Buyer Name: ASSOCIATED BRITISH PORTS
Buyer Address: 25 Bedford Street, London, UKI32, WC2E 9ES, United Kingdom
Contact Name: Daniel Murray
Contact Email: procurement@abports.co.uk
Buyer Name: ASSOCIATED BRITISH PORTS
Buyer Address: 25 Bedford Street, London, UKI32, WC2E 9ES, United Kingdom
Contact Name: Daniel Murray
Contact Email: procurement@abports.co.uk
ABP is looking to appoint suitably qualified contractors to our new Civils Framework. The ABP Civils Framework is designed to provide access to pre-qualified civil engineering contractors across the Humber, Southampton, South Wales and East Anglia. Its scope encompasses a wide range of low to mid value construction and maintenance works, structured to support both operational efficiency and Small to Medium size Enterprise (SME) participation. This Framework was shaped through extensive Applicant engagement, including Q&A sessions, face-to-face meetings, and questionnaires to refine the Lotting structure and address barriers to participation.
No linked documents found for this notice.
External Link: https://www.find-tender.service.gov.uk/Notice/074463-2025
Link Description: Tender notice on Find a Tender
Lot Title: Lot 1A - Humber - Minor Works
Lot Description: Lot 1A Humber - Minor Works (Estimated Individual Project Values £0 up to £250k)
Lot 1 Status: active
Lot 1 Value: GBP 0
Lot 1 Value (Gross): GBP 0
Lot 1 Contract Start: 2026-04-20T00:00:00+01:00
Lot 1 Contract End: 2031-04-19T23:59:59+01:00
Lot 1 SME Suitable: Yes
Lot 1 Award Criterion (price): Simple description
Lot Title: Lot 1B - Humber - Small Works
Lot Description: Lot 1B Humber - Small Works (Estimated Individual Project Values £250k up to £1.5M)
Lot 2 Status: active
Lot 2 Value: GBP 0
Lot 2 Value (Gross): GBP 0
Lot 2 Contract Start: 2026-04-20T00:00:00+01:00
Lot 2 Contract End: 2031-04-19T23:59:59+01:00
Lot 2 SME Suitable: Yes
Lot 2 Award Criterion (price): Simple description
Lot Title: Lot 1C - Humber - Surfacing Works
Lot Description: Lot 1C Humber – Surfacing Works (Estimated Contract Value up to £1M)
Lot 3 Status: active
Lot 3 Value: GBP 0
Lot 3 Value (Gross): GBP 0
Lot 3 Contract Start: 2026-04-20T00:00:00+01:00
Lot 3 Contract End: 2031-04-19T23:59:59+01:00
Lot 3 SME Suitable: Yes
Lot 3 Award Criterion (price): Simple description
Lot Title: Lot 2A - Southampton - Minor Works
Lot Description: Lot 2A Southampton - Minor Works (Estimated Individual Project Values £50k up to £500k)
Lot 4 Status: active
Lot 4 Value: GBP 0
Lot 4 Value (Gross): GBP 0
Lot 4 Contract Start: 2026-04-20T00:00:00+01:00
Lot 4 Contract End: 2031-04-19T23:59:59+01:00
Lot 4 SME Suitable: Yes
Lot 4 Award Criterion (price): Simple description
Lot Title: Lot 2B - Southampton - Small Works
Lot Description: Lot 2B Southampton - Small Works (Estimated Individual Project Values £500k up to £1.5M)
Lot 5 Status: active
Lot 5 Value: GBP 0
Lot 5 Value (Gross): GBP 0
Lot 5 Contract Start: 2026-04-20T00:00:00+01:00
Lot 5 Contract End: 2031-04-19T23:59:59+01:00
Lot 5 SME Suitable: Yes
Lot 5 Award Criterion (price): Simple description
Lot Title: Lot 3A - South Wales - Minor Works
Lot Description: Lot 3A South Wales - Minor Works (Estimated Individual Project Values £0 up to £250k)
Lot 6 Status: active
Lot 6 Value: GBP 0
Lot 6 Value (Gross): GBP 0
Lot 6 Contract Start: 2026-04-20T00:00:00+01:00
Lot 6 Contract End: 2031-04-19T23:59:59+01:00
Lot 6 SME Suitable: Yes
Lot 6 Award Criterion (price): Simple description
Lot Title: Lot 3B - South Wales -Small Works
Lot Description: Lot 3B South Wales - Small Works (Estimated Individual Project Values £250k up to £1.5M)
Lot 7 Status: active
Lot 7 Value: GBP 0
Lot 7 Value (Gross): GBP 0
Lot 7 Contract Start: 2026-04-20T00:00:00+01:00
Lot 7 Contract End: 2031-04-19T23:59:59+01:00
Lot 7 SME Suitable: Yes
Lot 7 Award Criterion (price): Simple description
Lot Title: Lot 3C - South Wales - Surfacing Works
Lot Description: Lot 3C South Wales – Surfacing Works (Estimated Contract Value up to £1M)
Lot 8 Status: active
Lot 8 Value: GBP 0
Lot 8 Value (Gross): GBP 0
Lot 8 Contract Start: 2026-04-20T00:00:00+01:00
Lot 8 Contract End: 2031-04-19T23:59:59+01:00
Lot 8 SME Suitable: Yes
Lot 8 Award Criterion (price): Simple description
Lot Title: Lot 4A - East Anglia - Minor Works
