Buyer Name: East Dunbartonshire Council
Buyer Address: 12 Strathkelvin Place, Kirkintilloch, UKM81, G66 1TJ
Contact Name: Lorna Dunn
Contact Email: Lorna.Dunn@eastdunbarton.gov.uk
Buyer Name: East Dunbartonshire Council
Buyer Address: 12 Strathkelvin Place, Kirkintilloch, UKM81, G66 1TJ
Contact Name: Lorna Dunn
Contact Email: Lorna.Dunn@eastdunbarton.gov.uk
The Authority wishes to establish a contract for Traffic Management Services (TMS) across the EDC authority area, the contract will be utilised primarily to support Capital Investment and Maintenance Programmes of work however will be accessible to all authority departments. The contractor is required to provide the design of Traffic Management Plans, provision of all signage and associated TMS equipment & operatives, installation, maintenance, relocation, removal of equipment, project management of Traffic Management Plan and emergency response.
Some PCS documents require login and recording interest on the source portal before download links are available.
No linked documents found for this notice.
External Link: https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=OCT540725
Link Title: EDC/2025/4212 Traffic Management
Link Description: The Authority wishes to establish a contract for Traffic Management Services (TMS) across the EDC authority area, the contract will be utilised primarily to support Capital Investment and Maintenance Programmes of work however will be accessible to all authority departments. The contractor is required to provide the design of Traffic Management Plans, provision of all signage and associated TMS equipment & operatives, installation, maintenance, relocation, removal of equipment, project management of Traffic Management Plan and emergency response.
Lot Description: Key Requirements to be Delivered (Statement of Requirements) The key requirements include, but are not limited to: The design of Traffic Management Plans, site specific RAMS and where applicable Diversion Plan in conjunction with EDC officers; Installation, Maintenance, Relocation & Removal of all Traffic Management equipment and systems as detailed in the Schedule of Rates including but not limited to; Traffic Management Supervisor & Operatives to maintain integrity of Traffic Management system and support nearby residents or businesses Stop/Go Board Traffic Management Temporary and Portable 2,3 & 4 way traffic signals and pedestrian crossing signals. Road Closure with up to 30 or 60 standard diversion route signs on roads with a speed limit of 40mph or less, 50mph to 60mph or national speed limit. Install, Maintain & Remove pedestrian barriers interlinked and including any couplings and footings, compliant with BS EN 8442 & BS EN 12899-4 reflectivity requirement and supports Chapter 8 protocols. Install, Maintain & Remove Pedestrian Barriers heavy duty fixed leg, Metal crowd Control. 1100mm high and Heras Fencing approx 2000mm high, Galvanised to BS EN 10244-2 Install, Maintain & Remove No waiting cones 500mm Install, Maintain & Remove Traffic Cones 500mm, 750mm & 1000mm Install, Maintain & Remove Standard Road Signs in accordance with Chapter 8 and TSRGD guidelines Install, Maintain & Remove Site Specific bespoke Signage. Install, Maintain & Remove Specialist Diversion Signs or Advance Warning Signs In Class RA1 Reflective Material. In accordance with Chapter 8 and TSRGD guideline Install, Maintain & Remove Specialist Diversion Signs or Advance Warning Signs In Class RA2 Reflective Material. In accordance with Chapter 8 and TSRGD guidelines Install, Maintain & Remove Portable Variable message signs â specification in Appendix 2: EDC20254212 TM ITT APPENDIX 2 Specification Portable Variable Message Signs Maintenance of temporary access to property Convoy System, 1,2 or 3 vehicles Impact Protection Vehicle Dual Carriageway Closure on roads with a speed limit of 40mpg or less, 50mpg to 6-mph or national speed limit. Contraflow on roads with a speed limit of 40mpg or less, 50mpg to 6-mph or national speed limit Welfare Facilities Project Management of all Traffic Management Services from installation to removal, ensuring minimal disruption and inconvenience to EDC residents; Rectification of TM equipment failure in within 2 hours; Commitment to maintain a named foreman at each site for duration of works, except in exceptional circumstances. Compliance with EDC Health & Safety requirements
Lot 1 Status: complete
Lot 1 Has Options: No
Lot 1 Award Criterion (quality): Quality
Document Title: EDC/2025/4212 Traffic Management
Document Description: The Authority wishes to establish a contract for Traffic Management Services (TMS) across the EDC authority area, the contract will be utilised primarily to support Capital Investment and Maintenance Programmes of work however will be accessible to all authority departments. The contractor is required to provide the design of Traffic Management Plans, provision of all signage and associated TMS equipment & operatives, installation, maintenance, relocation, removal of equipment, project management of Traffic Management Plan and emergency response.
