← Back to opportunities

Waterwhelm Novel Desalination Trial

Mining Remediation Authority

Buyer Contact Info

Buyer Name: Mining Remediation Authority

Buyer Address: 200 Lichfield Lane, Nottinghamshire, UKF15, NG18 4RG, United Kingdom

Contact Name: Roger Martin

Contact Email: procurement@coal.gov.uk

Status
complete
Procedure
direct
Value
190000.0 GBP
Published
17 Sep 2025, 14:02
Deadline
n/a
Contract Start
30 Sep 2025, 23:00
Contract End
31 Dec 2025, 23:59
Category
n/a
CPV
42912340 - Desalination apparatus
Region
n/a
Awarded To
Waterwhelm
Official Source
Open Find a Tender

Description

The Mining Remediation (MRA) Salinity Department are developing a Programme of short trails to research novel and emerging technologies which may be of use when seeking solutions to the problems posed by rising saline mine water. Waterwhelm is an award winning start up company based in the UK. Waterwhelm have designed and developed an efficient "Forward Osmosis" technology which has the potential to deliver large savings when compared against existing "Reverse Osmosis" technology. The prototype they have developed is highly mobile and can be deployed from shipping containers. Following a site visit in June this year, the Salinity Department believe this technology is worthy of inclusion in the trials programme. Salinity Department have identified the Lynemouth mine water treatment scheme as the site most suitable to run a Waterwhelm-operated pilot project. Waterwhelm's pilot plant deployed at Lynemouth will consist of two 20ft stacked shipping containers. These items of plant had previously operated at a capacity of 5m3/day, equivalent to reusing and processing 5,000 litres of wastewater or brackish water per day. When deployed at Lynemouth, the plant will operate at a capacity of ~2m3/day, powered by an electrical heater. The purpose of the plant will be to process water that has entered the mine and absorbed naturally occurring minerals from the rocks within the mine, such as iron. The pilot project will consist of five key stages (in order of occurrence): mobilisation; installation; commissioning; operation; and decommissioning/demobilisation. Subsequently, research and analysis of pilot test results will be gathered and evaluated before providing a detailed write-up of findings, along with a feasibility study and development of the business case. It is expected the project will run from September until December

Linked Documents

No linked documents found for this notice.