Lot Description: Lot 4A East Anglia - Minor Works (Estimated Individual Project Values £0 up to £250k)
Lot 9 Status: active
Lot 9 Value: GBP 0
Lot 9 Value (Gross): GBP 0
Lot 9 Contract Start: 2026-04-20T00:00:00+01:00
Lot 9 Contract End: 2031-04-19T23:59:59+01:00
Lot 9 SME Suitable: Yes
Lot 9 Award Criterion (price): Simple description
Lot Title: Lot 4B - East Anglia - Small Works
Lot Description: Lot 4B East Anglia - Small Works (Estimated Contract Value £250k up to £1.5M)
Lot 10 Status: active
Lot 10 Value: GBP 0
Lot 10 Value (Gross): GBP 0
Lot 10 Contract Start: 2026-04-20T00:00:00+01:00
Lot 10 Contract End: 2031-04-19T23:59:59+01:00
Lot 10 SME Suitable: Yes
Lot 10 Award Criterion (price): Simple description
Lot Title: Lot 4C - East Anglia – Surfacing Works
Lot Description: Lot 4C East Anglia – Surfacing Works (Estimated Contract Value up to £1M)
Lot 11 Status: active
Lot 11 Value: GBP 0
Lot 11 Value (Gross): GBP 0
Lot 11 Contract Start: 2026-04-20T00:00:00+01:00
Lot 11 Contract End: 2031-04-19T23:59:59+01:00
Lot 11 SME Suitable: Yes
Lot 11 Award Criterion (price): Simple description
Lot Title: Lot 5 - National Intermediate Works
Lot Description: Lot 5 National Intermediate Works (Estimated Individual Project Values £1.5M up to £4M)
Lot 12 Status: active
Lot 12 Value: GBP 0
Lot 12 Value (Gross): GBP 0
Lot 12 Contract Start: 2026-04-20T00:00:00+01:00
Lot 12 Contract End: 2031-04-19T23:59:59+01:00
Lot 12 SME Suitable: Yes
Lot 12 Award Criterion (price): Simple description
Lot Title: Lot 6 - General Inclusion
Lot Description: Lot 6 - General Inclusion Lot
Lot 13 Status: active
Lot 13 Value: GBP 0
Lot 13 Value (Gross): GBP 0
Lot 13 Contract Start: 2026-04-20T00:00:00+01:00
Lot 13 Contract End: 2031-04-19T23:59:59+01:00
Lot 13 SME Suitable: Yes
Lot 13 Award Criterion (price): Simple description
Document Description: Not published
Document Description: Tender notice on Find a Tender
{
"buyer": {
"id": "GB-COH-ZC000195",
"name": "ASSOCIATED BRITISH PORTS"
},
"date": "2025-11-17T15:17:08Z",
"id": "074463-2025",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-h6vhtk-05e2a2",
"parties": [
{
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "London",
"postalCode": "WC2E 9ES",
"region": "UKI32",
"streetAddress": "25 Bedford Street"
},
"contactPoint": {
"email": "procurement@abports.co.uk",
"name": "Daniel Murray"
},
"details": {
"classifications": [
{
"description": "Private utility",
"id": "privateUtility",
"scheme": "UK_CA_TYPE"
}
],
"url": "https://in-tendhost.co.uk/abp/aspx/Tenders/Current"
},
"id": "GB-COH-ZC000195",
"identifier": {
"id": "ZC000195",
"scheme": "GB-COH"
},
"name": "ASSOCIATED BRITISH PORTS",
"roles": [
"buyer"
]
}
],
"tag": [
"tender"
],
"tender": {
"aboveThreshold": true,
"awardPeriod": {
"endDate": "2026-03-31T23:59:59+01:00"
},
"description": "ABP is looking to appoint suitably qualified contractors to our new Civils Framework.\nThe ABP Civils Framework is designed to provide access to pre-qualified civil engineering contractors across the Humber, Southampton, South Wales and East Anglia. Its scope encompasses a wide range of low to mid value construction and maintenance works, structured to support both operational efficiency and Small to Medium size Enterprise (SME) participation.\nThis Framework was shaped through extensive Applicant engagement, including Q\u0026A sessions, face-to-face meetings, and questionnaires to refine the Lotting structure and address barriers to participation.",
"documents": [
{
"description": "Not published",
"documentType": "conflictOfInterest",
"id": "conflictOfInterest"
},
{
"datePublished": "2025-11-17T15:17:08Z",
"description": "Tender notice on Find a Tender",
"documentType": "tenderNotice",
"format": "text/html",
"id": "074463-2025",
"noticeType": "UK4",
"url": "https://www.find-tender.service.gov.uk/Notice/074463-2025"
}
],
"enquiryPeriod": {
"endDate": "2025-11-28T17:00:00+00:00"
},
"expressionOfInterestDeadline": "2025-12-12T12:00:00+00:00",
"id": "INF-GRP-25/1170",
"items": [
{
"additionalClassifications": [
{
"description": "Construction work",
"id": "45000000",
"scheme": "CPV"
},
{
"description": "Site preparation work",
"id": "45100000",
"scheme": "CPV"
},
{
"description": "Works for complete or part construction and civil engineering work",
