← Back to opportunities

Task Order from PDF framework for 612093 A46 Guys Cliffe Interchange

National Highways

Buyer Contact Info

Buyer Name: National Highways

Buyer Address: Three Snowhill, Birmingham, B4 6GA, England

Contact Email: ADProcurement@nationalhighways.co.uk

Status
complete
Procedure
selective
Value
167882.45 GBP
Published
19 Nov 2025, 12:06
Deadline
29 Jun 2025, 14:00
Contract Start
29 Jun 2025, 23:00
Contract End
13 Nov 2025, 23:59
Category
works
CPV
45233210 - Surface work for highways
Region
n/a
Awarded To
EUROVIA INFRASTRUCTURE LIMITED
Official Source
Open Contracts Finder

Description

Background Information for the proposed Work Order A46 Guys Cliffe IC contains two under bridges that carry the dual carriageway Warwick bypass over the interchange link roads with the A429 and B4115. The two bridges are single span simply supported structures with composite decks comprised of pre-stressed beams and 200mm thick slabs cast upon permanent formwork between beams. The end supports are reinforced concrete cantilever abutments, which are constructed in two sections and separated by a movement joint at the centre line. Each abutment is flanked by reinforced concrete tapered wing walls. The deck is free to move at the south end and fixed at the north end In November 2003, secondary Open Box Beam (OBB) Vehicle Restraint Systems (VRS) were installed on both sides of both structures to protect the existing substandard BACO Aluminum parapets (P1 System). The OBB barrier is flared back and connected into the Tensioned Corrugated Beams (TCB) barrier apart from ramped OBB barrier on the departure end of the South Bridge. This secondary OBB has substandard set-back and working width. The bridge records indicate that both bridges were re-waterproofed in 1993 by Acrylic and Polyurethane spray over the entire deck and again in 2003 with spray applied system at the verges only (on top of new C50 verge concrete) in conjunction with parapet protection works (OBB barrier installation). This is based on the 2003 Contract Drawing contained within IAMIS (S.22.002/A) and service life can be considered for minimum 35 years. The existing deck waterproofing at the North Bridge was damaged on both the northbound and southbound carriageways during a resurfacing intervention in 2013. The waterproofing remains in its damaged state. Following the option study undertaken by Kier to address the damaged waterproofing at the north bridge and the substandard secondary protection at both bridges, an addendum to the Options report was submitted. The addendum VRS replacement option on both bridges is to replace the VRS with new N2 W1 metal VRS and to replace the current verge with a new reinforced concrete plinth with cast-in cradles to form a fixing for the VRS and resin anchoring steel 'U' bars into the bridge deck. For the North Bridge, waterproofing will be sprayed from the new plinth, under the kerb, across the carriageway, and shall form a joint with the existing central reserve waterproofing in the channel fronting the kerb. For the South Bridge, waterproofing will be sprayed from the new plinth, under the kerb, and shall form a joint with the existing carriageway waterproofing in the channel fronting the kerb. A departure from standards has been approved for the new VRS to have reduced setbacks. An asbestos survey and adhesion testing of

Linked Documents

No linked documents found for this notice.

