Buyer Name: Balfour Beatty VINCI Systra JV
Buyer Address: Astral House Imperial Way, Watford, WD244WW, UK
Contact Name: Manish Tailor
Contact Email: supplychain@bbvsjv.com
Contact Telephone: 07738982498
Buyer Name: Balfour Beatty VINCI Systra JV
Buyer Address: Astral House Imperial Way, Watford, WD244WW, UK
Contact Name: Manish Tailor
Contact Email: supplychain@bbvsjv.com
Contact Telephone: 07738982498
WP15 Final highways scope The OOC Lane realignment & Final highways scope package consists of: Removal of all existing highway surfacing and street furniture (is there any to be retained / relocated or does it include disposal?) Installation of any temporary critical highway furniture (e.g. Street Lighting, Barriers) required to carry out the works Requirement to maintain a 2m wide footpath to be used by the public throughout the construction of the package, the subcontractor is to include the installation and maintenance of this public footpath, and relocation as required to suit the construction sequence. The excavation of the existing highway down to final formation level, and any other necessary levels required to enable temporary works or sequencing All temporary works required for the construction of the works, including any access requirements Assessments to structures, utilities, properties, which may be affected by the works, as required to satisfy client, Contractor and/or 3rd parties requirements Removal and disposal of all current utilities in the highway. Installation of OOC Lane footpath retention structures Installation of any other required Highway Civils Installation of all highway and foul drainage Installation of UKPN 132kV & 33kV duct routes, inclusive of any tunnel / subterranean system and the required temporary works The removal of any installed temporary works and the construction of the highway The installation of all highway furniture and its required infrastructure (traffic lights incl of ducting, islands, street lighting incl of ducting etc) Removal of temporary works installed by others to facilitate utility connections at the north and south end of the
No linked documents found for this notice.
External Link: https://www.contractsfinder.service.gov.uk/Notice/44b34daa-4df3-432a-8263-cf7c34fde72a
Link Description: Opportunity notice on Contracts Finder
External Link: https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=98553095
Link Description: Please follow this link to view the notice.
Document Description: Opportunity notice on Contracts Finder
Document Description: Please follow this link to view the notice.
{
"buyer": {
"id": "GB-CFS-130527",
"name": "Balfour Beatty VINCI Systra JV"
},
"date": "2025-08-21T13:55:04+01:00",
"id": "44b34daa-4df3-432a-8263-cf7c34fde72a-860311",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-b5fd17-b9e74b50-fd16-4bb2-9e8b-7bc6a60c5dbb",
"parties": [
{
"address": {
"countryName": "UK",
"locality": "Watford",
"postalCode": "WD244WW",
"streetAddress": "Astral House Imperial Way"
},
"contactPoint": {
"email": "supplychain@bbvsjv.com",
"name": "Manish Tailor",
"telephone": "07738982498"
},
"id": "GB-CFS-130527",
"identifier": {
"legalName": "Balfour Beatty VINCI Systra JV"
},
"name": "Balfour Beatty VINCI Systra JV",
"roles": [
"buyer"
]
}
],
"tag": [
"tender"
],
"tender": {
"additionalClassifications": [
{
"description": "Civil engineering support services",
"id": "71311100",
"scheme": "CPV"
}
],
"classification": {
"description": "Piling",
"id": "44212400",
"scheme": "CPV"
},
"contractPeriod": {
"endDate": "2028-12-01T23:59:59Z",
"startDate": "2026-08-16T00:00:00+01:00"
},
"datePublished": "2025-08-21T13:55:04+01:00",
"description": "WP15 Final highways scope\r\n \r\n The OOC Lane realignment \u0026 Final highways scope package consists of: \r\n \r\n Removal of all existing highway surfacing and street furniture (is there any to be retained / relocated or does it include disposal?) \r\n \r\n Installation of any temporary critical highway furniture (e.g. Street Lighting, Barriers) required to carry out the works \r\n \r\n Requirement to maintain a 2m wide footpath to be used by the public throughout the construction of the package, the subcontractor is to include the installation and maintenance of this public footpath, and relocation as required to suit the construction sequence. \r\n \r\n The excavation of the existing highway down to final formation level, and any other necessary levels required to enable temporary works or sequencing \r\n \r\n All temporary works required for the construction of the works, including any access requirements \r\n \r\n Assessments to structures, utilities, properties, which may be affected by the works, as required to satisfy client, Contractor and/or 3rd parties requirements \r\n \r\n Removal and disposal of all current utilities in the highway. \r\n \r\n Installation of OOC Lane footpath retention structures \r\n \r\n Installation of any other required Highway Civils \r\n \r\n Installation of all highway and foul drainage \r\n \r\n Installation of UKPN 132kV \u0026 33kV duct routes, inclusive of any tunnel / subterranean system and the required temporary works \r\n \r\n The removal of any installed temporary works and the construction of the highway \r\n \r\n The installation of all highway furniture and its required infrastructure\u202f \u202f \u202f (traffic lights incl of ducting, islands, street lighting incl of ducting etc) \r\n \r\n Removal of temporary works installed by others to facilitate utility connections at the north and south end of the",
"documents": [
{
"datePublished": "2025-08-21T13:55:04+01:00",
"description": "Opportunity notice on Contracts Finder",
"documentType": "tenderNotice",
"format": "text/html",
"id": "1",
"language": "en",
"url": "https://www.contractsfinder.service.gov.uk/Notice/44b34daa-4df3-432a-8263-cf7c34fde72a"
},
{
"description": "Please follow this link to view the notice.",
"documentType": "tenderNotice",
"id": "2",
"url": "https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=98553095"
}
],
"id": "C4N98553049",
"items": [
{
"deliveryAddresses": [
{
"countryName": "United Kingdom",
"region": "London"
}
],
"id": "1"
}
],
"mainProcurementCategory": "works",
"minValue": {
"amount": 10000000,
"currency": "GBP"
},
"procurementMethodDetails": "",
"status": "active",
"suitability": {
"sme": false,
"vcse": false
},
"tenderPeriod": {
"endDate": "2025-08-29T12:00:00+01:00"
},
"title": "WP15 Final Highways Scope - Old Oak Common (S4) Station",
"value": {
"amount": 20000000,
"currency": "GBP"
}
}
}