{
"awards": [
{
"id": "EDC/2025/4212",
"relatedLots": [
"1"
],
"suppliers": [
{
"id": "org-339",
"name": "Markon Limited"
}
]
}
],
"bids": {
"statistics": [
{
"id": "936",
"measure": "bids",
"relatedLot": "1",
"value": 8.0
},
{
"id": "937",
"measure": "smeBids",
"relatedLot": "1",
"value": 8.0
},
{
"id": "938",
"measure": "foreignBidsFromEU",
"relatedLot": "1",
"value": 0.0
},
{
"id": "939",
"measure": "foreignBidsFromNonEU",
"relatedLot": "1",
"value": 8.0
},
{
"id": "940",
"measure": "electronicBids",
"relatedLot": "1",
"value": 8.0
}
]
},
"buyer": {
"id": "org-227",
"name": "East Dunbartonshire Council"
},
"contracts": [
{
"awardID": "EDC/2025/4212",
"dateSigned": "2025-09-30T00:00:00Z",
"id": "EDC/2025/4212",
"status": "active",
"value": {
"amount": 1500000.0,
"currency": "GBP"
}
}
],
"date": "2025-10-06T00:00:00Z",
"description": "(SC Ref:812141)",
"id": "rls-104-OCT540725",
"initiationType": "tender",
"language": "EN",
"links": [
{
"href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000801200",
"rel": "canonical"
}
],
"ocid": "ocds-r6ebe6-0000801200",
"parties": [
{
"address": {
"locality": "Kirkintilloch",
"postalCode": "G66 1TJ",
"region": "UKM81",
"streetAddress": "12 Strathkelvin Place"
},
"contactPoint": {
"email": "Lorna.Dunn@eastdunbarton.gov.uk",
"name": "Lorna Dunn",
"url": "http://"
},
"details": {
"classifications": [
{
"id": "Regional or local authority",
"scheme": "TED_CA_TYPE"
},
{
"description": "Education",
"id": "09",
"scheme": "COFOG"
},
{
"description": "Social protection",
"id": "10",
"scheme": "COFOG"
},
{
"description": "General public services",
"id": "01",
"scheme": "COFOG"
}
],
"url": "http://www.eastdunbarton.gov.uk"
},
"id": "org-227",
"identifier": {
"legalName": "East Dunbartonshire Council"
},
"name": "East Dunbartonshire Council",
"roles": [
"buyer",
"centralPurchasingBody"
]
},
{
"address": {
"locality": "Cumbernauld",
"postalCode": "G67 3EN",
"region": "UKM",
"streetAddress": "Antonine House, 6-10 Dunnswood Road"
},
"contactPoint": {
"telephone": "+44 01236875134"
},
"details": {
"scale": "sme",
"url": "http://"
},
"id": "org-339",
"identifier": {
"legalName": "Markon Limited"
},
"name": "Markon Limited",
"roles": [
"supplier"
]
},
{
"address": {
"locality": "Glasgow"
},
"contactPoint": {
"url": "http://"
},
"id": "org-145",
"identifier": {
"legalName": "Glasgow Sheriff Court"
},
"name": "Glasgow Sheriff Court",
"roles": [
"reviewBody"
]
}
],
"relatedProcesses": [
{
"id": "1",
"identifier": "2025/S 000-031055",
"relationship": [
"planning"
],
"scheme": "EU-OJ"
}
],
"tag": [
"award",
"contract"
],
"tender": {
"classification": {
"id": "63712700",
"scheme": "CPV"
},
"coveredBy": [
"GPA"
],
"description": "The Authority wishes to establish a contract for Traffic Management Services (TMS) across the EDC authority area, the contract will be utilised primarily to support Capital Investment and Maintenance Programmes of work however will be accessible to all authority departments.\r\n The contractor is required to provide the design of Traffic Management Plans, provision of all signage and associated TMS equipment \u0026 operatives, installation, maintenance, relocation, removal of equipment, project management of Traffic Management Plan and emergency response.",
"documents": [
{
"description": "The Authority wishes to establish a contract for Traffic Management Services (TMS) across the EDC authority area, the contract will be utilised primarily to support Capital Investment and Maintenance Programmes of work however will be accessible to all authority departments.\r\n The contractor is required to provide the design of Traffic Management Plans, provision of all signage and associated TMS equipment \u0026 operatives, installation, maintenance, relocation, removal of equipment, project management of Traffic Management Plan and emergency response.",
"documentType": "awardNotice",
"format": "text/html",
"id": "OCT540725",