"id": "45200000",
"scheme": "CPV"
},
{
"description": "Resurfacing works",
"id": "45233251",
"scheme": "CPV"
},
{
"description": "Building installation work",
"id": "45300000",
"scheme": "CPV"
},
{
"description": "Building completion work",
"id": "45400000",
"scheme": "CPV"
},
{
"description": "Hire of construction and civil engineering machinery and equipment with operator",
"id": "45500000",
"scheme": "CPV"
}
],
"id": "1",
"relatedLot": "1"
},
{
"additionalClassifications": [
{
"description": "Construction work",
"id": "45000000",
"scheme": "CPV"
},
{
"description": "Site preparation work",
"id": "45100000",
"scheme": "CPV"
},
{
"description": "Works for complete or part construction and civil engineering work",
"id": "45200000",
"scheme": "CPV"
},
{
"description": "Resurfacing works",
"id": "45233251",
"scheme": "CPV"
},
{
"description": "Building installation work",
"id": "45300000",
"scheme": "CPV"
},
{
"description": "Building completion work",
"id": "45400000",
"scheme": "CPV"
},
{
"description": "Hire of construction and civil engineering machinery and equipment with operator",
"id": "45500000",
"scheme": "CPV"
}
],
"id": "2",
"relatedLot": "2"
},
{
"additionalClassifications": [
{
"description": "Construction work",
"id": "45000000",
"scheme": "CPV"
},
{
"description": "Site preparation work",
"id": "45100000",
"scheme": "CPV"
},
{
"description": "Works for complete or part construction and civil engineering work",
"id": "45200000",
"scheme": "CPV"
},
{
"description": "Resurfacing works",
"id": "45233251",
"scheme": "CPV"
},
{
"description": "Building installation work",
"id": "45300000",
"scheme": "CPV"
},
{
"description": "Building completion work",
"id": "45400000",
"scheme": "CPV"
},
{
"description": "Hire of construction and civil engineering machinery and equipment with operator",
"id": "45500000",
"scheme": "CPV"
}
],
"id": "3",
"relatedLot": "3"
},
{
"additionalClassifications": [
{
"description": "Construction work",
"id": "45000000",
"scheme": "CPV"
},
{
"description": "Site preparation work",
"id": "45100000",
"scheme": "CPV"
},
{
"description": "Works for complete or part construction and civil engineering work",
"id": "45200000",
"scheme": "CPV"
},
{
"description": "Resurfacing works",
"id": "45233251",
"scheme": "CPV"
},
{
"description": "Building installation work",
"id": "45300000",
"scheme": "CPV"
},
{
"description": "Building completion work",
"id": "45400000",
"scheme": "CPV"
},
{
"description": "Hire of construction and civil engineering machinery and equipment with operator",
"id": "45500000",
"scheme": "CPV"
}
],
"id": "4",
"relatedLot": "4"
},
{
"additionalClassifications": [
{
"description": "Construction work",
"id": "45000000",
"scheme": "CPV"
},
{
"description": "Site preparation work",
"id": "45100000",
"scheme": "CPV"
},
{
"description": "Works for complete or part construction and civil engineering work",
"id": "45200000",
"scheme": "CPV"
},
{
"description": "Resurfacing works",
"id": "45233251",
"scheme": "CPV"
},
{
"description": "Building installation work",
"id": "45300000",
"scheme": "CPV"
},
{
"description": "Building completion work",
"id": "45400000",
"scheme": "CPV"
},
{
"description": "Hire of construction and civil engineering machinery and equipment with operator",
"id": "45500000",
"scheme": "CPV"
}
],
"id": "5",
"relatedLot": "5"
},
{
"additionalClassifications": [
{
"description": "Construction work",
"id": "45000000",
"scheme": "CPV"
},
{
"description": "Site preparation work",
"id": "45100000",
"scheme": "CPV"
},
{
"description": "Works for complete or part construction and civil engineering work",
"id": "45200000",
"scheme": "CPV"
},
{
"description": "Resurfacing works",
"id": "45233251",
"scheme": "CPV"
},
{
"description": "Building installation work",
"id": "45300000",
"scheme": "CPV"
},
{
"description": "Building completion work",
"id": "45400000",
"scheme": "CPV"
},
{
"description": "Hire of construction and civil engineering machinery and equipment with operator",
"id": "45500000",
"scheme": "CPV"
}
],
"id": "6",
"relatedLot": "6"
},
{
"additionalClassifications": [
{
"description": "Construction work",
"id": "45000000",
"scheme": "CPV"
},
{
"description": "Site preparation work",
"id": "45100000",
"scheme": "CPV"
},
{
