Buyer Name: THE PIRBRIGHT INSTITUTE
Buyer Address: Pirbright Laboratory Ash Road, Woking, UKJ25, GU24 0NF, United Kingdom
Contact Email: Procurement.department@pirbright.ac.uk
Buyer Name: THE PIRBRIGHT INSTITUTE
Buyer Address: Pirbright Laboratory Ash Road, Woking, UKJ25, GU24 0NF, United Kingdom
Contact Email: Procurement.department@pirbright.ac.uk
The Brooksby Building is a newly constructed and completed large animal High. Containment (Level 4) facility, designed and engineered to achieve ACDP3 and SAPO4 bio-containment levels. The building is arranged with 6 large animal holding suites, with each animal holding suite comprising 4 individual rooms. As the "Occupation "Day 2" Projects" continues to progress, to provide Pirbright complete assurance of suitability for SAPO 4 / ACDP operation. At present this comprises of four areas: 1. Ventilation. A working group comprising Pirbright Ventilation, Process safety, BMS and Biosafety SMEs has been formed to undertake this performance verification. It is proposed that the 3rd party commissioning specialist will support this process in conjunction with the Brooksby ventilation installation & commissioning engineers. Accordingly, an allowance of 1 day per week to the end of December 2025 has been made, for a total of 20 days allowance. 2. Incinerator. The following estimates have been made to support the incinerator programme of works. This will bring the incinerator to a fully operational and commissioned condition, sufficient for SAPO 4 ACDP 3 studies to commence. - Commissioning, Validation & Verification, and supervision: 2 days /week. Incinerator total: 50 days 3. Safety Instrumented Function (SIF) installation & commissioning. - 5 days supervision and technical support. 4. Occupation and Work Package 2 works support. (Supporting on-site management & coordination of work activities & interdependencies, basement issues support, technical support, meetings and administration). - 7 days supervision and technical support. Total: 82 days (June 2025 - end December 2025) This period requires specialist technical support from those possessing detailed knowledge and experience of the Brooksby facility.
No linked documents found for this notice.
Lot 1 Status: complete
{
"awards": [
{
"id": "1",
"items": [
{
"additionalClassifications": [
{
"description": "Installation services of waste incinerators",
"id": "51135110",
"scheme": "CPV"
},
{
"description": "Ventilation consultancy services",
"id": "71321400",
"scheme": "CPV"
},
{
"description": "Construction consultancy services",
"id": "71530000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKJ25"
}
],
"id": "1",
"relatedLot": "1"
}
],
"mainProcurementCategory": "services",
"relatedLots": [
"1"
],
"status": "active",
"suppliers": [
{
"id": "GB-FTS-151563",
"name": "CJB Commissing Services"
}
]
}
],
"buyer": {
"id": "GB-COH-00559784",
"name": "THE PIRBRIGHT INSTITUTE"
},
"contracts": [
{
"aboveThreshold": false,
"awardID": "1",
"dateSigned": "2025-06-05T00:00:00+01:00",
"documents": [
{
"datePublished": "2025-06-17T10:59:47+01:00",
"description": "Contract details notice on Find a Tender",
"documentType": "contractNotice",
"format": "text/html",
"id": "032844-2025",
"noticeType": "UK7",
"url": "https://www.find-tender.service.gov.uk/Notice/032844-2025"
}
],
"id": "1",
"period": {
"endDate": "2025-12-31T23:59:59Z",
"startDate": "2025-06-09T00:00:00+01:00"
},
"status": "active",
"value": {
"amount": 49200,
"amountGross": 59040,
"currency": "GBP"
}
}
],
"date": "2025-06-17T10:59:47+01:00",
"id": "032844-2025",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-h6vhtk-054dff",
"parties": [
{
"additionalIdentifiers": [
{
"id": "PDZM-9963-XHWG",
"scheme": "GB-PPON"
}
],
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "Woking",
"postalCode": "GU24 0NF",
"region": "UKJ25",
"streetAddress": "Pirbright Laboratory Ash Road"
},
"contactPoint": {
"email": "Procurement.department@pirbright.ac.uk"
},
"details": {
"classifications": [
{
"description": "Public authority - sub-central government",
"id": "publicAuthoritySubCentralGovernment",
"scheme": "UK_CA_TYPE"
}
]
},
"id": "GB-COH-00559784",
"identifier": {
"id": "00559784",
"scheme": "GB-COH"
},
"name": "THE PIRBRIGHT INSTITUTE",
"roles": [
"buyer"
]
},
{
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "Alconbury, Huntingdon",
"postalCode": "PE28 4DP",
"region": "UKH12",
"streetAddress": "59 High Street"
},
"contactPoint": {
"email": "chris@cjbcomm.co.uk"
},
"details": {
"scale": "sme",
"vcse": false
},
"id": "GB-FTS-151563",
"name": "CJB Commissing Services",
"roles": [
"supplier"
]
}
],
"tag": [
"award",
"contract"
],
"tender": {
"description": "The Brooksby Building is a newly constructed and completed large animal High. Containment (Level 4) facility, designed and engineered to achieve ACDP3 and SAPO4 bio-containment levels. The building is arranged with 6 large animal holding suites, with each animal holding suite comprising 4 individual rooms.\nAs the \"Occupation \"Day 2\" Projects\" continues to progress, to provide Pirbright complete assurance of suitability for SAPO 4 / ACDP operation. \nAt present this comprises of four areas:\n1. Ventilation. A working group comprising Pirbright Ventilation, Process safety, BMS and Biosafety SMEs has been formed to undertake this performance verification. It is proposed that the 3rd party commissioning specialist will support this process in conjunction with the Brooksby ventilation installation \u0026 commissioning engineers. Accordingly, an allowance of 1 day per week to the end of December 2025 has been made, for a total of 20 days allowance.\n2. Incinerator. The following estimates have been made to support the incinerator programme of works. This will bring the incinerator to a fully operational and commissioned condition, sufficient for SAPO 4 ACDP 3 studies to commence. - Commissioning, Validation \u0026 Verification, and supervision: 2 days /week. Incinerator total: 50 days\n3. Safety Instrumented Function (SIF) installation \u0026 commissioning. - 5 days supervision and technical support.\n4. Occupation and Work Package 2 works support. (Supporting on-site management \u0026 coordination of work activities \u0026 interdependencies, basement issues support, technical support, meetings and administration). - 7 days supervision and technical support.\nTotal: 82 days (June 2025 - end December 2025) This period requires specialist technical support from those possessing detailed knowledge and experience of the Brooksby facility.",
"id": "ocds-h6vhtk-054dff",
"legalBasis": {
"id": "2023/54",
"scheme": "UKPGA",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
},
"lots": [
{
"id": "1",
"status": "complete"
}
],
"procurementMethod": "direct",
"procurementMethodDetails": "Below threshold - without competition",
"status": "complete",
"title": "Brooksby Occupational Support"
}
}