← Back to opportunities

A66 - Sheet Piles

BALFOUR BEATTY CIVIL ENGINEERING LIMITED

Buyer Contact Info

Buyer Name: BALFOUR BEATTY CIVIL ENGINEERING LIMITED

Buyer Address: 5 Churchill Pl, London, E145HU, England

Contact Name: Hannah Tuckley

Contact Email: A66expressionofinterest@balfourbeatty.com

Contact Telephone: 07395 881 614

Status
active
Procedure
selective
Value
5000.0 GBP
Published
20 Feb 2026, 15:01
Deadline
06 Mar 2026, 12:00
Contract Start
19 Apr 2026, 23:00
Contract End
24 Apr 2028, 22:59
Category
works
CPV
44212410 - Sheet piling
Region
n/a
Awarded To
n/a
Official Source
Open Contracts Finder

Description

1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b. 2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply: • Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements. 2.2 Installation of Sheet Piles The Contractor shall undertake: • Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. • Removal of sheet piles upon completion of works. 2.3 Associated Works The Contractor shall complete associated activities including: • Pile guide frames • Dewatering screens • Structural support components 2.4 Pre Construction & Site Activities Activities include: • Mobilisation and site establishment • Setting out • QA testing • Preparation of record drawings and certification 2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with: • BD 21/01 • National Highways Specification • Relevant BS/EN/Eurocode standards • CDM Regulations ________________________________________ 4. Key Supplier Requirements The Contractor must: • Demonstrate capability to manage CDM and SHES risks • Provide method statements, vibration and noise mitigation plans • Coordinate closely with Temporary Works Designers • Collaborate with the Balfour Beatty site and engineering teams • Submit all required QA documentation, including testing and certification evidence ________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including: • Early award and resource confirmation to reduce over commitment risks • Managing vibration and settlement risks through pre condition surveys and real time monitoring • Mitigating design or construction clashes through integrated design reviews and 3D coordination • Minimising traffic management delays via advanced planning and flexible work slots • Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms ________________________________________ 7. Deliverables The Contractor shall provide: • Complete installation of specified sheet piling works • Full QA documentation including test results and certification • As built / record drawings

Linked Documents

No linked documents found for this notice.

Opportunity Context

More Information Links

External Link: https://www.contractsfinder.service.gov.uk/Notice/d01423b9-4a9c-4c91-805d-4e080514de72