"description": "Works for complete or part construction and civil engineering work",
"id": "45200000",
"scheme": "CPV"
},
{
"description": "Resurfacing works",
"id": "45233251",
"scheme": "CPV"
},
{
"description": "Building installation work",
"id": "45300000",
"scheme": "CPV"
},
{
"description": "Building completion work",
"id": "45400000",
"scheme": "CPV"
},
{
"description": "Hire of construction and civil engineering machinery and equipment with operator",
"id": "45500000",
"scheme": "CPV"
}
],
"id": "7",
"relatedLot": "7"
},
{
"additionalClassifications": [
{
"description": "Construction work",
"id": "45000000",
"scheme": "CPV"
},
{
"description": "Site preparation work",
"id": "45100000",
"scheme": "CPV"
},
{
"description": "Works for complete or part construction and civil engineering work",
"id": "45200000",
"scheme": "CPV"
},
{
"description": "Resurfacing works",
"id": "45233251",
"scheme": "CPV"
},
{
"description": "Building installation work",
"id": "45300000",
"scheme": "CPV"
},
{
"description": "Building completion work",
"id": "45400000",
"scheme": "CPV"
},
{
"description": "Hire of construction and civil engineering machinery and equipment with operator",
"id": "45500000",
"scheme": "CPV"
}
],
"id": "8",
"relatedLot": "8"
},
{
"additionalClassifications": [
{
"description": "Construction work",
"id": "45000000",
"scheme": "CPV"
},
{
"description": "Site preparation work",
"id": "45100000",
"scheme": "CPV"
},
{
"description": "Works for complete or part construction and civil engineering work",
"id": "45200000",
"scheme": "CPV"
},
{
"description": "Resurfacing works",
"id": "45233251",
"scheme": "CPV"
},
{
"description": "Building installation work",
"id": "45300000",
"scheme": "CPV"
},
{
"description": "Building completion work",
"id": "45400000",
"scheme": "CPV"
},
{
"description": "Hire of construction and civil engineering machinery and equipment with operator",
"id": "45500000",
"scheme": "CPV"
}
],
"id": "9",
"relatedLot": "9"
},
{
"additionalClassifications": [
{
"description": "Construction work",
"id": "45000000",
"scheme": "CPV"
},
{
"description": "Site preparation work",
"id": "45100000",
"scheme": "CPV"
},
{
"description": "Works for complete or part construction and civil engineering work",
"id": "45200000",
"scheme": "CPV"
},
{
"description": "Resurfacing works",
"id": "45233251",
"scheme": "CPV"
},
{
"description": "Building installation work",
"id": "45300000",
"scheme": "CPV"
},
{
"description": "Building completion work",
"id": "45400000",
"scheme": "CPV"
},
{
"description": "Hire of construction and civil engineering machinery and equipment with operator",
"id": "45500000",
"scheme": "CPV"
}
],
"id": "10",
"relatedLot": "10"
},
{
"additionalClassifications": [
{
"description": "Construction work",
"id": "45000000",
"scheme": "CPV"
},
{
"description": "Site preparation work",
"id": "45100000",
"scheme": "CPV"
},
{
"description": "Works for complete or part construction and civil engineering work",
"id": "45200000",
"scheme": "CPV"
},
{
"description": "Resurfacing works",
"id": "45233251",
"scheme": "CPV"
},
{
"description": "Building installation work",
"id": "45300000",
"scheme": "CPV"
},
{
"description": "Building completion work",
"id": "45400000",
"scheme": "CPV"
},
{
"description": "Hire of construction and civil engineering machinery and equipment with operator",
"id": "45500000",
"scheme": "CPV"
}
],
"id": "11",
"relatedLot": "11"
},
{
"additionalClassifications": [
{
"description": "Construction work",
"id": "45000000",
"scheme": "CPV"
},
{
"description": "Site preparation work",
"id": "45100000",
"scheme": "CPV"
},
{
"description": "Works for complete or part construction and civil engineering work",
"id": "45200000",
"scheme": "CPV"
},
{
"description": "Resurfacing works",
"id": "45233251",
"scheme": "CPV"
},
{
"description": "Building installation work",
"id": "45300000",
"scheme": "CPV"
},
{
"description": "Building completion work",
"id": "45400000",
"scheme": "CPV"
},
{
"description": "Hire of construction and civil engineering machinery and equipment with operator",
"id": "45500000",
"scheme": "CPV"
}
],
"id": "12",
"relatedLot": "12"
},
{
"additionalClassifications": [
{
"description": "Construction work",
"id": "45000000",
"scheme": "CPV"
},
