← Back to opportunities

Task Order from PDF framework for (619572) M60 River Irk Waterproofing Scheme

National Highways

Buyer Contact Info

Buyer Name: National Highways

Buyer Address: Three Snowhill, Birmingham, B4 6GA, England

Contact Email: ADProcurement@nationalhighways.co.uk

Status
complete
Procedure
selective
Value
181335.24 GBP
Published
24 Sep 2025, 14:40
Deadline
15 Apr 2025, 14:00
Contract Start
12 Jun 2025, 23:00
Contract End
06 Feb 2026, 23:59
Category
works
CPV
45233210 - Surface work for highways
Region
n/a
Awarded To
BREEDON COLAS LIMITED
Official Source
Open Contracts Finder

Description

The M60 River Irk Bridge is a single-span, simply supported underbridge that carries the dual three-lane M60 Motorway and junction 19 slip roads over the River Irk and a riverside footpath. The deck consists of rolled steel beams, acting compositely with in-situ reinforced concrete slab. The deck is split into two halves, separated by a longitudinal joint in the central reserve. It is fixed at the west abutment and free at the east abutment. The structure was commissioned in 1996 and has a design capacity of HA + 45HB. During a previous resurfacing scheme over the bridge, the road planer damaged the deck waterproofing. According to the Aone+ waterproofing inspection report of 2010, the damage is in lane 3 in the anticlockwise direction, near the elastomeric joint on the east side of the bridge. The report also mentions that Volker Laser repaired the small, damaged areas however, the quality of repair is not sufficient as a long-term solution. There is no assurance of 150mm overlap between the existing waterproofing and waterproofing patch repair. Therefore, a long-term waterproofing solution is required on anticlockwise carriageway from stringcourse to stringcourse. Construction ECI was undertaken FY24/25 which included site surveys and agreement of works methodology and programme. The detailed design of the scheme has been completed by WSP

Linked Documents

No linked documents found for this notice.

Opportunity Context

Raw Notice JSON

Expand raw payload
{
  "awards": [
    {
      "contractPeriod": {
        "endDate": "2026-02-06T23:59:59Z",
        "startDate": "2025-06-13T00:00:00+01:00"
      },
      "date": "2025-04-15T00:00:00+01:00",
      "datePublished": "2025-09-24T15:40:44+01:00",
      "documents": [
        {
          "datePublished": "2025-09-24T15:40:44+01:00",
          "description": "Awarded contract notice on Contracts Finder",
          "documentType": "awardNotice",
          "format": "text/html",
          "id": "1",
          "language": "en",
          "url": "https://www.contractsfinder.service.gov.uk/Notice/ef593689-2f57-46a2-acfe-e2179507ba85"
        }
      ],
      "id": "ocds-b5fd17-856cc2af-b265-4ab7-8e33-c027b59f0e4a-1",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-14460477",
          "name": "BREEDON COLAS LIMITED"
        }
      ],
      "value": {
        "amount": 181335.24,
        "currency": "GBP"
      }
    }
  ],
  "buyer": {
    "id": "GB-CFS-323818",
    "name": "National Highways"
  },
  "date": "2025-09-24T15:40:44+01:00",
  "id": "ef593689-2f57-46a2-acfe-e2179507ba85-865281",
  "initiationType": "tender",
  "language": "en",
  "ocid": "ocds-b5fd17-856cc2af-b265-4ab7-8e33-c027b59f0e4a",
  "parties": [
    {
      "address": {
        "countryName": "England",
        "locality": "Birmingham",
        "postalCode": "B4 6GA",
        "streetAddress": "Three Snowhill"
      },
      "contactPoint": {
        "email": "ADProcurement@nationalhighways.co.uk"
      },
      "id": "GB-CFS-323818",
      "identifier": {
        "legalName": "National Highways"
      },
      "name": "National Highways",
      "roles": [
        "buyer"
      ]
    },
    {
      "address": {
        "streetAddress": "Pinnacle House Breedon Quarry, Breedon On The Hill, Derby, England, DE73 8AP"
      },
      "details": {
        "scale": "large",
        "vcse": false
      },
      "id": "GB-COH-14460477",
      "identifier": {
        "id": "14460477",
        "legalName": "BREEDON COLAS LIMITED",
        "scheme": "GB-COH"
      },
      "name": "BREEDON COLAS LIMITED",
      "roles": [
        "supplier"
      ]
    }
  ],
  "tag": [
    "award"
  ],
  "tender": {
    "classification": {
      "description": "Surface work for highways",
      "id": "45233210",
      "scheme": "CPV"
    },
    "contractPeriod": {
      "endDate": "2026-02-06T23:59:59Z",
      "startDate": "2025-06-13T00:00:00+01:00"
    },
    "description": "The M60 River Irk Bridge is a single-span, simply supported underbridge that carries the dual three-lane M60 \r\nMotorway and junction 19 slip roads over the River Irk and a riverside footpath. The deck consists of rolled steel \r\nbeams, acting compositely with in-situ reinforced concrete slab. The deck is split into two halves, separated by a \r\nlongitudinal joint in the central reserve. It is fixed at the west abutment and free at the east abutment. \r\n\r\nThe structure was commissioned in 1996 and has a design capacity of HA + 45HB.\r\nDuring a previous resurfacing scheme over the bridge, the road planer damaged the deck waterproofing. \r\nAccording to the Aone+ waterproofing inspection report of 2010, the damage is in lane 3 in the anticlockwise \r\ndirection, near the elastomeric joint on the east side of the bridge. The report also mentions that Volker Laser \r\nrepaired the small, damaged areas however, the quality of repair is not sufficient as a long-term solution. There \r\nis no assurance of 150mm overlap between the existing waterproofing and waterproofing patch repair. Therefore, \r\na long-term waterproofing solution is required on anticlockwise carriageway from stringcourse to stringcourse.\r\n\r\nConstruction ECI was undertaken FY24/25 which included site surveys and agreement of works methodology\r\nand programme. The detailed design of the scheme has been completed by WSP",
    "id": "tender_506402/1518568",
    "items": [
      {
        "deliveryAddresses": [
          {
            "countryName": "United Kingdom",
            "region": "North East"
          },
          {
            "countryName": "United Kingdom",
            "region": "North West"
          }
        ],
        "id": "1"
      }
    ],
    "mainProcurementCategory": "works",
    "procurementMethod": "selective",
    "procurementMethodDetails": "Call-off from a framework agreement",
    "status": "complete",
    "suitability": {
      "sme": true,
      "vcse": false
    },
    "tenderPeriod": {
      "endDate": "2025-04-15T15:00:00+01:00"
    },
    "title": "Task Order from PDF framework for (619572) M60 River Irk Waterproofing Scheme",
    "value": {
      "amount": 181335.24,
      "currency": "GBP"
    }
  }
}