"title": "EDC/2025/4212 Traffic Management",
"url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=OCT540725"
}
],
"id": "ocds-r6ebe6-0000801200",
"items": [
{
"additionalClassifications": [
{
"id": "45233294",
"scheme": "CPV"
},
{
"id": "34992200",
"scheme": "CPV"
},
{
"id": "34992100",
"scheme": "CPV"
},
{
"id": "34996100",
"scheme": "CPV"
},
{
"id": "63712700",
"scheme": "CPV"
},
{
"id": "34928460",
"scheme": "CPV"
},
{
"id": "34928110",
"scheme": "CPV"
},
{
"id": "34928300",
"scheme": "CPV"
},
{
"id": "34923000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"region": "UKM81"
}
],
"id": "1",
"relatedLot": "1"
}
],
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"lots": [
{
"awardCriteria": {
"criteria": [
{
"description": "40",
"name": "Quality",
"type": "quality"
},
{
"description": "60",
"type": "price"
}
]
},
"description": "Key Requirements to be Delivered (Statement of Requirements)\r\n The key requirements include, but are not limited to:\r\n The design of Traffic Management Plans, site specific RAMS and where applicable Diversion Plan in conjunction with EDC officers;\r\n Installation, Maintenance, Relocation \u0026 Removal of all Traffic Management equipment and systems as detailed in the Schedule of Rates including but not limited to;\r\n Traffic Management Supervisor \u0026 Operatives to maintain integrity of Traffic Management system and support nearby residents or businesses\r\n Stop/Go Board Traffic Management\r\n Temporary and Portable 2,3 \u0026 4 way traffic signals and pedestrian crossing signals.\r\n Road Closure with up to 30 or 60 standard diversion route signs on roads with a speed limit of 40mph or less, 50mph to 60mph or national speed limit.\r\n Install, Maintain \u0026 Remove pedestrian barriers interlinked and including any couplings and footings, compliant with BS EN 8442 \u0026 BS EN 12899-4 reflectivity requirement and supports Chapter 8 protocols.\r\n Install, Maintain \u0026 Remove Pedestrian Barriers heavy duty fixed leg, Metal crowd Control. 1100mm high and Heras Fencing approx 2000mm high, Galvanised to BS EN 10244-2\r\n Install, Maintain \u0026 Remove No waiting cones 500mm\r\n Install, Maintain \u0026 Remove Traffic Cones 500mm, 750mm \u0026 1000mm\r\n Install, Maintain \u0026 Remove Standard Road Signs in accordance with Chapter 8 and TSRGD guidelines\r\n Install, Maintain \u0026 Remove Site Specific bespoke Signage.\r\n Install, Maintain \u0026 Remove Specialist Diversion Signs or Advance Warning Signs In Class RA1 Reflective Material. In accordance with Chapter 8 and TSRGD guideline\r\n Install, Maintain \u0026 Remove Specialist Diversion Signs or Advance Warning Signs In Class RA2 Reflective Material. In accordance with Chapter 8 and TSRGD guidelines\r\n Install, Maintain \u0026 Remove Portable Variable message signs \u00e2\u0080\u0093 specification in Appendix 2:\r\n EDC20254212 TM ITT APPENDIX 2 Specification Portable Variable Message Signs\r\n Maintenance of temporary access to property\r\n Convoy System, 1,2 or 3 vehicles\r\n Impact Protection Vehicle\r\n Dual Carriageway Closure on roads with a speed limit of 40mpg or less, 50mpg to 6-mph or national speed limit.\r\n Contraflow on roads with a speed limit of 40mpg or less, 50mpg to 6-mph or national speed limit\r\n Welfare Facilities\r\n Project Management of all Traffic Management Services from installation to removal, ensuring minimal disruption and inconvenience to EDC residents;\r\n Rectification of TM equipment failure in within 2 hours;\r\n Commitment to maintain a named foreman at each site for duration of works, except in exceptional circumstances.\r\n Compliance with EDC Health \u0026 Safety requirements",
"hasOptions": false,
"id": "1",
"status": "complete"
}
],
"mainProcurementCategory": "services",
"procurementMethod": "open",
"procurementMethodDetails": "Open procedure",
"status": "complete",
"title": "EDC/2025/4212 Traffic Management"
}
}