{
"description": "Site preparation work",
"id": "45100000",
"scheme": "CPV"
},
{
"description": "Works for complete or part construction and civil engineering work",
"id": "45200000",
"scheme": "CPV"
},
{
"description": "Resurfacing works",
"id": "45233251",
"scheme": "CPV"
},
{
"description": "Building installation work",
"id": "45300000",
"scheme": "CPV"
},
{
"description": "Building completion work",
"id": "45400000",
"scheme": "CPV"
},
{
"description": "Hire of construction and civil engineering machinery and equipment with operator",
"id": "45500000",
"scheme": "CPV"
}
],
"id": "13",
"relatedLot": "13"
}
],
"legalBasis": {
"id": "2023/54",
"scheme": "UKPGA",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
},
"lots": [
{
"awardCriteria": {
"criteria": [
{
"description": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document.",
"name": "Simple description",
"type": "price"
}
],
"weightingDescription": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document."
},
"contractPeriod": {
"endDate": "2031-04-19T23:59:59+01:00",
"maxExtentDate": "2034-04-19T23:59:59+00:00",
"startDate": "2026-04-20T00:00:00+01:00"
},
"description": "Lot 1A\tHumber - Minor Works (Estimated Individual Project Values \u00a30 up to \u00a3250k)",
"hasRenewal": true,
"id": "1",
"renewal": {
"description": "The proposed Framework Agreement will be in place for 5 years with a possible extension provision of 3 years, with the maximum duration to be 8 years. The framework will be extended at the discretion of the Authority at the end of year 5."
},
"status": "active",
"suitability": {
"sme": true
},
"title": "Lot 1A - Humber - Minor Works",
"value": {
"amount": 0,
"amountGross": 0,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document.",
"name": "Simple description",
"type": "price"
}
],
"weightingDescription": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document."
},
"contractPeriod": {
"endDate": "2031-04-19T23:59:59+01:00",
"maxExtentDate": "2034-04-19T23:59:59+00:00",
"startDate": "2026-04-20T00:00:00+01:00"
},
"description": "Lot 1B\tHumber - Small Works (Estimated Individual Project Values \u00a3250k up to \u00a31.5M)",
"hasRenewal": true,
"id": "2",
"renewal": {
"description": "The proposed Framework Agreement will be in place for 5 years with a possible extension provision of 3 years, with the maximum duration to be 8 years. The framework will be extended at the discretion of the Authority at the end of year 5."
},
"status": "active",
"suitability": {
"sme": true
},
"title": "Lot 1B - Humber - Small Works",
"value": {
"amount": 0,
"amountGross": 0,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document.",
"name": "Simple description",
"type": "price"
}
],
"weightingDescription": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document."
},
"contractPeriod": {
"endDate": "2031-04-19T23:59:59+01:00",
"maxExtentDate": "2034-04-19T23:59:59+00:00",
"startDate": "2026-04-20T00:00:00+01:00"
},
"description": "Lot 1C\tHumber \u2013 Surfacing Works (Estimated Contract Value up to \u00a31M)",
"hasRenewal": true,
"id": "3",
"renewal": {
"description": "The proposed Framework Agreement will be in place for 5 years with a possible extension provision of 3 years, with the maximum duration to be 8 years. The framework will be extended at the discretion of the Authority at the end of year 5."
},
"status": "active",
"suitability": {
"sme": true
},
"title": "Lot 1C - Humber - Surfacing Works",
"value": {
"amount": 0,
"amountGross": 0,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document.",
"name": "Simple description",
"type": "price"
}
],
"weightingDescription": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document."
},
"contractPeriod": {
"endDate": "2031-04-19T23:59:59+01:00",
"maxExtentDate": "2034-04-19T23:59:59+00:00",
"startDate": "2026-04-20T00:00:00+01:00"
},
"description": "Lot 2A\tSouthampton - Minor Works (Estimated Individual Project Values \u00a350k up to \u00a3500k)",
"hasRenewal": true,
"id": "4",
"renewal": {
"description": "The proposed Framework Agreement will be in place for 5 years with a possible extension provision of 3 years, with the maximum duration to be 8 years. The framework will be extended at the discretion of the Authority at the end of year 5."
