Buyer Name: NHS Lanarkshire
Buyer Address: NHS Lanarkshire Headquarters, Kirklands, Fallside Road, Bothwell, UKM84, G71 8BB
Contact Email: bronwyn.bainbridge@lanarkshire.scot.nhs.uk
Contact Telephone: +44 1698752649
Buyer Name: NHS Lanarkshire
Buyer Address: NHS Lanarkshire Headquarters, Kirklands, Fallside Road, Bothwell, UKM84, G71 8BB
Contact Email: bronwyn.bainbridge@lanarkshire.scot.nhs.uk
Contact Telephone: +44 1698752649
NHS Lanarkshire requires NEC4 Supervisor services and clerk of works duties services for the Monklands Replacement Project (MRP). The full extent of the services is subject to the execution of the Works Contracts for MRP and could include: enabling works, road works, input to scope (Works Scope) in the run up to Final Business Case (FBC); and after FBC approval, if received. Work is expected to start in 2025, with hospital completion in 2030/2031, with a defects liability period of 2 years.
Some PCS documents require login and recording interest on the source portal before download links are available.
No linked documents found for this notice.
External Link: https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=AUG537062
Link Title: NHSL743 NEC4 Supervisor with clerk of works duties for the Monklands Replacement Project
Link Description: NHS Lanarkshire requires NEC4 Supervisor services and clerk of works duties services for the Monklands Replacement Project (MRP). The full extent of the services is subject to the execution of the Works Contracts for MRP and could include: enabling works, road works, input to scope (Works Scope) in the run up to Final Business Case (FBC); and after FBC approval, if received. Work is expected to start in 2025, with hospital completion in 2030/2031, with a defects liability period of 2 years.
Lot Description: NHS Lanarkshire requires an NEC4 Supervisor with clerk of works duties for the Monklands Replacement Project (MRP). The main contract is a design and build NEC4 ECC contract and there is the potential for up to two other NEC4 ECC contracts all forming part of the same project. Initially, the service is needed for the Enabling Works, and services for the Main Works contract will be required once FBC is approved. There might also be a roadworks contract during the period of the main works contract. Enabling Works are expected to start April 2025. On FBC, the Main Works Contract will commence. There is expected to be a programme overlap of the Enabling Works and the Main Works. Although work on the site will commence in 2025, the NEC4 Supervisor with clerk of works duties is expected to join the team once appointed, and contribute to the Works Scope and the test/inspection regime in particular. The Consultant, from appointment, is expected to input on drawings and the Works Scope under the contract and to engage relevant to NEC4 Supervisorâs duties at an early stage. The NEC4 Supervisor is expected to continue with its service until the Main Works defects date, which will be 2 years after the completion of the new hospital in 2030/2031. The Consultant is expected to be experienced in healthcare projects and will be an integral part of the project team.
Lot 1 Status: complete
Lot 1 Has Options: No
Lot 1 Award Criterion (quality): Technical
Document Title: NHSL743 NEC4 Supervisor with clerk of works duties for the Monklands Replacement Project
Document Description: NHS Lanarkshire requires NEC4 Supervisor services and clerk of works duties services for the Monklands Replacement Project (MRP). The full extent of the services is subject to the execution of the Works Contracts for MRP and could include: enabling works, road works, input to scope (Works Scope) in the run up to Final Business Case (FBC); and after FBC approval, if received. Work is expected to start in 2025, with hospital completion in 2030/2031, with a defects liability period of 2 years.
{
"awards": [
{
"hasSubcontracting": true,
"id": "NHSL743",
"relatedLots": [
"1"
],
"subcontracting": {
"description": "MEP",
"maximumPercentage": 0.35,
"minimumPercentage": 0.35
},
"suppliers": [
{
"id": "org-179",
"name": "AtkinsR\u00c3\u00a9alis PPS Limited (formerly Faithful+Gould)"
}
]
}
],
"bids": {
"statistics": [
{
"id": "421",
"measure": "bids",
"relatedLot": "1",
"value": 2.0
},
{
"id": "422",
"measure": "smeBids",
"relatedLot": "1",
"value": 0.0
},
{
"id": "423",
"measure": "foreignBidsFromEU",
"relatedLot": "1",
"value": 0.0
},
{
"id": "424",
"measure": "foreignBidsFromNonEU",
"relatedLot": "1",
"value": 2.0
},
{
"id": "425",
"measure": "electronicBids",
"relatedLot": "1",
"value": 2.0
}
]
},
"buyer": {
"id": "org-178",
"name": "NHS Lanarkshire"
},
"contracts": [
{
"awardID": "NHSL743",
"dateSigned": "2025-07-15T00:00:00Z",
"id": "NHSL743",
"status": "active",
"value": {
"amount": 9754229.48,
"currency": "GBP"
}
}
],
"date": "2025-08-14T00:00:00Z",
"description": "Professional indemnity insurance: not less than ten million pounds (GBP10,000,000) in the annual aggregate with a minimum of two automatic reinstatements of the limit;\r\n Employer\u00e2\u0080\u0099s Liability insurance: the Consultant requires to maintain Employer\u0027s Liability insurance;\r\n Public Liability insurance: not less than ten million pounds (GBP10,000,000) in respect of any one occurrence, the number of occurrences being unlimited.\r\n The tenderer is required to provide a separate SPD response (Sections A and B of Part II and Part III) for each subcontractor who will Provide the Service.\r\n The tenderer is required to provide quality management and environmental management information as required by Schedule 3B.\r\n The estimated value of the contract is a result of the envisaged length of the contract. It is possible the value of the contract may vary in accordance with the contract to reflect changes to or increase in the MRP timescales, as the project may vary.\r\n (SC Ref:807206)",
