← Back to opportunities

Organic Rankine Cycle Generator

University of York

Buyer Contact Info

Buyer Name: University of York

Buyer Address: Brockholme, York Road, Cliffe YO8 6NU, Selby, UKE21, YO10 5DD, United Kingdom

Contact Name: Rob Allan

Contact Email: rob.allan@york.ac.uk

Status
complete
Procedure
direct
Value
250000.0 GBP
Published
22 Dec 2025, 15:58
Deadline
n/a
Contract Start
06 Jan 2026, 00:00
Contract End
31 Mar 2026, 22:59
Category
n/a
CPV
31100000 - Electric motors, generators and transformers
Region
n/a
Awarded To
FeTu Limited
Official Source
Open Find a Tender

Description

The University of York ("the Authority") is delivering an exciting deep geothermal energy project as a transformative step in its journey to Net Zero. The project aims to cut fossil fuel consumption by 78% as part of the Authority's Sustainability Plan 2030 targets, and making a substantial contribution to reducing the City of York's overall carbon footprint. This multi-phased initiative will leverage the Earth's natural heat to provide sustainable energy solutions for the Authority's campus and potentially the wider community. The project positions the University of York, City and region as a leader in sustainable energy innovation, combining geothermal exploration with our renowned research and educational expertise. The Authority's geothermal project has identified electrical generation as a goal associated with long term success. Of the research done to date the Organic Rankine Cycle machine (ORC) has presented itself as the only viable technology compatible with temperatures and energy demands the Authority will have. With the geothermal scheme coming online there is the potential for excess heat to be utilized to generate electricity to both offset the running of the geothermal system and provide energy cost savings to the Authority. FeTu is a UK manufacturer that has developed a patented design for an ORC that develops double the efficiency of existing units and can output up to 200kW of electricity, while also addressing operational safety concerns like the removal of flammable working fluids. The Authority is to procure one of the FeTu generators to run on site as a trial unit to research and test the effectiveness of such a power generating system in the Authority's environment. The Authority shall use the outputs to produce an internal report focussing on the operational efficiency modelling of reciprocal positive displacement turbines, in conjunction with the geothermal scheme at varying temperatures and flow rates. This will be essential in appraising options for how to utilize the geothermal heat dependent on the results of drilling. The test system shall be installed and operated using unutilized heat in our district heating system at the temperatures likely produced in the geothermal system. The Authority also has the infrastructure to install, maintain, monitor and optimize this new technology as part of the Authority's living lab of energy technologies. By being presented with an opportunity to install a unit before the geothermal scheme is online the Authority can prove the efficiency of operation of the unit, optimize its installation and control and generate savings immediately by utilizing waste heat. The Authority's Estates engineering team have visited the manufacturing and test facility and completed site assessments with the manufacturer to confirm the suitability of the prototype and new system for installation. The Authority has researched the market and believes there are no other competing technologies available on the market that offer the same efficiency at present due to the technology being patented technology. Should this new technology prove effective and the research outcomes favourable this will lead to a future procurement to purchase a number of generators with functionality appropriate to generate power from the waste heat the Authority will have available as it progresses its geothermal project. A future open tender shall therefore be advertised.

Linked Documents

No linked documents found for this notice.