},
"status": "active",
"suitability": {
"sme": true
},
"title": "Lot 2A - Southampton - Minor Works",
"value": {
"amount": 0,
"amountGross": 0,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document.",
"name": "Simple description",
"type": "price"
}
],
"weightingDescription": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document."
},
"contractPeriod": {
"endDate": "2031-04-19T23:59:59+01:00",
"maxExtentDate": "2034-04-19T23:59:59+00:00",
"startDate": "2026-04-20T00:00:00+01:00"
},
"description": "Lot 2B\tSouthampton - Small Works (Estimated Individual Project Values \u00a3500k up to \u00a31.5M)",
"hasRenewal": true,
"id": "5",
"renewal": {
"description": "The proposed Framework Agreement will be in place for 5 years with a possible extension provision of 3 years, with the maximum duration to be 8 years. The framework will be extended at the discretion of the Authority at the end of year 5."
},
"status": "active",
"suitability": {
"sme": true
},
"title": "Lot 2B - Southampton - Small Works",
"value": {
"amount": 0,
"amountGross": 0,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document.",
"name": "Simple description",
"type": "price"
}
],
"weightingDescription": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document."
},
"contractPeriod": {
"endDate": "2031-04-19T23:59:59+01:00",
"maxExtentDate": "2034-04-19T23:59:59+00:00",
"startDate": "2026-04-20T00:00:00+01:00"
},
"description": "Lot 3A\tSouth Wales - Minor Works (Estimated Individual Project Values \u00a30 up to \u00a3250k)",
"hasRenewal": true,
"id": "6",
"renewal": {
"description": "The proposed Framework Agreement will be in place for 5 years with a possible extension provision of 3 years, with the maximum duration to be 8 years. The framework will be extended at the discretion of the Authority at the end of year 5."
},
"status": "active",
"suitability": {
"sme": true
},
"title": "Lot 3A -\tSouth Wales - Minor Works",
"value": {
"amount": 0,
"amountGross": 0,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document.",
"name": "Simple description",
"type": "price"
}
],
"weightingDescription": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document."
},
"contractPeriod": {
"endDate": "2031-04-19T23:59:59+01:00",
"maxExtentDate": "2034-04-19T23:59:59+00:00",
"startDate": "2026-04-20T00:00:00+01:00"
},
"description": "Lot 3B\tSouth Wales - Small Works (Estimated Individual Project Values \u00a3250k up to \u00a31.5M)",
"hasRenewal": true,
"id": "7",
"renewal": {
"description": "The proposed Framework Agreement will be in place for 5 years with a possible extension provision of 3 years, with the maximum duration to be 8 years. The framework will be extended at the discretion of the Authority at the end of year 5."
},
"status": "active",
"suitability": {
"sme": true
},
"title": "Lot 3B - South Wales -Small Works",
"value": {
"amount": 0,
"amountGross": 0,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document.",
"name": "Simple description",
"type": "price"
}
],
"weightingDescription": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document."
},
"contractPeriod": {
"endDate": "2031-04-19T23:59:59+01:00",
"maxExtentDate": "2034-04-19T23:59:59+00:00",
"startDate": "2026-04-20T00:00:00+01:00"
},
"description": "Lot 3C\tSouth Wales \u2013 Surfacing Works (Estimated Contract Value up to \u00a31M)",
"hasRenewal": true,
"id": "8",
"renewal": {
"description": "The proposed Framework Agreement will be in place for 5 years with a possible extension provision of 3 years, with the maximum duration to be 8 years. The framework will be extended at the discretion of the Authority at the end of year 5."
},
"status": "active",
"suitability": {
"sme": true
},
"title": "Lot 3C - South Wales - Surfacing Works",
"value": {
"amount": 0,
"amountGross": 0,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document.",
"name": "Simple description",
"type": "price"
}
],
"weightingDescription": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document."
},
"contractPeriod": {
"endDate": "2031-04-19T23:59:59+01:00",
"maxExtentDate": "2034-04-19T23:59:59+00:00",
"startDate": "2026-04-20T00:00:00+01:00"
},
"description": "Lot 4A\tEast Anglia - Minor Works (Estimated Individual Project Values \u00a30 up to \u00a3250k)",
"hasRenewal": true,
"id": "9",
"renewal": {
"description": "The proposed Framework Agreement will be in place for 5 years with a possible extension provision of 3 years, with the maximum duration to be 8 years. The framework will be extended at the discretion of the Authority at the end of year 5."