Opportunity Context

Lots

Lot 1 Status: complete

Lot 1 SME Suitable: Yes

Raw Notice JSON

Expand raw payload
{
  "awards": [
    {
      "aboveThreshold": false,
      "contractPeriod": {
        "endDate": "2025-12-31T23:59:59Z",
        "startDate": "2025-10-01T00:00:00+01:00"
      },
      "documents": [
        {
          "datePublished": "2025-09-17T15:02:31+01:00",
          "description": "Transparency notice on Find a Tender",
          "documentType": "awardNotice",
          "format": "text/html",
          "id": "057402-2025",
          "noticeType": "UK5",
          "url": "https://www.find-tender.service.gov.uk/Notice/057402-2025"
        }
      ],
      "id": "1",
      "items": [
        {
          "additionalClassifications": [
            {
              "description": "Desalination apparatus",
              "id": "42912340",
              "scheme": "CPV"
            },
            {
              "description": "Water-treatment work",
              "id": "45232430",
              "scheme": "CPV"
            },
            {
              "description": "Water desalination services",
              "id": "65122000",
              "scheme": "CPV"
            }
          ],
          "deliveryAddresses": [
            {
              "country": "GB",
              "countryName": "United Kingdom",
              "region": "UKC"
            },
            {
              "country": "GB",
              "countryName": "United Kingdom",
              "region": "UKD"
            },
            {
              "country": "GB",
              "countryName": "United Kingdom",
              "region": "UKE"
            },
            {
              "country": "GB",
              "countryName": "United Kingdom",
              "region": "UKF"
            },
            {
              "country": "GB",
              "countryName": "United Kingdom",
              "region": "UKG"
            },
            {
              "country": "GB",
              "countryName": "United Kingdom",
              "region": "UKH"
            },
            {
              "country": "GB",
              "countryName": "United Kingdom",
              "region": "UKI"
            },
            {
              "country": "GB",
              "countryName": "United Kingdom",
              "region": "UKJ"
            },
            {
              "country": "GB",
              "countryName": "United Kingdom",
              "region": "UKK"
            }
          ],
          "id": "1",
          "relatedLot": "1"
        }
      ],
      "mainProcurementCategory": "works",
      "milestones": [
        {
          "dueDate": "2025-09-29T23:59:59+01:00",
          "id": "1",
          "status": "scheduled",
          "type": "futureSignatureDate"
        }
      ],
      "relatedLots": [
        "1"
      ],
      "status": "pending",
      "suppliers": [
        {
          "id": "GB-FTS-161170",
          "name": "Waterwhelm"
        }
      ],
      "value": {
        "amount": 190000,
        "amountGross": 228000,
        "currency": "GBP"
      }
    }
  ],
  "buyer": {
    "id": "GB-PPON-PRPD-5825-QDVY",
    "name": "Mining Remediation Authority"
  },
  "date": "2025-09-17T15:02:31+01:00",
  "id": "057402-2025",
  "initiationType": "tender",
  "language": "en",
  "ocid": "ocds-h6vhtk-059c66",
  "parties": [
    {
      "address": {
        "country": "GB",
        "countryName": "United Kingdom",
        "locality": "Nottinghamshire",
        "postalCode": "NG18 4RG",
        "region": "UKF15",
        "streetAddress": "200 Lichfield Lane"
      },
      "contactPoint": {
        "email": "procurement@coal.gov.uk",
        "name": "Roger Martin"
      },
      "details": {
        "classifications": [
          {
            "description": "Public authority - central government",
            "id": "publicAuthorityCentralGovernment",
            "scheme": "UK_CA_TYPE"
          }
        ]
      },
      "id": "GB-PPON-PRPD-5825-QDVY",
      "identifier": {
        "id": "PRPD-5825-QDVY",
        "scheme": "GB-PPON"
      },
      "name": "Mining Remediation Authority",
      "roles": [
        "buyer"
      ]
    },
    {
      "address": {
        "country": "GB",
        "countryName": "United Kingdom",
        "locality": "Edinburgh",
        "postalCode": "EH4 2HS",
        "region": "UKM75",
        "streetAddress": "Suite 2, Orchard Brae House, 30 Queensferry Road,"
      },
      "contactPoint": {
        "email": "info@waterwhelm.com"
      },
      "details": {
        "scale": "sme",
        "vcse": false
      },
      "id": "GB-FTS-161170",
      "name": "Waterwhelm",
      "roles": [
        "supplier"
      ]
    }
  ],
  "tag": [
    "award",
    "contract"
  ],
  "tender": {
    "description": "The Mining Remediation (MRA) Salinity Department are developing a Programme of short trails to research novel and emerging technologies which may be of use when seeking solutions to the problems posed by rising saline mine water. \nWaterwhelm is an award winning  start up company based in the UK. Waterwhelm have designed and developed an efficient \"Forward Osmosis\" technology which has the potential to deliver large savings when compared against existing \"Reverse Osmosis\" technology. \nThe prototype they have developed is highly mobile and can be deployed from shipping containers.  Following a site visit in June this year, the Salinity Department believe this technology is worthy of inclusion in the trials programme. \nSalinity Department have identified the Lynemouth mine water treatment scheme as the site most suitable to run a Waterwhelm-operated pilot project. Waterwhelm\u0027s pilot plant deployed at Lynemouth will consist of  two 20ft stacked shipping containers. These items of plant had previously operated at a capacity of 5m3/day, equivalent to reusing and processing 5,000 litres of wastewater or brackish water per day.\nWhen deployed at Lynemouth, the plant will operate at a capacity of ~2m3/day, powered by an electrical heater. The purpose of the plant will be to process water that has entered the mine and absorbed naturally occurring minerals from the rocks within the mine, such as iron. \nThe pilot project will consist of five key stages (in order of occurrence): mobilisation; installation; commissioning; operation; and decommissioning/demobilisation. Subsequently, research and analysis of pilot test results will be gathered and evaluated before providing a detailed write-up of findings, along with a feasibility study and development of the business case.\nIt is expected the project will run from September until December",
    "id": "CA18/05741",
    "legalBasis": {
      "id": "2023/54",
      "scheme": "UKPGA",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
    },
    "lots": [
      {
        "id": "1",
        "status": "complete",
        "suitability": {
          "sme": true
        }
      }
    ],
    "procurementMethod": "direct",
    "procurementMethodDetails": "Below threshold - without competition",
    "status": "complete",
    "title": "Waterwhelm Novel Desalination Trial"
  }
}