"id": "rls-46-AUG537062",
"initiationType": "tender",
"language": "EN",
"links": [
{
"href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000776811",
"rel": "canonical"
}
],
"ocid": "ocds-r6ebe6-0000776811",
"parties": [
{
"address": {
"locality": "Bothwell",
"postalCode": "G71 8BB",
"region": "UKM84",
"streetAddress": "NHS Lanarkshire Headquarters, Kirklands, Fallside Road"
},
"contactPoint": {
"email": "bronwyn.bainbridge@lanarkshire.scot.nhs.uk",
"telephone": "+44 1698752649",
"url": "http://"
},
"details": {
"classifications": [
{
"id": "Body governed by public law",
"scheme": "TED_CA_TYPE"
},
{
"description": "Health",
"id": "07",
"scheme": "COFOG"
}
],
"url": "http://www.nhslanarkshire.org.uk"
},
"id": "org-178",
"identifier": {
"legalName": "NHS Lanarkshire"
},
"name": "NHS Lanarkshire",
"roles": [
"buyer",
"centralPurchasingBody"
]
},
{
"address": {
"locality": "Glasgow",
"postalCode": "G2 8NJ",
"region": "UK",
"streetAddress": "2 Atlantic Square, York Street"
},
"contactPoint": {
"telephone": "+44 2071212121"
},
"details": {
"scale": "large",
"url": "http://"
},
"id": "org-179",
"identifier": {
"legalName": "AtkinsR\u00c3\u00a9alis PPS Limited (formerly Faithful+Gould)"
},
"name": "AtkinsR\u00c3\u00a9alis PPS Limited (formerly Faithful+Gould)",
"roles": [
"supplier"
]
},
{
"address": {
"locality": "Edinburgh",
"postalCode": "EH1 1RQ",
"streetAddress": "Parliament Square"
},
"contactPoint": {
"url": "http://"
},
"id": "org-38",
"identifier": {
"legalName": "Court of Session"
},
"name": "Court of Session",
"roles": [
"reviewContactPoint",
"reviewBody"
]
}
],
"relatedProcesses": [
{
"id": "1",
"identifier": "2024/S 000-035377",
"relationship": [
"planning"
],
"scheme": "EU-OJ"
}
],
"tag": [
"award",
"contract"
],
"tender": {
"classification": {
"id": "71000000",
"scheme": "CPV"
},
"coveredBy": [
"GPA"
],
"description": "NHS Lanarkshire requires NEC4 Supervisor services and clerk of works duties services for the Monklands Replacement Project (MRP). The full extent of the services is subject to the execution of the Works Contracts for MRP and could include: enabling works, road works, input to scope (Works Scope) in the run up to Final Business Case (FBC); and after FBC approval, if received. Work is expected to start in 2025, with hospital completion in 2030/2031, with a defects liability period of 2 years.",
"documents": [
{
"description": "NHS Lanarkshire requires NEC4 Supervisor services and clerk of works duties services for the Monklands Replacement Project (MRP). The full extent of the services is subject to the execution of the Works Contracts for MRP and could include: enabling works, road works, input to scope (Works Scope) in the run up to Final Business Case (FBC); and after FBC approval, if received. Work is expected to start in 2025, with hospital completion in 2030/2031, with a defects liability period of 2 years.",
"documentType": "awardNotice",
"format": "text/html",
"id": "AUG537062",
"title": "NHSL743 NEC4 Supervisor with clerk of works duties for the Monklands Replacement Project",
"url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=AUG537062"
}
],
"id": "NHSL743",
"items": [
{
"additionalClassifications": [
{
"id": "71310000",
"scheme": "CPV"
},
{
"id": "71300000",
"scheme": "CPV"
},
{
"id": "71500000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"region": "UKM84"
}
],
"deliveryLocation": {
"description": "Wester Moffat site, Airdrie, Lanarkshire"
},
"id": "1",
"relatedLot": "1"
}
],
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"lots": [
{
"awardCriteria": {
"criteria": [
{
"description": "70",
"name": "Technical",
"type": "quality"
},
{
"description": "30",
"type": "price"
}
]
},
"description": "NHS Lanarkshire requires an NEC4 Supervisor with clerk of works duties for the Monklands Replacement Project (MRP). The main contract is a design and build NEC4 ECC contract and there is the potential for up to two other NEC4 ECC contracts all forming part of the same project. Initially, the service is needed for the Enabling Works, and services for the Main Works contract will be required once FBC is approved. There might also be a roadworks contract during the period of the main works contract. Enabling Works are expected to start April 2025. On FBC, the Main Works Contract will commence. There is expected to be a programme overlap of the Enabling Works and the Main Works. Although work on the site will commence in 2025, the NEC4 Supervisor with clerk of works duties is expected to join the team once appointed, and contribute to the Works Scope and the test/inspection regime in particular. The Consultant, from appointment, is expected to input on drawings and the Works Scope under the contract and to engage relevant to NEC4 Supervisor\u00e2\u0080\u0099s duties at an early stage. The NEC4 Supervisor is expected to continue with its service until the Main Works defects date, which will be 2 years after the completion of the new hospital in 2030/2031. The Consultant is expected to be experienced in healthcare projects and will be an integral part of the project team.",
"hasOptions": false,
"id": "1",
"status": "complete"
}
],
"mainProcurementCategory": "services",
"procurementMethod": "selective",
"procurementMethodDetails": "Competitive procedure with negotiation",
"status": "complete",
"title": "NHSL743 NEC4 Supervisor with clerk of works duties for the Monklands Replacement Project"
}
}