Link Description: Opportunity notice on Contracts Finder

Documents

Document Description: Opportunity notice on Contracts Finder

Raw Notice JSON

Expand raw payload
{
  "buyer": {
    "id": "GB-SRS-supplierregistration.cabinetoffice.gov.uk/UfZq8heB",
    "name": "BALFOUR BEATTY CIVIL ENGINEERING LIMITED"
  },
  "date": "2026-02-20T15:01:51Z",
  "id": "d01423b9-4a9c-4c91-805d-4e080514de72-885018",
  "initiationType": "tender",
  "language": "en",
  "ocid": "ocds-b5fd17-e39f13c2-839c-4446-9628-de54c20a7117",
  "parties": [
    {
      "address": {
        "countryName": "England",
        "locality": "London",
        "postalCode": "E145HU",
        "streetAddress": "5 Churchill Pl"
      },
      "contactPoint": {
        "email": "A66expressionofinterest@balfourbeatty.com",
        "name": "Hannah Tuckley",
        "telephone": "07395 881 614"
      },
      "id": "GB-SRS-supplierregistration.cabinetoffice.gov.uk/UfZq8heB",
      "identifier": {
        "id": "supplierregistration.cabinetoffice.gov.uk/UfZq8heB",
        "legalName": "BALFOUR BEATTY CIVIL ENGINEERING LIMITED",
        "scheme": "GB-SRS"
      },
      "name": "BALFOUR BEATTY CIVIL ENGINEERING LIMITED",
      "roles": [
        "buyer"
      ]
    }
  ],
  "tag": [
    "tender"
  ],
  "tender": {
    "classification": {
      "description": "Sheet piling",
      "id": "44212410",
      "scheme": "CPV"
    },
    "contractPeriod": {
      "endDate": "2028-04-24T23:59:59+01:00",
      "startDate": "2026-04-20T00:00:00+01:00"
    },
    "datePublished": "2026-02-20T15:01:51Z",
    "description": "1. Overview\r\nThe works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b.\r\n\r\n2. Detailed Scope\r\n2.1 Supply of Materials\r\nThe Contractor shall supply:\r\n\u2022\tSteel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements.  \r\n2.2 Installation of Sheet Piles\r\nThe Contractor shall undertake:\r\n\u2022\tPile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. \r\n\u2022\t Removal of sheet piles upon completion of works. \r\n2.3 Associated Works\r\nThe Contractor shall complete associated activities including:\r\n\u2022\tPile guide frames\r\n\u2022\tDewatering screens\r\n\u2022\tStructural support components\r\n2.4 Pre Construction \u0026 Site Activities\r\nActivities include:\r\n\u2022\tMobilisation and site establishment\r\n\u2022\tSetting out\r\n\u2022\tQA testing\r\n\u2022\tPreparation of record drawings and certification\r\n2.5 Coordination Requirements\r\nThe Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. \r\n________________________________________\r\n3. Standards \u0026 Compliance\r\nAll works must be carried out in accordance with:\r\n\u2022\tBD 21/01\r\n\u2022\tNational Highways Specification\r\n\u2022\tRelevant BS/EN/Eurocode standards\r\n\u2022\tCDM Regulations\r\n\r\n________________________________________\r\n4. Key Supplier Requirements\r\nThe Contractor must:\r\n\u2022\tDemonstrate capability to manage CDM and SHES risks \r\n\u2022\tProvide method statements, vibration and noise mitigation plans \r\n\u2022\tCoordinate closely with Temporary Works Designers\r\n\u2022\tCollaborate with the Balfour Beatty site and engineering teams \r\n\u2022\tSubmit all required QA documentation, including testing and certification evidence \r\n________________________________________\r\n5. Procurement \u0026 Delivery Model (Informational Context Only)\r\nA competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value.\r\n(You can exclude this section if you only need the technical scope.) \r\n________________________________________\r\n6. Risks \u0026 Mitigation - Contractor Responsibilities\r\nThe Contractor shall support risk management in areas including:\r\n\u2022\tEarly award and resource confirmation to reduce over commitment risks \r\n\u2022\tManaging vibration and settlement risks through pre condition surveys and real time monitoring\r\n\u2022\tMitigating design or construction clashes through integrated design reviews and 3D coordination \r\n\u2022\tMinimising traffic management delays via advanced planning and flexible work slots \r\n\u2022\tManaging steel/fuel cost volatility through early procurement and index linked pricing mechanisms \r\n________________________________________\r\n7. Deliverables\r\nThe Contractor shall provide:\r\n\u2022\tComplete installation of specified sheet piling works\r\n\u2022\tFull QA documentation including test results and certification \r\n\u2022\tAs built / record drawings",
    "documents": [
      {
        "datePublished": "2026-02-20T15:01:51Z",
        "description": "Opportunity notice on Contracts Finder",
        "documentType": "tenderNotice",
        "format": "text/html",
        "id": "1",
        "language": "en",
        "url": "https://www.contractsfinder.service.gov.uk/Notice/d01423b9-4a9c-4c91-805d-4e080514de72"
      }
    ],
    "id": "A66 - Sheet Piles",
    "items": [
      {
        "deliveryAddresses": [
          {
            "postalCode": "CA10 1XQ"
          }
        ],
        "id": "1"
      }
    ],
    "mainProcurementCategory": "works",
    "procurementMethod": "selective",
    "procurementMethodDetails": "Competitive procedure with negotiation (above threshold)",
    "status": "active",
    "suitability": {
      "sme": true,
      "vcse": false
    },
    "tenderPeriod": {
      "endDate": "2026-03-06T12:00:00Z"
    },
    "title": "A66 - Sheet Piles",
    "value": {
      "amount": 5000,
      "currency": "GBP"
    }
  }
}