
},
"name": "THE PIRBRIGHT INSTITUTE",
"roles": [
"buyer"
]
},
{
"additionalIdentifiers": [
{
"id": "PJHP-9678-TZZL",
"scheme": "GB-PPON"
}
],
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "Telford",
"postalCode": "TF3 3BL",
"region": "UKG21",
"streetAddress": "Stafford Park 5"
},
"contactPoint": {
"email": "scott.gregory@se.com"
},
"details": {
"scale": "large",
"url": "http://www.se.com",
"vcse": false
},
"id": "GB-COH-01407228",
"identifier": {
"id": "01407228",
"scheme": "GB-COH"
},
"name": "SCHNEIDER ELECTRIC LIMITED",
"roles": [
"supplier"
]
}
],
"tag": [
"award",
"contract"
],
"tender": {
"description": "The CHP LTHW Heat Recovery Project is to enable heat generated from the CHP as low temperature hot water to offset steam production used for heating and hot water within the Plowright building. Utilising the available LTHW provides a significant energy saving and delivers maximum efficiency from the CHP that operates onsite. \nExisting controls and BMS operate on the Schneider Electric platform. For continuity and standardisation, it is required that the controls and BMS package to operate and monitor the heat recovery system is via the existing Schneider system.",
"id": "ocds-h6vhtk-054dfb",
"legalBasis": {
"id": "2023/54",
"scheme": "UKPGA",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
},
"lots": [
{
"id": "1",
"status": "complete"
}
],
"procurementMethod": "direct",
"procurementMethodDetails": "Below threshold - without competition",
"status": "complete",
"title": "Controls and BMS package to enable the operation and monitoring of the CHP LTHW heat recovery system"
}
}