},
"status": "active",
"suitability": {
"sme": true
},
"title": "Lot 4A - East Anglia - Minor Works",
"value": {
"amount": 0,
"amountGross": 0,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document.",
"name": "Simple description",
"type": "price"
}
],
"weightingDescription": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document."
},
"contractPeriod": {
"endDate": "2031-04-19T23:59:59+01:00",
"maxExtentDate": "2034-04-19T23:59:59+00:00",
"startDate": "2026-04-20T00:00:00+01:00"
},
"description": "Lot 4B\tEast Anglia - Small Works (Estimated Contract Value \u00a3250k up to \u00a31.5M)",
"hasRenewal": true,
"id": "10",
"renewal": {
"description": "The proposed Framework Agreement will be in place for 5 years with a possible extension provision of 3 years, with the maximum duration to be 8 years. The framework will be extended at the discretion of the Authority at the end of year 5."
},
"status": "active",
"suitability": {
"sme": true
},
"title": "Lot 4B - East Anglia - Small Works",
"value": {
"amount": 0,
"amountGross": 0,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document.",
"name": "Simple description",
"type": "price"
}
],
"weightingDescription": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document."
},
"contractPeriod": {
"endDate": "2031-04-19T23:59:59+01:00",
"maxExtentDate": "2034-04-19T23:59:59+00:00",
"startDate": "2026-04-20T00:00:00+01:00"
},
"description": "Lot 4C\tEast Anglia \u2013 Surfacing Works (Estimated Contract Value up to \u00a31M)",
"hasRenewal": true,
"id": "11",
"renewal": {
"description": "The proposed Framework Agreement will be in place for 5 years with a possible extension provision of 3 years, with the maximum duration to be 8 years. The framework will be extended at the discretion of the Authority at the end of year 5."
},
"status": "active",
"suitability": {
"sme": true
},
"title": "Lot 4C - East Anglia \u2013 Surfacing Works",
"value": {
"amount": 0,
"amountGross": 0,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document.",
"name": "Simple description",
"type": "price"
}
],
"weightingDescription": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document."
},
"contractPeriod": {
"endDate": "2031-04-19T23:59:59+01:00",
"maxExtentDate": "2034-04-19T23:59:59+00:00",
"startDate": "2026-04-20T00:00:00+01:00"
},
"description": "Lot 5 \tNational Intermediate Works (Estimated Individual Project Values \u00a31.5M up to \u00a34M)",
"hasRenewal": true,
"id": "12",
"renewal": {
"description": "The proposed Framework Agreement will be in place for 5 years with a possible extension provision of 3 years, with the maximum duration to be 8 years. The framework will be extended at the discretion of the Authority at the end of year 5."
},
"status": "active",
"suitability": {
"sme": true
},
"title": "Lot 5 - National Intermediate Works",
"value": {
"amount": 0,
"amountGross": 0,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document.",
"name": "Simple description",
"type": "price"
}
],
"weightingDescription": "The following information summarises the approach to evaluating and scoring the Applicants PSQ response.\nInitial Compliance Check\nABP will undertake a compliance check of the information submitted (including checks on ABP\u2019s compliance screening software). Failure to complete all relevant questions, failure to enclose supporting documentation or compliance concerns being flagged by ABP\u2019s compliance screening software may result in the Applicant\u2019s PSQ response being rejected.\nProvided for information only and not scored\nA number of sections of this PSQ which are to be returned with your submission are not scored and are supplied for ABP\u2019s information only. However, these sections must be fully completed \u0026 all information required and requested must be provided.\nMandatory Pass / Fail sections\nA number of sections are PASS/FAIL criteria with either a mandatory PASS or discretionary PASS requirements. If you score a FAIL in any one of the sub-sections of the PSQ, the Applicant will not progress to the next stage. If you score a PASS in all of the sub-sections, your submission will progress to the full PSQ evaluation stage.\nThe sections that are evaluated using the mandatory PASS/FAIL criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document\nScored and weighted sections\nOnly those Applicants that have passed the \u201cPASS/FAIL\u201d criteria and provided the information in the \u201cFor Information only\u201d sections will go on to be fully scored by the ABP Evaluation Team. \nThe sections that are to be evaluated using the below Scoring Criteria are clearly detailed in the PSQ Response Document contained within Appendix 04 - PSQ Response Document."
},
"contractPeriod": {
"endDate": "2031-04-19T23:59:59+01:00",
"maxExtentDate": "2034-04-19T23:59:59+00:00",
"startDate": "2026-04-20T00:00:00+01:00"
},
"description": "Lot 6 - General Inclusion Lot",
"hasRenewal": true,
"id": "13",
"renewal": {
"description": "The proposed Framework Agreement will be in place for 5 years with a possible extension provision of 3 years, with the maximum duration to be 8 years. The framework will be extended at the discretion of the Authority at the end of year 5."