Opportunity Context

Raw Notice JSON

Expand raw payload
{
  "awards": [
    {
      "contractPeriod": {
        "endDate": "2025-11-13T23:59:59Z",
        "startDate": "2025-06-30T00:00:00+01:00"
      },
      "date": "2025-03-28T00:00:00Z",
      "datePublished": "2025-11-19T12:06:27Z",
      "documents": [
        {
          "datePublished": "2025-11-19T12:06:27Z",
          "description": "Awarded contract notice on Contracts Finder",
          "documentType": "awardNotice",
          "format": "text/html",
          "id": "1",
          "language": "en",
          "url": "https://www.contractsfinder.service.gov.uk/Notice/83517526-5936-45c7-ab46-daf34db8d25f"
        }
      ],
      "id": "ocds-b5fd17-93d4f52a-ccea-48ab-921f-ae4300e732ec-1",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-07388667",
          "name": "EUROVIA INFRASTRUCTURE LIMITED"
        }
      ],
      "value": {
        "amount": 167882.45,
        "currency": "GBP"
      }
    }
  ],
  "buyer": {
    "id": "GB-CFS-323818",
    "name": "National Highways"
  },
  "date": "2025-11-19T12:06:27Z",
  "id": "83517526-5936-45c7-ab46-daf34db8d25f-872740",
  "initiationType": "tender",
  "language": "en",
  "ocid": "ocds-b5fd17-93d4f52a-ccea-48ab-921f-ae4300e732ec",
  "parties": [
    {
      "address": {
        "countryName": "England",
        "locality": "Birmingham",
        "postalCode": "B4 6GA",
        "streetAddress": "Three Snowhill"
      },
      "contactPoint": {
        "email": "ADProcurement@nationalhighways.co.uk"
      },
      "id": "GB-CFS-323818",
      "identifier": {
        "legalName": "National Highways"
      },
      "name": "National Highways",
      "roles": [
        "buyer"
      ]
    },
    {
      "address": {
        "streetAddress": "Albion House, Springfield Road, Horsham, West Sussex, RH12 2RW"
      },
      "details": {
        "scale": "large",
        "vcse": false
      },
      "id": "GB-COH-07388667",
      "identifier": {
        "id": "07388667",
        "legalName": "EUROVIA INFRASTRUCTURE LIMITED",
        "scheme": "GB-COH"
      },
      "name": "EUROVIA INFRASTRUCTURE LIMITED",
      "roles": [
        "supplier"
      ]
    }
  ],
  "tag": [
    "award"
  ],
  "tender": {
    "classification": {
      "description": "Surface work for highways",
      "id": "45233210",
      "scheme": "CPV"
    },
    "contractPeriod": {
      "endDate": "2025-11-13T23:59:59Z",
      "startDate": "2025-06-30T00:00:00+01:00"
    },
    "description": "Background Information for the proposed Work Order\r\n\r\nA46 Guys Cliffe IC contains two under bridges that carry the dual carriageway Warwick bypass over the interchange link roads with the A429 and B4115. The two bridges are single span simply supported structures with composite decks comprised of pre-stressed beams and 200mm thick slabs cast upon permanent formwork between beams. The end supports are reinforced concrete cantilever abutments, which are constructed in two\r\nsections and separated by a movement joint at the centre line. Each abutment is flanked by reinforced concrete tapered wing walls. The deck is free to move at the south end and fixed at the north end\r\n\r\nIn November 2003, secondary Open Box Beam (OBB) Vehicle Restraint Systems (VRS) were installed on both sides of both structures to protect the existing substandard BACO Aluminum parapets (P1 System). The OBB barrier is flared back and connected into the Tensioned Corrugated Beams (TCB) barrier apart from ramped OBB barrier on the departure end of the South Bridge. This secondary OBB has substandard set-back and working width.\r\n\r\nThe bridge records indicate that both bridges were re-waterproofed in 1993 by Acrylic and Polyurethane spray over the entire deck and again in 2003 with spray applied system at the verges only (on top of new C50 verge\r\nconcrete) in conjunction with parapet protection works (OBB barrier installation). This is based on the 2003 Contract Drawing contained within IAMIS (S.22.002/A) and service life can be considered for minimum 35\r\nyears.\r\n\r\nThe existing deck waterproofing at the North Bridge was damaged on both the northbound and southbound carriageways during a resurfacing intervention in 2013. The waterproofing remains in its damaged state. Following the option study undertaken by Kier to address the damaged waterproofing at the north bridge and the substandard secondary protection at both bridges, an addendum to the Options report was submitted.\r\n\r\nThe addendum VRS replacement option on both bridges is to replace the VRS with new N2 W1 metal VRS and to replace the current verge with a new reinforced concrete plinth with cast-in cradles to form a fixing for the VRS and resin anchoring steel \u0027U\u0027 bars into the bridge deck. For the North Bridge, waterproofing will be sprayed from the new plinth, under the kerb, across the carriageway, and shall form a joint with the existing central reserve waterproofing in the channel fronting the kerb. \r\n\r\nFor the South Bridge, waterproofing will be sprayed from the new plinth, under the kerb, and shall form a joint with the existing carriageway waterproofing in the channel\r\nfronting the kerb. A departure from standards has been approved for the new VRS to have reduced setbacks. An asbestos survey and adhesion testing of",
    "id": "tender_512503/1533295",
    "items": [
      {
        "deliveryAddresses": [
          {
            "countryName": "United Kingdom",
            "region": "East Midlands"
          },
          {
            "countryName": "United Kingdom",
            "region": "West Midlands"
          }
        ],
        "id": "1"
      }
    ],
    "mainProcurementCategory": "works",
    "procurementMethod": "selective",
    "procurementMethodDetails": "Call-off from a framework agreement",
    "status": "complete",
    "suitability": {
      "sme": true,
      "vcse": false
    },
    "tenderPeriod": {
      "endDate": "2025-06-29T15:00:00+01:00"
    },
    "title": "Task Order from PDF framework for 612093 A46 Guys Cliffe Interchange",
    "value": {
      "amount": 167882.45,
      "currency": "GBP"
    }
  }
}