Opportunity Context

Lots

Lot 1 Status: complete

Documents

Document Description: Not published

Awards

Award Title: Organic Rankine Cycle Generator

Raw Notice JSON

Expand raw payload
{
  "awards": [
    {
      "aboveThreshold": true,
      "contractPeriod": {
        "endDate": "2026-03-31T23:59:59+01:00",
        "startDate": "2026-01-06T00:00:00Z"
      },
      "documents": [
        {
          "datePublished": "2025-12-22T15:58:20Z",
          "description": "Transparency notice on Find a Tender",
          "documentType": "awardNotice",
          "format": "text/html",
          "id": "085535-2025",
          "noticeType": "UK5",
          "url": "https://www.find-tender.service.gov.uk/Notice/085535-2025"
        }
      ],
      "id": "1",
      "items": [
        {
          "additionalClassifications": [
            {
              "description": "Electric motors, generators and transformers",
              "id": "31100000",
              "scheme": "CPV"
            },
            {
              "description": "Electrical equipment and apparatus",
              "id": "31600000",
              "scheme": "CPV"
            }
          ],
          "deliveryAddresses": [
            {
              "country": "GB",
              "countryName": "United Kingdom",
              "region": "UKE21"
            }
          ],
          "id": "1",
          "relatedLot": "1"
        }
      ],
      "mainProcurementCategory": "goods",
      "milestones": [
        {
          "dueDate": "2026-01-06T23:59:59Z",
          "id": "1",
          "status": "scheduled",
          "type": "futureSignatureDate"
        }
      ],
      "relatedLots": [
        "1"
      ],
      "status": "pending",
      "suppliers": [
        {
          "id": "GB-COH-10162038",
          "name": "FeTu Limited"
        }
      ],
      "title": "Organic Rankine Cycle Generator",
      "value": {
        "amountGross": 250000,
        "currency": "GBP"
      }
    }
  ],
  "buyer": {
    "id": "GB-UKPRN-10007167",
    "name": "University of York"
  },
  "date": "2025-12-22T15:58:20Z",
  "id": "085535-2025",
  "initiationType": "tender",
  "language": "en",
  "ocid": "ocds-h6vhtk-05fbe3",
  "parties": [
    {
      "additionalIdentifiers": [
        {
          "id": "PRDQ-5539-WTHX",
          "scheme": "GB-PPON"
        }
      ],
      "address": {
        "country": "GB",
        "countryName": "United Kingdom",
        "locality": "Selby",
        "postalCode": "YO10 5DD",
        "region": "UKE21",
        "streetAddress": "Brockholme, York Road, Cliffe YO8 6NU"
      },
      "contactPoint": {
        "email": "rob.allan@york.ac.uk",
        "name": "Rob Allan"
      },
      "details": {
        "classifications": [
          {
            "description": "Public authority - sub-central government",
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE"
          }
        ],
        "url": "http://www.york.ac.uk"
      },
      "id": "GB-UKPRN-10007167",
      "identifier": {
        "id": "10007167",
        "scheme": "GB-UKPRN"
      },
      "name": "University of York",
      "roles": [
        "buyer"
      ]
    },
    {
      "address": {
        "country": "GB",
        "countryName": "United Kingdom",
        "locality": "Elland",
        "postalCode": "HX5 9HH",
        "region": "UKE44",
        "streetAddress": "The Wharf, Gas Works Lane"
      },
      "contactPoint": {
        "email": "info@fetu.co.uk"
      },
      "details": {
        "scale": "sme",
        "url": "https://www.fetu.co.uk/",
        "vcse": false
      },
      "id": "GB-COH-10162038",
      "identifier": {
        "id": "10162038",
        "scheme": "GB-COH"
      },
      "name": "FeTu Limited",
      "roles": [
        "supplier"
      ]
    }
  ],
  "tag": [
    "award",
    "contract"
  ],
  "tender": {
    "description": "The University of York (\"the Authority\") is delivering an exciting deep geothermal energy project as a transformative step in its journey to Net Zero. The project aims to cut  fossil fuel consumption by 78% as part of the Authority\u0027s Sustainability Plan 2030 targets, and making a substantial contribution to reducing the City of York\u0027s overall carbon footprint.\nThis multi-phased initiative will leverage the Earth\u0027s natural heat to provide sustainable energy solutions for the Authority\u0027s campus and potentially the wider community. The project positions the University of York, City and region as a leader in sustainable energy innovation, combining geothermal exploration with our renowned research and educational expertise.\nThe Authority\u0027s  geothermal project has identified electrical generation as a goal associated with long term success. Of the research done to date the Organic Rankine Cycle machine\n(ORC) has presented itself as the only viable technology compatible with temperatures and energy demands the Authority will have. With the geothermal scheme coming online there is the potential for excess heat to be utilized to generate electricity to both offset the running of the geothermal system and provide energy cost savings to the Authority. \nFeTu is a UK manufacturer that has developed a patented design for an ORC that develops double the efficiency of existing units and can output up to 200kW of electricity, while also addressing operational safety concerns like the removal of flammable working fluids.\nThe Authority is to procure one of the FeTu generators to run on site as a trial unit to research and test the effectiveness of such a power generating system in the Authority\u0027s environment. \nThe Authority shall use the outputs to produce an internal report focussing on the operational efficiency modelling of reciprocal positive displacement turbines, in conjunction with the geothermal scheme at varying temperatures and flow rates. This will be essential in appraising options for how to utilize the geothermal heat dependent on the results of drilling.\nThe test system shall be installed and operated using unutilized heat in our district heating system at the temperatures likely produced in the geothermal system. The Authority also has the  infrastructure to install, maintain, monitor and optimize this new technology as part of the Authority\u0027s living lab of energy\ntechnologies. \nBy being presented with an opportunity to install a unit before the\ngeothermal scheme is online the Authority can prove the efficiency of operation of the unit, optimize its installation and control and generate savings immediately by utilizing waste heat.\nThe Authority\u0027s Estates engineering team have visited the manufacturing and test facility and completed site assessments with the manufacturer to confirm the suitability of the prototype and new system for installation. \nThe Authority has researched the market and believes there are no other competing technologies available on the market that offer the same efficiency at present due to the technology being patented technology. \nShould this new technology prove effective and the research outcomes favourable this will lead to a future procurement to purchase a number of generators with functionality appropriate to generate power from the waste heat the Authority will have available as it progresses its geothermal project. A future open tender shall therefore be advertised.",
    "documents": [
      {
        "description": "Not published",
        "documentType": "conflictOfInterest",
        "id": "conflictOfInterest"
      }
    ],
    "id": "UY PROC 1244",
    "legalBasis": {
      "id": "2023/54",
      "scheme": "UKPGA",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
    },
    "lots": [
      {
        "id": "1",
        "status": "complete"
      }
    ],
    "procurementMethod": "direct",
    "procurementMethodDetails": "Direct award",
    "procurementMethodRationale": "The Authority has researched the marketplace and of the research carried out to date, the Organic Rankine Cycle machine\n(ORC) has presented itself as a novel product and a viable technology compatible with temperatures and energy demands the Authority envisages having.\nFeTu is a manufacturer that has developed a patented design for an ORC that develops double the efficiency of existing units and can output up to 200kW of electricity, while also addressing operational safety concerns like the removal of flammable working fluids. \nThe Authority is purchasing a single unit to help its research, which if successful will allow the Authority to issue a future tender for similar units and technology once it better understands the research outputs of the ORC technology. \nThe Authority is procuring one single unit on the grounds that it believes the unit to be a prototype, and a novel product and wishes to test its suitability, as well as researching the viability of such power generation within the Authority\u0027s setting.",
    "procurementMethodRationaleClassifications": [
      {
        "id": "prototypesDevelopment"
      },
      {
        "id": "singleSuppliersIntellectualPropertyExclusiveRights"
      },
      {
        "id": "singleSuppliersTechnicalReasons"
      },
      {
        "id": "urgency"
      }
    ],
    "status": "complete",
    "title": "Organic Rankine Cycle Generator"
  }
}