},
"status": "active",
"suitability": {
"sme": true
},
"title": "Lot 6 - General Inclusion",
"value": {
"amount": 0,
"amountGross": 0,
"currency": "GBP"
}
}
],
"mainProcurementCategory": "works",
"procedure": {
"features": "The two-stage process is as described below:\nStage 1 PSQ\nThe Applicant is issued with a PSQ including instructions to Applicants, Requirements and a set of qualitative questions which are to demonstrate the Applicant\u2019s:\n\u2022\tCompliance\n\u2022\tFinancial Capability\n\u2022\tLegal Capability\n\u2022\tHealth \u0026 Safety Approach\n\u2022\tQuality Approach\n\u2022\tSupply Chain Approach\n\u2022\tQuality Approach\n\u2022\tTechnical Capability and Experience\nCompleted PSQ should be submitted strictly in accordance with the instructions to Applicants described within the PSQ document and received by ABP no later than 12/12/2025 at 12:00 GMT.\nFor the avoidance of doubt, the Applicants are required to submit all documents requested to be included in all sections of the PSQ Response Document attached in Appendix 04 \u2013 PSQ Response Document to enable their PSQ submissions to be fully evaluated against the evaluation criteria. The evaluation criteria are also provided within the PSQ Response Document.\nStage 2 \u2013 Invitation to Tender (ITT)\nFollowing the conclusion of Stage 1 PSQ, down \u2013 selected Applicants will be invited to participate in the second stage of the process.\nStage 2 will comprise the issuing of the ITT to the successful down-selected applicants for each geographical Lot and sub Lot.\nClear objectives and evaluation criteria aligned to strategic goals will be included in the tender documents, inviting Applicants to demonstrate how their proposals will deliver broader organisational benefits.\nFollowing this stage, ABP will award Contract/s based on the Most Advantageous Tender, based on the evaluation criteria."
},
"procurementMethod": "selective",
"procurementMethodDetails": "Competitive flexible procedure",
"specialRegime": [
"utilities"
],
"status": "active",
"submissionMethodDetails": "https://in-tendhost.co.uk/abp/aspx/Tenders/Current",
"submissionTerms": {
"electronicSubmissionPolicy": "allowed",
"languages": [
"en"
]
},
"techniques": {
"frameworkAgreement": {
"description": "ABP will have the option to call-off contracts or engage in mini-competitions under the Framework Agreement with individual Applicants as and when services are required. Please note however that there is no obligation for ABP to call off from the Framework Agreement (i.e. ABP may appoint work to parties outside of the Framework Agreement if necessary). \nLots 1A, 3A, 4A \u0026 1C, 3C \u0026 4C \nFor Lots 1A, 3A, 4A \u0026 1C, 3C \u0026 4C, any work awarded will use the NEC4 Term Service Contract and individual Task Orders will be issued accordingly by the Service Manager to instruct specific items of work within the scope of the contract. The schedule of rates submitted at tender stage will be used as the basis for pricing all Task Orders. \nLots 1B, 2B, 3B, 4B \u0026 Lot 5\nFor Lots 1B, 2B, 3B, 4B \u0026 Lot 5, work will be awarded in two ways; firstly, the results of a mini-competition with either price or price/quality being the assessment criteria. This will be defined during the publication of each individual request for quotation (Call off contract); or secondly, through a direct award. ABP reserves the right to make an award to any Contractor it feels will provide the required works most effectively.\nWork will be awarded through the framework using Work Orders (in line with the NEC4 Framework Contract). Each Work Order will be accompanied by an NEC4 Engineering \u0026 Construction Contract signed as a deed for Lots 1B, 2B, 3B, 4B \u0026 Lot 5.\nLot 2A \nFor Lot 2A, the work awarded will use the JCT Measured Term Contract. Each call-off will be instructed by the Employer under the agreed schedule of rates, ensuring transparency and consistency in pricing. This approach provides flexibility for recurring tasks while maintaining contractual certainty and compliance with JCT terms. \nCall of Procedures\nABP ultimately reserves the right, at its sole discretion, to utilise any of the following call-off procedures under the framework agreement, this applies to all Lots:\nMini-Competition\nA competitive process where all eligible Applicants on the Lot are invited to submit bids for a specific requirement. Evaluation is based on the criteria set out in the mini-competition documentation.\nDirect Award Procedure\nABP may award a contract directly to a Applicant without further competition. This is typically used where there is an urgent requirement or a clear best-fit Applicant.",
"method": "withAndWithoutReopeningCompetition",
"type": "closed"
},
"hasFrameworkAgreement": true
},
"title": "ABP Civils Framework",
"value": {
"amountGross": 102000000,
"currency": "GBP"
}
}
}